Office of Public Works (OPW)TrimTED
CFT for Architect Led Integrated Design Team Services for the Redevelopment of the Crawford Art Gallery and surrounding Public Realm for CWMF Stage 4 (Construction) and Stage 5 (Handover)
CFT for Architect Led Integrated Design Team Services for the Redevelopment of the Crawford Art Gallery and surrounding Public Realm for CWMF Stage 4 (Construction) and Stage 5 (Handover)
Architecture, Construction Supervision, BIM
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Office of Public Works (OPW)
- Published:
- August 16, 2026
- Deadline:
- Not specified
- Topic:
- Architecture
Tender description
CFT for Architect Led Integrated Design Team Services for the Redevelopment of the Crawford Art Gallery and surrounding Public Realm for CWMF Stage 4 (Construction) and Stage 5 (Handover)
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock2 details capturedBidders and contractors · Address
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10Meath Co Co - MH-RREG-26-02 - Multi-Party Framework for Architect-Led Multidisciplinary and Integrated Design Team Services for schemes that come under the directorate of Rural Regeneration
Meath County CouncilNavanEstablishment of a Multi-Party Framework for Architect-Led Multidisciplinary and Integrated Design Team Services for schemes that come under the directorate of Rural Regeneration. Initial Contract is: Multidisciplinary Architect-Led Project Team Services For Kenlis Place Theatre and Public RealmProject Management led Integrated Multi-Disciplinary Design Team Consultancy Services for Road Infrastructure and associated services at IDA Ballina
IDA IrelandDublinThe Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services should consist of suitably qualified and experienced resources including a Project Manager, Civil and Road Engineers, Quantity Surveyor, PSDP, Planner, Landscape Architect and any specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The team will be required for all 5 stages of the project, Initial Design, Detailed Design and Planning, Procurement of a Suitable Works Contractor, Construction and Handover.Tipperary County Council - PROCUREMENT OF ARCHITECT LED MULTI-DISCIPLINARY CONSULTANCY SERVICE
Tipperary County CouncilClonmel, NenaghProcurement Of Architect Led Multi-Disciplinary Consultancy Service Conservation And Refurbishment Of The Old Guard House In Kickham Barracks, Clonmel Tipperary County Council wish to appoint a multi-disciplinary design team to develop the design and execution of the conservation, refurbishment and adaptive re-use of building B an old Guardhouse with a proposed re-use as a Café. The successful consultant will be required to complete the following project phases as outlined in Capital Works Management Framework (CWMF): • CWMF Stage ii : Detailed Design • CWMF Stage iii : Tender Process • CWMF Stage iv : Construction • CWMF Stage v : Handover The services are required for the following protected building: Guard house - Proposed CafeMulti-Supplier Framework Agreement for Architect Led Design Team Services for the Provision of Design Build Social and Affordable Residential Developments
Roscommon County Council_424RoscommonCounty Wide Design Build Housing Delivery Multi-Supplier Framework Agreement for Architect Led Design Team Services for the Provision of Design Build Social and Affordable Residential Developments -including associated buildings such as community facilities - PCE111F For Stages i to Stage vMulti-Party Framework for Architect and Engineer Led Integrated Design Teams in 2 Lots
Údarás Na Gaeltachta_289GalwayEstablishment of Multiparty Frameworks for Integrated Design Team (IDT) Services for Údarás na Gaeltachta in the following Lots: - Lot 1: Architect Led IDT for Counties Kerry, Cork and Waterford - Lot 2: Engineer (Civil and Structural) Led IDT for Counties Kerry, Cork and Waterford Tender candidates will be required to form a team of consultants for the provision of Architect Led IDT and Engineer Led IDT Services. Each framework agreement will be established with up to 5 economic operators. IDTs generally comprise of the following disciplines: - Architectural Services (lead for Architect Led IDT Services) and associated specialist skills, - Civil and Structural Engineering Services (lead for Engineering Led IDT Services) and associated specialist skills, - Building Services (Mechanical and Electrical) Engineering Services and - Quantity Surveying Services. The extent of other consultancy services and specialist skills service providers required for call-off commissions throughout the course of a Framework may vary depending on the range of services required. Call-off commissions may typically range from extension, refurbishment, repair, upgrade, new build, infrastructure and other type projects as required by the Contracting Authority within Gaeltacht regions. Scope of design services may extend from initial feasibility, through statutory approvals, full design to implementation and handover/close-out, and other technical services as may be required over the framework term. Each framework will be established for a period of three (3) years with the option to extend by one further year. Please refer to the enclosed documents for further particulars and requirements. A Prior Information Notice (PIN) was issued in respect of the above, reference: OJ S 94/2024 15/05/2024.Establishment of a Single Party Framework for a Single Point Design Team for Nicholas Street Public Realm Project
Limerick City and County Council_103432Limerick.Deadline: Aug 14Nicholas Street forms part of the historic core of Limerick City and is located within an area of archaeological, architectural and cultural heritage significance. The Nicholas Street Public Realm Project seeks to improve the quality, accessibility, functionality and appearance of the public realm while respecting and enhancing the area's historic character. The preliminary design and Part 8 Planning process for the project has been completed. Limerick City and County Council are now seeking tenders for the establishment of a Single Point Design Team to progress the approved scheme initially through detailed design and tender procurement with potential to include the services for the construction, handover and close-out phases.Architect-Led Integrated Design Team for the redevelopment of Ballintober Holiday Lodge and Community Cafe and Termonbarry Creative Community and Tourism Hub
Roscommon County Council_424RoscommonTo design and oversee the redevelopment of two vacant/derelict buildings (former Garda Stations). The services provided shall include consultation and engagement, investigations, design of buildings and urban landscape, assigned certifier role, PSDP role, delivery through statutory planning processes, detailed design, cost planning, procurement, project management and certification of all required works. The commissioned services shall also include for provisions, coordination and management of all required consultancy services and specialist skills (Stages (ii), (iii), (iv) and (v)), namely Building, Urban Design and Landscape Architect; Civil, Structural, M and E, Building Services Engineering team, Fire Safety Consultant, Quantity Surveyor; Planning, Environmental Assessment, Archaeological, Architectural Heritage Impact Assessment ReportTEN2600112 - cFT for Integrated Design Team for the Development of the Bailieborough Town Centre Regeneration Scheme (Stages (i) to (ii) for Cavan County Council
Cavan County CouncilCavanDeadline: Jul 22TEN2600112 - cFT for Integrated Design Team for the Development of the Bailieborough Town Centre Regeneration Scheme (Stages (i) to (ii) for Cavan County Council. Plese refer to Tender Documents for further details.Civil Engineering led Integrated Design Team for Mayo Community Sports Campus
Mayo County Council_1127CastlebarTender for the appointment of a Civil Engineering led Integrated Design Team for the provision of Design, Procurement and Project Management Services for Mayo Community Sports Campus.FCC/120/19 Multiparty framework for Architect led Integrated Conservation Design Team Services with initial projects
Fingal County Council_371DublinEstablish a multiparty framework for Architect led Integrated Conservation Design Team Services related to heritage buildings, monuments, buildings, structures and landscapes including public buildings within the County. The initial commission will be for condition reporting, feasibility, design, planning and management of heritage related works at three sites; 1)Bremore Castle, 2)Skerries Mills 3) The Seamus Ennis Arts Centre The Multi Party Framework will be made available for use by Dun Laoghaire Rathdown County Council, South Dublin County Council, Dublin City Council and Wicklow County Council also.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Office of Public Works (OPW).
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.