Health Service Executive (HSE)KildareTED
Multi-Supplier Framework Agreement for Minor Building Works Projects in the HSE Dublin North/North City Region (Lot 1: Works up to €250,000 and Lot 2: Works between €250,000 and €1,000,000)
The HSE proposes to establish a multi-supplier framework agreement for the provision of general building and construction works across the Dublin North and North City Region. The Framework Agreement is divided into two Lots: • Lot 1: Works projects up to €250,000; and • Lot 2: Works projects over €250,000 and up to €1,000,000. For the avo...
Heating & Air Conditioning, Electrical Installation, Fire Protection, Shell Construction, Non-Residential Building
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Health Service Executive (HSE)
- Published:
- August 24, 2026
- Deadline:
- September 29, 2026
- Topic:
- Heating & Air Conditioning
- Object:
- Krankenhaus / Klinik
Object classification
- Krankenhaus / KlinikPrimary
Tender description
Show full descriptionCollapse description
The HSE proposes to establish a multi-supplier framework agreement for the provision of general building and construction works across the Dublin North and North City Region. The Framework Agreement is divided into two Lots: • Lot 1: Works projects up to €250,000; and • Lot 2: Works projects over €250,000 and up to €1,000,000. For the avoidance of doubt, all Lot value bands, project values, annual framework values and turnover requirements referred to in the procurement documentation are exclusive of VAT unless expressly stated otherwise. The Framework Agreement will support the delivery of construction, refurbishment, adaptation, compliance, maintenance, lifecycle replacement, energy upgrade, decarbonisation and improvement works, and minor capital projects across HSE-owned, leased and occupied properties, including Primary Care Centres, Community Healthcare facilities, Section 38 and Section 39 funded healthcare organisations, acute hospital campuses and other HSE affiliated organisations, as required. Subject to the receipt of a sufficient number of suitable applications, a minimum of fifteen (15) Applicants per Lot will be shortlisted to Stage 2 and up to fifteen (15) contractors per Lot may be appointed to the Framework Agreement. The procurement is being conducted using the Restricted Procedure. Applicants who satisfy the minimum suitability requirements and achieve the highest scores under the Stage 1 suitability assessment process will be shortlisted and invited to participate in Stage 2 of the competition.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock2 details capturedLots LOT-0001 · Lots LOT-0002
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
8Multi-Party Framework Agreement for HSE DTS Framework 2024 – FW02: Acute Healthcare Capital Works – project value €1M - €15M excl. VAT for RHA B Dublin and Midlands, IHA1 and IHA 2
Health Service Executive (HSE)KildareMULTI-PARTY FRAMEWORK AGREEMENT FOR HSE DESIGN TEAM SERVICES FRAMEWORK 2024 – FRAMEWORK 02: ACUTE HEALTHCARE CAPITAL WORKS – PROJECT VALUE €1M - €15M EXCL. VAT. This framework will include the following design team disciplines (Lots): Lot 1: Architect (AR) as Principal Service Provider with the following Specialists domestic subconsultants, or in-house specialisms: a. Planner (PL), b. Project Supervisor Design Process (PSDP), c. Fire Safety Consultant (FSC) and d. BIM Information Manager (BIM). Lot 2: Quantity Surveyor (QS), as Principal Service Provider. Lot 3: Building Services Engineer (M+E), as Principal Service Provider. Lot 4: Civil / Structural Engineer (C+S), as Principal Service Provider. Lot 5: Employer’s Representative (ER),as Principal Service Provider. Lot 6: Energy Efficient Design Facilitator (EEDF), as Principal Service Provider. Lot 7: Assigned Certifier (AC), as Principal Service Provider. The Health Services Executive (HSE) invites expressions of interest, under the Restricted Procedure, from suitably qualified services providers for the provision of design team services (including Specialist Skills Providers) per the above Lot listing for which it is proposed to establish a Multi-Party Framework Agreement for each Lot type to award call-off contracts for Acute Healthcare Capital Works – project value €1M - €15M excl. VAT within RHA B Dublin and Midlands, IHA1 and IHA 2 for HSE Capital and Estates Office, Bridge House, Cherry Orchard Hospital. Please note that the INITIAL project forming Framework 02 for this regional / subregional office will be: Reconfiguration of the Emergency Department (ED) at St. James’s Hospital. Please see SAQ document pack for detailsMulti Party Framework Agreement (2026-2030) for the Design and Execution of works in connection with the installation of Playgrounds for Dublin City Council
Dublin City CouncilDublinDeadline: Sep 23Dublin City Council intends to establish a Multi-Party Framework Agreement 2026-2030 for the design and execution of works in connection with the installation of playgrounds for Local Authorities. The requirements include playground design, and execution of works in connection with the supply and installation of playground equipment, landscaping works including safety surfacing and ancillary works, the supply of labour, plant and material. Additional items such as and not limited to would include the provision of gym and exercise equipment, teen zones, MUGA’s, skate and BMX areas, pumptracks etc The Framework will include a provision for the delivery and installation of the equipment to the nominated sites in the City and will be responsible for the security until installed and formally ‘taken in charge’ by Parks, Biodiversity and Landscape Services, Dublin City Council and any other Local Authorities as appropriate. Please refer to the tender documents for more details For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 8831439 – Please note that this project is subject to funding.Multi-Party Framework for Building Contractors (Housing) for Emergency Response Maintenance Works up to the value of €7,500 ex Vat. to Limerick City and County Council Housing Stock. 2026
