Health Service Executive (HSE)KildareTED
Multi- Party Framework Agreement for HSE West Project Supervisor Design Process Services - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West
Framework Agreement für PSDP-Dienstleistungen HSE West (Projektwert €15M-€60M exkl. MwSt) für nicht-akute Gesundheitskapitalarbeiten in Galway, Mayo und Roscommon. Das Projekt umfasst den Bau einer neuen 75-Bett-Gemeindekrankenstation (CNU) mit 3 Etagen (25 Einzelzimmer nach HIQA-Standards) im Ballina District Hospital Campus sowie Umgest...
Architecture, MEP Engineering, Construction Supervision, Health & Safety Coordination (SiGeKo)
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Health Service Executive (HSE)
- Published:
- July 12, 2026
- Deadline:
- Not specified
- Topic:
- Architecture
Tender description
Framework Agreement für PSDP-Dienstleistungen HSE West (Projektwert €15M-€60M exkl. MwSt) für nicht-akute Gesundheitskapitalarbeiten in Galway, Mayo und Roscommon. Das Projekt umfasst den Bau einer neuen 75-Bett-Gemeindekrankenstation (CNU) mit 3 Etagen (25 Einzelzimmer nach HIQA-Standards) im Ballina District Hospital Campus sowie Umgestaltungen der bestehenden Abteilung. Arbeiten umfassen Abriss, Errichtung der CNU, Renovierung der bestehenden Abteilung inklusive Physiotherapiebereich und
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10Multi- Party Framework Agreement for HSE West Energy Efficient Design Services - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West
Health Service Executive (HSE)KildareRahmenvereinbarung für Planungsleistungen zur Energieeffizienz im HSE West, Los 05: Nicht-akute Gesundheitsbauprojekte mit einem Projektwert von 15 Mio. bis 60 Mio. € (exkl. MwSt.) in der Region Galway, Mayo und Roscommon. Das erste Projekt umfasst den Neubau eines 75-Bett-Pflegeheims (CNU) auf dem Campus des Ballina District Hospital mit Anbindung an das bestehende Krankenhaus. Das CNU wird auf 3 Etagen (25 Einzelzimmer mit Bad pro Etage, nach HIQA-Standards) errichtet, inkl. 10 Demenzpflegeplätze im Erdgeschoss. Umfangreiche Umbauten im bestehenden Krankenhausflügel (Küche, Physiotherapie, Wäscherei, Tagespflege) sind enthalten. Gesamtfläche ca. 7.960 m², inkl. Abriss, Neubau, Sanierung, Parkplätze, Umspannwerk und Medizingebäude.Multi- Party Framework Agreement for HSE West Civil/Structural Engineering Services (C+S) - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West
Health Service Executive (HSE)KildareFramework für HSE West Bau-/Strukturengenieurleistungen (C+S) für Nicht-akute Gesundheitskapitalarbeiten (€15M-€60M exkl. MwSt.) in Galway, Mayo und Roscommon. Projekt umfasst den Bau einer neuen 75-Bett-Gemeinschaftsstation (CNU) mit 3 Etagen (25 Einzelzimmer nach HIQA-Standards) im Ballina District Hospital Campus sowie Umgestaltung der bestehenden weiblichen Abteilung des Bezirkskrankenhauses für kommerzielle Küchen, Physiotherapie und Dienstleistungen. Die Gesamtfläche beträgt ca. 7.960 m².Multi- Party Framework Agreement for HSE West Quantity Surveying Services - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West
Health Service Executive (HSE)KildareFramework für HSE West Quantity Surveying Services (Framework 2025) für nicht-akute Gesundheitskapitalarbeiten (€15M bis €60M exkl. MwSt.) in Galway, Mayo und Roscommon. Projekt umfasst den Bau einer neuen 75-Bett-Community Nursing Unit (CNU) mit 3 Etagen (Einzelzimmer nach HIQA-Standards für ältere Menschen), Anbindung an das bestehende Krankenhaus sowie Umgestaltung der weiblichen Abteilung des Bezirkskrankenhauses inklusive Physiotherapie und Küchenbereiche. Die Gesamtfläche beträgt ca.Multi- Party Framework Agreement for HSE West Fire Safety Consultancy Services - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West
Health Service Executive (HSE)KildareRahmenvereinbarung für Brandschutzberatungsdienste der HSE West, Framework 05 für nicht-akute Gesundheitsbauprojekte im Wert von 15 Mio. € bis 60 Mio. € (exkl. MwSt.) in den Regionen Galway, Mayo und Roscommon. Das anfängliche Projekt umfasst den Neubau einer 75-Bett-Pflegeeinheit (CNU) auf dem Campus des Ballina District Hospital mit Anbindung an das bestehende Krankenhaus, dreistöckig mit 25 Einzelzimmern je Etage nach HIQA-Standards (10 Demenz-Pflegeplätze im EG), Umbau und Aufwertung des bestehenden Krankenhauss sowie Außenanlagen. Gesamtfläche ca. 7.960 m².Multi- Party Framework Agreement for HSE West Assigned Certifier Services - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West
