KYSTVERKETÅLESUNDTED
Contract submarine pipelines Stad ship tunnel
The Norwegian Coastal Administration shall execute a contract for the establishment of water pipelines in the sea, in Vanylvsfjorden and in Moldefjorden. This will be carried out to ensure the delivery of water to the construction areas for the upcoming turnkey contract for the construction of Stad ship tunnel and to permanent water suppl...
Pipeline Construction
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- KYSTVERKET
- Published:
- July 01, 2026
- Deadline:
- September 03, 2026
- Topic:
- Pipeline Construction
- Object:
- Trinkwasserleitung / Versorgungsnetz
Object classification
- Trinkwasserleitung / VersorgungsnetzPrimary
Tender description
The Norwegian Coastal Administration shall execute a contract for the establishment of water pipelines in the sea, in Vanylvsfjorden and in Moldefjorden. This will be carried out to ensure the delivery of water to the construction areas for the upcoming turnkey contract for the construction of Stad ship tunnel and to permanent water supply to Stad and Vanylven municipalities after the completion of Stad Skipstunnel.The project is a cooperation between the Norwegian Coastal Administration and the municipalities Stad and Vanylven.Questions on whether the competition will not be answered in weeks 28 - empty. 31 due to holiday development.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock6 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock4 details capturedPerformance locations
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10Contract - 420768 Fossumdalen stage 5-6, Pipeline route.
Trondheim kommuneTRONDHEIM"Fossumdalen stage 5-6 - Ledningstrasé" is part of a larger water and sewage project in Trondheim municipality that has run, and shall run, over several stages. The aim is to reduce the amount of overflow supplied to The River Nidelva from the sewage network by establishing a separated main stem for W&S from the sewage zone Lerkendal where surface water is led to the River Nidelva, and waste water is fed by a self-fall to Høvringen treatment facility. In "Fossumdalen stage 5-6, Ledningstrasé", the existing overflow (OP04) shall be established in "Fossumdalen stage 4" connects to the Høvringen sewage tunnel via a diving pipeline under the River Nidelva with a flushing magazine. The pipeline installation starts with drilling rock from the west side of Osloveien south of Stavne to Høvringen sewage tunnel. Under osloveien, a sewage pipeline is laid through a completed freighter and dug a ditch to the east between the properties in Sivert Dahlens veg. Pipelines that controlled drilling will be executed under the River Nidelva to Valøya. Over Valøya and up to Valøyslyngen, pipelines are to be dug in a ditch. Pipelines in valøyslyngen shall be executed in an increased dimension, which together with the existing volume in the existing sewage pipeline upstream OP04 (new overflow) functions as flushing magnet for the diving line. The flushing magazine shall be emptied via a flush manhole and the facility shall be adapted for the supply of water from the municipality ́s water pipelines. A new water and sewage system shall also be constructed from OP04 (a new overflow) to the junction of Alfred Larsens gate and Valøyslyngen. From the junction of Alfred Larsens gate and valøyslyngen, a new water pipeline will be laid in the same route as the existing water pipeline to Holtermanns road. The following turnkey contracts will be transported to the general contractor:1 "Fossumdalen stage 5-6 - Sewage pump station" (the existing sewage pump station APS is replaced by a smaller and more modern sewage pump station APS04.2 "Fossumdalen section 5-6, HVAC, management and automation"The general contractor will take over, among other things, the engineering design and coordination responsibility for these two turnkey contracts. As part of "Fossumdalen stage 5-6, Ledningstrasé", a sheet box shall be prepared for a sheet box for setting down the new APS04, and the existing Water and Sewage will be connected to the new APS04.Maintenance contract, tunnels in the north
Statens vegvesenMossDeadline: Aug 17The contract work includes maintenance work on national road tunnels in the North, Nordland, Troms and Finnmark counties. The extent of the work is mainly the closure of the recommended measures after the main geological inspection. The measures will mainly include; Rock protection in the form of rock and rock clearing, pigging and securing with shotcrete, as well as mounting bolts, handling any saws. Demolition of old water/frost protection (PE foam) with associated fastening material. Establishment of new water/frost protection and fire protection.Contract procurement - UDK56 - Flood road Sundland east NO-DIG
Bane NOR SFHAMARDeadline: Aug 03Micro tunnelling, controlled drilling and pilot pipe drilling for a new flood path with surface water culvert and municipal waste water pipelines at Sundland, to ensure handling of surface water to Drammenselva. Bane NOR and Drammen municipalities share builder responsibility.Sea pipeline Melkevika - Havikbotnen