Limerick City and County Council_103432Limerick.The work involves modest repairs in all areas, i.e. roof repair work and restoring the existing housing stock back to its original state, leaving the area safe and tidy for the existing tenants. Building Works will require the use of all building trades to varying extents depending upon the task in hand. Specific examples would be bathroom damage due to leak, repair of damaged building fabric on a like-for-like basis (eg replacement of ceilings or reinstate suspended floors), blocking up of fireplaces, sealing flue above ceiling level, removal of backboilers and making good etc. External work such as footpath repair, ramp installation, roof repair, chimney repairs/removal, renewal of rainwater goods, boundary walls etc. The units will for the most part will be occupied. All framework participants will have to be able to adequately discharge the duties of PSCS and Contractor in line with Safety, Health and Welfare at Work (Construction) Regulations 2013 and Health, Safety and Welfare at Work Act 2005. Participants are reminded of an Employers obligation (contractors) to provide a safe place of work and how they can demonstrate same. LCCC will seek specifics as to how a contractor manages Health and Safety in general and how they can demonstrate their ability to undertake the PSCS role. All framework participants must be capable of accepting and undertaking the duties associated with PSCS and Contractor. Not all contracts will require a PSCS appointment.RFT 02/26/GM - Works Contractor and PSCS for ATU Dublin Road EEDPP2 Energy Retrofit at Atlantic Technological University at the Galway City Campus
Atlantic Technological UniversityLetterkennyDeadline: Sep 21Atlantic Technological University (ATU) is seeking suitably qualified and experienced contractors to undertake an energy retrofit project at its Galway City Dublin Road Campus. The project comprises the retrofit of approximately 4,425m² of the original 1972 building and forms part of the Higher Education Authority (HEA) and Sustainable Energy Authority of Ireland (SEAI) funded Energy Efficiency and Decarbonisation Pathfinder Project (EEDPP2). The works include building fabric upgrades, roof and window replacement, ventilation improvements, lighting and controls upgrades, and the installation of a medium-temperature air-source heat pump, with existing gas boilers retained for peak demand and backup. The project aims to improve energy efficiency, reduce carbon emissions, extend the building's operational life, enhance occupant comfort, increase the use of renewable technologies, and achieve a minimum B1 BER rating. The existing building is a reinforced concrete framed structure currently served by the campus central heating system and a combination of natural and mechanical ventilation systems.Plumbing for Fredrikstad municipality and Hvaler municipality.
Fredrikstad kommuneFREDRIKSTADDeadline: Sep 01Fredrikstad municipality and Hvaler municipality invite tenderers to a competition for the establishment of parallel framework agreements for 2 years, with an option for an extension for 1+1 year for the purchase of tradesman services within plumbing work.Dublin City Council - Contract for Dodder Greenway Milltown Road - Dodder Walk to Dundrum Road Active Travel Scheme
Dublin City CouncilDublinDeadline: Aug 27Dublin City Council aims to enhance the quality of life for its residents by developing an integrated Active Travel Network. This comprehensive network is designed to foster connections among individuals via pedestrian pathways, segregated cycle provision, and other environmentally friendly transportation alternatives. The enhancement of accessibility and interconnectivity for people walking, wheeling and cycling within this network is anticipated to play a pivotal role in mitigating carbon emissions originating from transport activities. The council’s objective is to augment the existing 40km network into a seamlessly connected 314km network spanning the entire city. The Dodder Greenway Milltown Road - Dodder walk to Dundrum Road Active Travel Scheme is one of the projects identified under this initiative. The Dodder Greenway Milltown Road - Dodder walk to Dundrum Road Active Travel Scheme extends along Milltown Road between Dodder walk and Dundrum Road for a length of 1.2km. The Scheme includes the provision of segregated cycle facilities, improved pedestrian facilities (footpath and junction upgrades), ducting, resurfacing etc. the scheme also includes the upgrade of two signal-controlled junctions to improve pedestrian and cyclist facilities, the two junctions are: Milltown Rd and Churchtown Rd junction and Milltown Rd and Dundrum Rd junction. The Scheme comprises: - Re-configuration of existing carriageway for inclusion of cycle provision - Site Clearance - Pavement works - Kerbs and Footways - Traffic Islands - Public lighting - Traffic signs and road markings - Drainage works - Traffic signals and Ducting - Utilities upgrades - Landscaping and Urban Realm Works - Bus Shelters (foundation only) - Bike Stands - Temporary Traffic Management Please note that this project is subject to funding. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 8702210Errichtung einer Photovoltaik-Dachanlage mit Energiespeichersystem Rathaus
Gemeinde WaldfeuchtWaldfeuchtHauptmassen: Installation einer PV-Anlage auf dem Dach des Rathauses mit Speicher PV Leistung 11,61 kWp Speicher 14,00 kWhSanierung Lehrschwimmbecken Ludwig-Povel-Schule - Rohbau- und Abbrucharbeiten
Stadt NordhornNordhornDeadline: Aug 24Folgende Leistungen sind im Leistungsverzeichnis enthalten: - Baustelleneinrichtung - Rückbauarbeiten (inkl. Schadstoffrückbau) - Abbrucharbeiten TGA - Rohbauarbeiten - Estricharbeiten - Innenputzarbeiten
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 29. September 2026.
- Who is the contracting authority?
- The contracting authority is Health Service Executive (HSE).
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.