Health Service Executive (HSE)KildareRahmenvereinbarung für Assigned Certifier Services im HSE West Bereich (Galway, Mayo, Roscommon) für Non-Acute Healthcare Capital Works mit Projektwerten von 15 Mio. € bis 60 Mio. € (exkl. MwSt.). Das erste Projekt umfasst den Neubau eines 75-Bett Community Nursing Units (CNU) auf dem Campus des Ballina District Hospital, mit Verbindung zum bestehenden Krankenhaus. Das CNU hat 3 Etagen mit je 25 Einzelzimmern (inkl. 10 Zimmer für Demenzkranke im Erdgeschoss) nach HIQA-Standards, zzgl. Umbau und Sanierung der bestehenden Frauenstation, Physiotherapie, Produktionsküche, Wäscherei, Tagespflege etc. Gesamtfläche ca. 7.960 m², inkl. Abriss, Neubau, Außenanlagen, Parkplätze, neues Umspannwerk und Medizingebäude.Multi- Party Framework Agreement for HSE West Architect Services (Including Planner and BIM) - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West
Health Service Executive (HSE)KildareMulti-Party Rahmenvertrag für Architekturdienstleistungen (inkl. Planer und BIM) der HSE West - Rahmenvertrag 05 für nicht-akute Gesundheitsbauprojekte mit einem Projektwert von €15M bis €60M exkl. MwSt. für die Region HSE West (Galway, Mayo und Roscommon). Das erste Projekt umfasst den Neubau einer 75-Bett-Pflegeeinrichtung auf dem Campus des Ballina District Hospital mit direkten Anschlüssen an das bestehende Krankenhaus. Die neue Einrichtung erstreckt sich über 3 Etagen mit 25 Einzelzimmern pro Etage nach HIQA-Standards, inklusive Demenzbereich im Erdgeschoss. Zusätzlich sind umfangreiche Umbau- und Aufwertungsarbeiten im bestehenden Krankenhaus vorgesehen, darunter eine gewerbliche Produktionsküche, Physiotherapie, Wäscherei, Personalumkleiden und Tagespflege. Die Gesamtfläche beträgt ca. 10.834 m², inklusive Abriss, Neubau, Dachtechnik, Parkplätze, Umspannwerk und Nebengebäude.Multi- Party Framework Agreement for HSE West Employers Representative Services - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West
Health Service Executive (HSE)KildareMulti- Party Framework Agreement for HSE West Employers Representative Services Framework 2025 - Framework 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West region (Galway, Mayo and Roscommon). The Initial project will consist of the construction of a new build 75 bed Community Nursing unit (CNU) within the Ballina District Hospital campus with direct linkages into the existing Ballina District Hospital. The new build 75 bed Community Nursing unit (CNU) will consist of 3 floors with 25 single ensuite bed room accommodation to HIQA standards for Residential Care Settings for Older People in Ireland at each level Ground Floor, First Floor, Second Floor (level 0,1, 2) along with linkages to existing hospital street, new stairways, service lift and new 2 Nr. Bed Lifts, including new carpark areas, etc. Note: on the Ground Floor there will be 10 single ensuite bedrooms which will be allocated to residents with dementia. There will also be extensive re-planning, upgrade works and reconfiguration of the existing district hospital female wing including physiotherapy area within the single storey and the two-storey central building structure, to provide commercial production kitchen with ancillary support rooms, physiotherapy area, laundry, staff changing and Day-care Services, etc; to complete the interface works with new the 75-bed CNU unit on site. The floor area of this project is in the region of 7,960 m2 which consists of the following: Demolishing the existing building structure on site, Construction and fit-out of a new 75 bed Community Nursing unit over 3 floors and roof top M E Plant room include extensive garden areas for the CNU, Refurbishment of the Existing Main District Hospital, Construction of new Car parking areas on site, Construction of a new Sub-station building including generator room and the Construction of a new medical building. Each element of building works, Demolishing, Diversion of Underground Services, coMulti- Party Framework Agreement for HSE West Building Services Engineering (M+E) - FW 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West
