Glitrevannverket IKSDRAMMENTED
Step 1. New main water pipeline Kleivdammen – Liertoppen. Contract E2, Lierelva - Liertoppen
Prequalification for Stage 1 of Contract E2 (Lierelva–Liertoppen) for the new main water pipeline from Kleivdammen to Liertoppen.
No credit card · Instant access
Content at a glance
Prequalification for Stage 1 of Contract E2 (Lierelva–Liertoppen) for the new main water pipeline from Kleivdammen to Liertoppen.
- Tender type:
- Tender
- Contracting authority:
- Glitrevannverket IKS
- Published:
- May 14, 2026
- Deadline:
- June 23, 2026
- Object:
- Trinkwasserleitung / Versorgungsnetz
Object classification
- Trinkwasserleitung / VersorgungsnetzPrimary
Tender description
Prequalification for Stage 1 of Contract E2 (Lierelva–Liertoppen) for the new main water pipeline from Kleivdammen to Liertoppen.
Further details
After registration, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
Documents and attachments
49 files recorded- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Related tenders
10- Glitrevannverket IKSDRAMMENDeadline: Jun 23
Step 1. New main water pipeline Kleivdammen – Liertoppen. Contract E1, Kleivdammen – Lierelva
See the tender documentation. Stage 1 of the tender contest involves prequalification. - Trondheim kommuneTRONDHEIM
Contract - 420768 Fossumdalen stage 5-6, Pipeline route.
"Fossumdalen stage 5-6 - Ledningstrasé" is part of a larger water and sewage project in Trondheim municipality that has run, and shall run, over several stages. The aim is to reduce the amount of overflow supplied to The River Nidelva from the sewage network by establishing a separated main stem for W&S from the sewage zone Lerkendal where surface water is led to the River Nidelva, and waste water is fed by a self-fall to Høvringen treatment facility. In "Fossumdalen stage 5-6, Ledningstrasé", the existing overflow (OP04) shall be established in "Fossumdalen stage 4" connects to the Høvringen sewage tunnel via a diving pipeline under the River Nidelva with a flushing magazine. The pipeline installation starts with drilling rock from the west side of Osloveien south of Stavne to Høvringen sewage tunnel. Under osloveien, a sewage pipeline is laid through a completed freighter and dug a ditch to the east between the properties in Sivert Dahlens veg. Pipelines that controlled drilling will be executed under the River Nidelva to Valøya. Over Valøya and up to Valøyslyngen, pipelines are to be dug in a ditch. Pipelines in valøyslyngen shall be executed in an increased dimension, which together with the existing volume in the existing sewage pipeline upstream OP04 (new overflow) functions as flushing magnet for the diving line. The flushing magazine shall be emptied via a flush manhole and the facility shall be adapted for the supply of water from the municipality ́s water pipelines. A new water and sewage system shall also be constructed from OP04 (a new overflow) to the junction of Alfred Larsens gate and Valøyslyngen. From the junction of Alfred Larsens gate and valøyslyngen, a new water pipeline will be laid in the same route as the existing water pipeline to Holtermanns road. The following turnkey contracts will be transported to the general contractor:1 "Fossumdalen stage 5-6 - Sewage pump station" (the existing sewage pump station APS is replaced by a smaller and more modern sewage pump station APS04.2 "Fossumdalen section 5-6, HVAC, management and automation"The general contractor will take over, among other things, the engineering design and coordination responsibility for these two turnkey contracts. As part of "Fossumdalen stage 5-6, Ledningstrasé", a sheet box shall be prepared for a sheet box for setting down the new APS04, and the existing Water and Sewage will be connected to the new APS04. - Gjøvikregionen - AnskaffelserGJØVIKDeadline: Aug 21
Reserve water project Gjøvik‑Biri – Raw water pump station (V2)
Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed. - Gjøvikregionen - AnskaffelserGJØVIK
BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed. - Gjøvikregionen - AnskaffelserGJØVIKDeadline: Jul 31
BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Gjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as the establishment of a connection point for the continuation of the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed. - Modum kommuneVikersundDeadline: Jun 25
Request for information (RFI) for intake pipelines/submarine pipelines for a new water treatment facility.
