The High Court of IrelandDublinTED
Stage 1 Beschaffung für einen Energiehandelspartner
Stage 1 of Procurement for the provision of an Energy Trading Partner
Energy Supply
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- The High Court of Ireland
- Published:
- August 17, 2026
- Deadline:
- September 17, 2026
- Topic:
- Energy Supply
Tender description
Stage 1 of Procurement for the provision of an Energy Trading Partner
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock6 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
10Phase 1 Beschaffung für einen Energiehandelspartner
EirGrid plcDeadline: Aug 18Stage 1 of Procurement for the provision of an Energy Trading PartnerDeep Energy Retrofit 2 Stage 0 Energy Audit
Health Service Executive (HSE)KildareDeadline: Sep 11This Tender Briefing Document sets out the requirements for the procurement of specialist energy consulting services to undertake comprehensive “Stage 0” energy audits and decarbonisation assessments across 30 Significant Energy User (SEU) healthcare facilities throughout Ireland. The programme forms part of the health sector’s broader energy efficiency and decarbonisation strategy and is intended to support compliance with national and European energy and climate obligations, including the Energy Efficiency Directive (EED), Energy Performance of Buildings Directive (EPBD), Climate Action Plan targets, and public sector energy efficiency obligations. These Stage 0 audits form part of a wider Deep Energy Retrofit 2.0 programme. The intention is that all 30 sites will undergo a deep energy retrofit and the audits will help design teams hit the ground running at Stage 1 as well as identify quick wins through no cost/minor capital projects and identify information gaps e.g. metering gaps that will inform future decarbonisation design so that designs are based on real-world data.DIO - Stage engineering assistance
Arendal kommuneGrimstadDeadline: Nov 01The DIO shall cover all needs related to technical stage assistance, but the primary event will be Arendalsuka. Arendal municipality will be able to use this agreement for other events where there is a need for technical assistance. The scope concerns technical assistance for production of stage content and lectures during Arendalsuka, among other things. This includes technical coordination, technical equipment and technical manpower. Arendalsuka's own stages are largely hired out to different actors, so the offered technical personnel must also be able to function as a good representative of Arendalsuka. Concerns a high degree of service, stretches longer than just its discipline, and takes one overall responsibility for seamless liquidation. This contract involves sound, lighting and stage, and in some cases also AV technical systems. Contact [email protected] if you need technical stage assistance.Mitigation of instream barriers in Waters of LIFE Catchments - Stage 1
Department of Housing Local Government and HeritageWexfordDeadline: Aug 19The EU co funded Waters of LIFE Project seeks to mitigate the impact of three (3) instream barriers that have been assigned the highest overall ranking for impact within the project's demonstration catchments. Two of the barriers are located in the Shournagh Demonstration Catchment in Co. Cork and one in the Graney Demonstration Catchment in Co. Clare. This CFT is for stage 1 of the process, which involves the design, planning and statutory approval process.CFT for Architect Led Integrated Design Team Services for the Redevelopment of the Crawford Art Gallery and surrounding Public Realm for CWMF Stage 4 (Construction) and Stage 5 (Handover)
Office of Public Works (OPW)TrimCFT for Architect Led Integrated Design Team Services for the Redevelopment of the Crawford Art Gallery and surrounding Public Realm for CWMF Stage 4 (Construction) and Stage 5 (Handover)Skeisvang Sixth Form College. Renovation and new construction - E913 Stage, sound, lighting and picture.