Health Service Executive (HSE)KildareMulti- Party Framework Agreement for HSE West Building Services Engineering (M+E) Framework 2025 - Framework 05 Non Acute Healthcare Capital Works - Project Value €15M to €60M excl. Vat for HSE West region (Galway, Mayo and Roscommon). The Initial project will consist of the construction of a new build 75 bed Community Nursing unit (CNU) within the Ballina District Hospital campus with direct linkages into the existing Ballina District Hospital. The new build 75 bed Community Nursing unit (CNU) will consist of 3 floors with 25 single ensuite bed room accommodation to HIQA standards for Residential Care Settings for Older People in Ireland at each level Ground Floor, First Floor, Second Floor (level 0,1, 2) along with linkages to existing hospital street, new stairways, service lift and new 2 Nr. Bed Lifts, including new carpark areas, etc. Note: on the Ground Floor there will be 10 single ensuite bedrooms which will be allocated to residents with dementia. There will also be extensive re-planning, upgrade works and reconfiguration of the existing district hospital female wing including physiotherapy area within the single storey and the two-storey central building structure, to provide commercial production kitchen with ancillary support rooms, physiotherapy area, laundry, staff changing and Day-care Services, etc; to complete the interface works with new the 75-bed CNU unit on site. The floor area of this project is in the region of 7,960 m2 which consists of the following: Demolishing the existing building structure on site, Construction and fit-out of a new 75 bed Community Nursing unit over 3 floors and roof top M E Plant room include extensive garden areas for the CNU, Refurbishment of the Existing Main District Hospital, Construction of new Car parking areas on site, Construction of a new Sub-station building including generator room and the Construction of a new medical building. Each element of building works, Demolishing, Diversion of Underground Services, construction of the new 75 bed CNU, etc, will be tendered as a separate construction contracts (such as enabling works packages main construction package), subject to statutory approvals, HSE Approvals, Funding etc., Please see SAQ document pack.Multi-Party Framework Agreement for HSE Design Team Services Framework 2024 – FW04: Acute Healthcare Capital Works – project value €15M - €60M excl. VAT – Southeast
Health Service Executive (HSE)KildareDie Health Services Executive (HSE) schreibt ein Multi-Party-Framework-Abkommen für Designteam-Dienstleistungen (Los 1-9) für akute Gesundheitskapitalprojekte im Wert von €15M - €60M (ohne MwSt.) in Südostirland aus. Die Lose umfassen verschiedene Fachdisziplinen wie Architektur, Quantity Surveyor, Gebäudetechnik, Tiefbau und Brandschutz. Der Rahmenvertrag soll für die Region Waterford, Wexford, Carlow, Kilkenny und South Tipperary gelten. Das erste Projekt ist ein geplantes Gebäude und einMulti-Party Framework Agreement for HSE Design Team Services Framework 2024 – FW03: Non-Acute Healthcare Capital Works – project value €1M - €15M excl. VAT - Southeast
Health Service Executive (HSE)KildareMULTI-PARTY FRAMEWORK AGREEMENT FOR HSE DESIGN TEAM SERVICES FRAMEWORK 2024 – FRAMEWORK 03: NON-ACUTE HEALTHCARE CAPITALWORKS – PROJECT VALUE €1M - €15M EXCL. VAT. This framework will include the following design team disciplines (Lots): Lot 1: Architect (AR) as Principal Service Provider with the following Specialists domestic subconsultants or in-house specialisms: a. Planner (PL), b. Project Supervisor Design process (PSDP), c. Fire Safety Consultant (FSC) and d. BIM Information Manager(BIM). Lot 2: Quantity Surveyor (QS), as Principal Service Provider. Lot 3: Building Services Engineer (ME), as Principal Service Provider. Lot 4: Civil and Structural Engineer (CS), as Principal Service Provider. Lot 5: Employer’s Representative (ER), as Principal Service Provider. Lot 6: Energy Efficient Design Facilitator (EEDF), as Principal Service Provider. Lot 7: Assigned Certifier (AC), as Principal Service Provider. The Health Services Executive (HSE) invites expressions of interest, under the Restricted Procedure, from suitably qualified services providers for the provision of design team services (including Specialist Skills Providers) per the above Lot listing for which it is proposed to establish a Multi-Party Framework Agreement for each Lot type to award call-off contracts for Non-Acute Healthcare Capital Works – project value €1M - €15M excl. VAT within Waterford, Wexford, Carlow, Kilkenny and South Tipperary Please note that the INITIAL project forming Framework 03 for this regional office will be: A Proposed Ambulance Development at Kelvin Grove, Athy Road, Carlow
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Health Service Executive (HSE).
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.