Kinn kommuneMåløyDeadline: Sep 21Kinn municipality shall establish a new water pipeline (submarine pipeline) between Melkevika and Havikbotnen. For a complete description of the assignment, see the contract documentation (Part II) and annexes.1000864 General Contract For Gravsbekken Stage 2
Bærum kommuneSANDVIKADeadline: Aug 21The project Gravsbekken stage 2 includes upgrading and separation of the pipeline network in the upper part of the catchment area of Gravsbekken in Bærum municipality. In the current situation, wastewater and surface water are transported in a joint pipeline in the previous bekkeleie, which mostly functions as a property border between private properties. The background for the project is the need to separate the pipeline network in order to reduce the supply of foreign water to the municipal sewage system and onwards to VEAS. The measure shall also contribute to reducing the risk of basement flooding as a result of capacity challenges in the downstream pipeline network. The contract work includes the establishment of a separate system for wastewater and surface water in the upper part of the catchment area for Gravsbekken, upstream of the contract border to Gravsbekken stage 1. including the establishment of a joint ditch for several types of pipelines, where appropriate Connection to the existing pipeline network and the necessary adaptations to the completed installations in Gravsbekken stage 1Re-establishment of affected areas, including private garden areas. W-drawings showing an overview of the site belt for the entire project are attached as part of annex V02. Detailed W-drawings for each property will be submitted after the contract has been signed. Site inspection: Nadderudveien 25BDate and date: 29.06.2026, 12.00 Registration by 26.06.2026, with the number of participants.Construction of the Interconnected Gas Pipeline Macedonia-Serbia (FIDIC Contract - turnkey)
Joint Stock Company for performing energy activity natural gas transmission NOMAGAS Skopje in state ownershipSkopjeDeadline: Jul 13Construction of the Interconnected Gas Pipeline Macedonia-Serbia (FIDIC Contract - turnkey)Hammeren intake station - Rock and construction contract
Nedre Romerike vann- og avløpsselskap IKSSTRØMMENDeadline: Sep 01NRVA shall upgrade the raw water pump station at Glomma for water supply to Nedre Romerike. The project includes a new rock hall that shall house a new high voltage electrical system for pumping operation. The present contract includes rock works, ground works, concrete works and external water and sewage installations.Contract award - 260737 Vollabakken road and water and sewage.
Trondheim kommuneTRONDHEIMTrondheim municipality, hereafter called the contracting authority, invites tenderers to an open competition for a contract in the project Contract Vollabakken Road and Water and Sewage. The municipality would like tenders from tenderers with the professional, technical and economic basis necessary for fulfilment of the contract. The competition will be carried out via the municipality ́s tender implementation tool Mercell. All communication and tender submissions will be via Mercell.WSC/T/044/2026 - WORKS – CONSOLIDATION OF POTABLE INFRASTRUCTURE BETWEEN CIRKEWWA REVERSE OSMOSIS AND TA’ QALI RESERVOIR IN AN ENVIRONMENTALLY FRIENDLY MANNER BY THE WATER SERVICES CORPORATION – WIED MUSA
Water Services CorporationLuqaDeadline: Aug 11The subject of this tender is the laying of pipes by open cut trenches as per tender documents and bill of quantities to cater for the continuous increase in demand of potable water in the Northern and Central regions of Malta inclusive, but not exclusive, of: Cirkewwa - Qali specifically Wied Musa – Open Cut Trenches o Potable Water Works -Installation ONLY of potable water ductile iron mains 150mm, 350mm and 600mm. o Open Cut Trenches All ductile iron mains and fittings, all polyethylene pipes and fittings and manhole covers and surface boxes are to be supplied by the Water Services Corporation.WSC/T/006/2026 - WORKS – CONSOLIDATION OF POTABLE INFRASTRUCTURE BETWEEN CIRKEWWA REVERSE OSMOSIS AND TA’ QALI RESERVOIR IN AN ENVIRONMENTALLY FRIENDLY MANNER BY THE WATER SERVICES CORPORATION – PHASE 1 - TRIQ L–MGARR, MGARR
Water Services CorporationLuqaThe subject of this tender is the laying of pipes by open cut trenches as per tender documents and bill of quantities to cater for the continuous increase in demand of potable water in the Northern and Central regions of Malta inclusive, but not exclusive, of: Cirkewwa - Qali which includes from Triq San Pawl tal- Qliegha, Mosta to Triq Sir Temi Zammit, Mgarr – Open Cut Trenches o Potable Water Works Installation of potable water ductile iron mains 80mm, 100mm, 150mm and 600mm exclusive of the supply of pipes and fittings. o Wastewater Works Installation of wastewater ductile iron rising main 200mm and 300mm exclusive of the supply of pipes and fittings. All ductile iron mains and fittings, all polyethylene pipes and fittings and manhole covers and surface boxes are to be supplied by the Water Services Corporation.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 03. September 2026.
- Who is the contracting authority?
- The contracting authority is KYSTVERKET.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.