Rogaland fylkeskommuneStavangerNew premises for music, dance and drama shall be established for the new building and renovation of Skeisvang Sixth Form College. In this procurement, technical stage installations shall be delivered (technical stage rigging, stage textiles, acoustic blankets etc.) and sound, lighting and picture (logistics, loudspeakers, sound mixers, various loose equipment, projectors, floodlights, light mixers, smoke machine, amplifiers, etc.)Tjøme municipality , stage 3
Færder kommuneNØTTERØYDeadline: Oct 07Background and purpose Færder municipality plans to separate the old AF system to waste water and surface water as well as lay new water pipelines in the centre of Tjøme, stage 3. The work will include excavation work, rock drilling and renovation of the hose. The contract work is divided into two phases; an interaction phase first and then the execution phase. This contract includes all works with new water and sewage installations as shown on the attached drawings, as well as the re-establishment of affected roads. There shall be continual operation of the existing pipeline installations all days throughout the entire construction period. The pipeline route and manhole placement are in the plans that have been prepared. It is anticipated that the ditches will consist of both uncompacted trenches and rock trenches. The trench depth varies from 2.0 to 3.0 metres, with specific locations up to 5.5 metres. The works mainly comprise: approx. 2,170 m complete main trenches of varying width and height. delivery/laying of approx. 1,730 m surface water pipelines delivery/laying of approx. 1,750 m sewage sewage delivery/laying of approx. 2,170 m water pipelines salvage drilling for surface water of approx. 95 m renovating the hose of approx. 480 m 28 complete wastewater manholes 27 complete surface water manholes 23 complete water manholes re-establishment of roads facilitating space for temporary stores. The work will be carried out as a general contract/main contract. Building form 8405 A "Form for contract for the execution of building and construction work" shall be used.Begby school - Partnering contract - Stage 1: Prequalification
Fredrikstad kommuneFREDRIKSTADDeadline: Sep 04Fredrikstad municipality invites tenderers to a restricted tender contest for a partnering contract for the establishment of Begby school with a sports hall. The contract will be awarded in accordance with the procedure: negotiated procedure after a prior notice. The tender contest starts with a qualification phase. Only tenderers who fulfil the qualification requirements and will be selected in accordance with the selection criteria will be invited to submit a tender. The assignment will be carried out in two phases, of which phase 1 will be carried out as a consultant assignment based on NS 8401, then Phase 2 will be carried out as a contract based on NS 8407. The remuneration model for phase 2 is determined during phase 1 and may consist of one fixed price, or a combined model with elements of fixed price/unit prices/calculation work, or a target price with an incentive scheme. A comprehensive description of the delivery is in the annexes to the tender documentation.Dublin City Council Contract for Santry River Restoration and Greenway Project Site Investigations Stage 1 Howth Road to the Coast
Dublin City CouncilDublinDublin City Council intends to award a contract for the Santry River Restoration and Greenway Project Site Investigations Stage 1, Howth Road to the Coast. The purpose of the site investigation is to provide suitable geotechnical and geo-environmental data for the design of the proposed works, and to confirm locations of existing buried services. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID xxxxxxx – Input when notice created . Please note that this project is subject to funding.UCC Kane Science Building Redevelopment - Construction Consultancy Team - Prequalification Stage
University College CorkCorkThis tender is to appoint an Architect led Construction Consultancy Team for UCC Kane Science Building Redevelopment . This stage involves the shortlisting of Candidates on the basis of the selection criteria set out in this document. The intention is that a maximum of Six Candidates will be shortlisted and invited to the Tender Stage of the competition. The successful tenderer will be required to provide the full range of consultancy services for the delivery of the Contract including but not limited to the following a) Architectural Services (including DAC, Planning and Landscaping Design Services), b) Civil,Structural Engineering Services (including Transport, Mobility, Environmental and Façade Engineering Services)c) Fire Engineering Services d) Mechanical and Electrical Engineering Services (Including BREEAM, Sustainability Specialist and Process Engineering), e)Project Supervisor Design Process (PSDP), f)Employers Representative (Dedicated Role) g)Information Manager. Note Quantity Surveying Services will be by separate appointment by UCC . The existing Kane Science Building is a multi storey building consisting of 5 floors above ground, including plant area and 1 basement level below ground. The total floor area of the building is circa 14,150 sq m.The Kane Science Building, located centrally on the main campus of University College Cork (UCC), has been the heart of Science, Technology, Engineering and Mathematics (STEM) in Cork since 1971. The Kane Science Building opened in 1971 and, despite some localised refurbishment over the last 50 years, is in need of urgent and significant investment in its fabric and core infrastructure.The refurbishment of the Kane Science Building is identified as a key priority in the University’s Strategic Plan 2023 to 2028 Securing our Future.The primary purpose for the Kane Science Building Refurbishment is to reduce the energy consumed and emissions by the current building and services, to repurpose areas, to upgrade selected
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 17. September 2026.
- Who is the contracting authority?
- The contracting authority is The High Court of Ireland.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.