MK plans to hold a competition for a turnkey contract for the delivery and laying of intake pipelines for the municipality ́s new waterworks and back-up water source (E4). Modum municipal waterworks supplies approx. 10,000 persons and the intake shall have a capacity of 90 l/s. The intake for the reserve water source shall be in Bergsjø at Geithus in Modum. Bergsjø is immediately located downstream of Tyrifjorden in drammensvassdraget. The turnkey contract is intended to include delivery and laying of intake pipelines, complete including intake and any diving and underwater works. The interface will be at the raw water pump station. We would like feedback from relevant contractors and suppliers before the competition is announced with this RFI - Request for information. MK would like to get feedback from the market about interested suppliers/contractors, possible systems and products and will assess adapting their tender documentation to the systems the market can offer. - Ringsaker kommuneBRUMUNDDALDeadline: Sep 09
Flåhagen water reservoir
Ringsaker municipality shall construct a new elevated water reservoir at Flåhagen by Nordåsvegen east of the centre of Brumunddal. The new reservoir shall replace the current reservior, which is of older date and has a bad technical condition. The Flåhagen elevated basin supplies the area in Brumunddal, which is lower than the kot 190 south of the River Brumunda. The Flåhagen elevated basin is to be supplied with pumps from Narud waterworks, while pumps at the new reservoir shall supply the further up to the Spikdalen elevated basin in the higher pressure zone. A new arrival shall be established from Nordåsvegen via Testament Road to a new basin, as well as new water pipelines from Mausetvegen to the reservoir and on to the existing Water and Sewage installations at Nordåsvegen. This development is the first stage of a development that also includes a new water supply to the Spikdalen elevated basin. Spikdalen elevated basin with a new water pipeline from Flåhagen elevated basin shall be developed in the next stage to ensure sufficient capacity for future residential areas. - Trondheim kommuneTRONDHEIMDeadline: May 15
Contract - 420768 Fossumdalen stage 5-6, Pipeline route.
Part of Trondheim's water/sewage project to reduce overflow to River Nidelva. Stage 5-6 establishes overflow OP04 connecting to Høvringen sewage tunnel via diving pipeline under river with flushing magazine. Pipeline: rock drilling from west Osloveien to Høvringen tunnel, sewage pipe laid under Osloveien, controlled drilling under Nidelva to Valøya, then ditched on Valøya and Valøyslyngen (increased dimension for flushing). Flushing magazine emptied via manhole, adapted for water supply. New water/sewage from OP04 to Alfred Larsens gate/Valøyslyngen junction, then new water pipe to Holtermanns road. - Trondheim kommuneTRONDHEIM
Contract award Contract - 320133/430107 Ladebekken-Rosenborg, stage 4
Ladebekken-Rosenborg (Laderos), Stage 4, is the fourth stage of a total of 5 stages for separation of sewage and renewal water, for an area that stretches from Ladebekken to Rosenborg.The contract includes replacing water pipes and separation of sewage installations, re-establishing roads as well as renewing street lights in several streets in the Rosenborg area. At the same time OPI channels and cable installations shall be established for Tensio. The facility comprises 3,400 m ditch for water and sewage installations and 1,300 m ditches for sand traps and service pipes. A sewage system shall be constructed with a separate system and this shall replace the existing system with a joint system. A new water supply plant shall be constructed in a joint route with the sewage facility. Parts of the transfer pipeline for water supply from Kuhaugen basin towards the city centre shall also be replaced. The new water and sewage pipelines shall mainly be laid along the current pipeline routes. - KYSTVERKETÅLESUNDDeadline: Sep 03
Contract submarine pipelines Stad ship tunnel
The Norwegian Coastal Administration shall execute a contract for the establishment of water pipelines in the sea, in Vanylvsfjorden and in Moldefjorden. This will be carried out to ensure the delivery of water to the construction areas for the upcoming turnkey contract for the construction of Stad ship tunnel and to permanent water supply to Stad and Vanylven municipalities after the completion of Stad Skipstunnel.The project is a cooperation between the Norwegian Coastal Administration and the municipalities Stad and Vanylven.Questions on whether the competition will not be answered in weeks 28 - empty. 31 due to holiday development.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 23. Juni 2026.
- Who is the contracting authority?
- The contracting authority is Glitrevannverket IKS.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.