New: market reports on German public procurement Read the report

University College CorkCorkTED

UCC Kane Science Building Redevelopment - Construction Consultancy Team - Prequalification Stage

This tender is to appoint an Architect led Construction Consultancy Team for UCC Kane Science Building Redevelopment . This stage involves the shortlisting of Candidates on the basis of the selection criteria set out in this document. The intention is that a maximum of Six Candidates will be shortlisted and invited to the Tender Stage of ...

Type: Tender
Unlock documents for free

No credit card · Instant access

Content at a glance

Tender type:
Tender
Contracting authority:
University College Cork
Published:
August 30, 2026
Deadline:
Not specified

Tender description

Show full description

This tender is to appoint an Architect led Construction Consultancy Team for UCC Kane Science Building Redevelopment . This stage involves the shortlisting of Candidates on the basis of the selection criteria set out in this document. The intention is that a maximum of Six Candidates will be shortlisted and invited to the Tender Stage of the competition. The successful tenderer will be required to provide the full range of consultancy services for the delivery of the Contract including but not limited to the following a) Architectural Services (including DAC, Planning and Landscaping Design Services), b) Civil,Structural Engineering Services (including Transport, Mobility, Environmental and Façade Engineering Services)c) Fire Engineering Services d) Mechanical and Electrical Engineering Services (Including BREEAM, Sustainability Specialist and Process Engineering), e)Project Supervisor Design Process (PSDP), f)Employers Representative (Dedicated Role) g)Information Manager. Note Quantity Surveying Services will be by separate appointment by UCC . The existing Kane Science Building is a multi storey building consisting of 5 floors above ground, including plant area and 1 basement level below ground. The total floor area of the building is circa 14,150 sq m.The Kane Science Building, located centrally on the main campus of University College Cork (UCC), has been the heart of Science, Technology, Engineering and Mathematics (STEM) in Cork since 1971. The Kane Science Building opened in 1971 and, despite some localised refurbishment over the last 50 years, is in need of urgent and significant investment in its fabric and core infrastructure.The refurbishment of the Kane Science Building is identified as a key priority in the University’s Strategic Plan 2023 to 2028 Securing our Future.The primary purpose for the Kane Science Building Refurbishment is to reduce the energy consumed and emissions by the current building and services, to repurpose areas, to upgrade selected

Further details

With free access, documents, deadlines and submission notes are available in a structured format.

  • Core requirements of the tender prioritized and prepared
  • Deadlines, eligibility criteria and documents in one workflow
  • Guidance for structured bid preparation
  • Automatically discover matching follow-up tenders
Unlock 30 days free

30 days free · no credit card · cancel anytime

All procurement details

Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.

7 data areas available

Unlock 30 days free

30 days free · no credit card · cancel anytime

Related tenders

10

Frequently asked questions about this tender

How can I apply for this tender?
Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
What is the submission deadline?
No specific submission deadline is currently stated for this notice.
Who is the contracting authority?
The contracting authority is University College Cork.
Which documents are needed to get started?
Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.
1,200+ companies10,000+ active tendersGDPR-compliant platform

Discover more tenders

Next step

Get full access to this tender

Access all documents for "UCC Kane Science Building Redevelopment - Construction Consultancy Team - Prequalification Stage" from University College Cork and keep track of deadlines and submission guidelines.

Never miss a deadlineNo credit card required