Danmarks Tekniske Universitet - DTUKgs. LyngbyTED
Membrane Filtration System (water recovery system)
Required is a membrane filtration system. e.g., a reverse osmosis membrane system or nanofiltration system, cf. Appendix 1 – Requirement Specification.
Water Treatment
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Danmarks Tekniske Universitet - DTU
- Published:
- March 02, 2026
- Deadline:
- April 02, 2026
- Topic:
- Water Treatment
Tender description
Required is a membrane filtration system. e.g., a reverse osmosis membrane system or nanofiltration system, cf. Appendix 1 – Requirement Specification.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock49 details capturedDocuments
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock1 detail capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
10Hire and operation of water meters, equipment and cloud system for the Water and Sewage system - stage 1 qualification phase.
Bærum kommuneSANDVIKABærum municipality, hereafter called the contracting authority, invites tenderers to a competition with negotiations for a contract for the hire, installation and operation of water meters and cloud services for water and sewage. A more detailed description is in SSA-L Annex 1 Requirement Specifications (technical description).VEAT - VMS System Upgrade
Fjársýsla ríkisinsReykjavíkDeadline: Apr 30Software development/ Upgrade of Trackwell’s VMS-system to meet new NEAFC requirements, which requires upgrading the system from ERS to Flux in accordance with NEAFC specifications. The VMS system is operated by Fiskistofa (Directorate of Fisheries) and Landhelgisgæsla (Icelandic Coast Guard).Membrane Processing System
Teagasc - the Agriculture and Food Development AuthorityCarlowDeadline: Apr 27Membrane Processing SystemA mobile Cleaning In Place (CIP) system and a centralized pH system
Danmarks Tekniske Universitet - DTUKgs. LyngbyDeadline: Apr 10This tender concerns the procurement of a mobile Cleaning In Place (CIP) system and a centralized pH system for the demonstrator-scale acetone production plant, the main deliverable of the PYROCO2 project. The PYROCO2 project is a European Innovation Action funded in 2021 under the EU's Green Deal initiative, involving 20 partners from 11 countries. The project aims to demonstrate large-scale biotechnological acetone production using hydrogen and CO2 as feedstocks, with a target annual production capacity of approximately 300 tons at TRL7. The demonstrator facility will be constructed and operated at Herøya Industrial Park, Porsgrunn, Norway.Operational control system for water and sewage Ullensaker
Øvre Romerike InnkjøpssamarbeidJessheimDeadline: Apr 28Beschaffung eines neuen Betriebsleitsystems zur Überwachung und Steuerung der kommunalen Wasser- und Abwasserinfrastruktur. Ziel ist die Sicherstellung eines stabilen und sicheren Betriebs der für Leben, Gesundheit und Umwelt kritischen Dienstleistungen, da der Vertrag für das aktuelle System gekündigt wurde.Construction of Trabzon Water Supply System - Completion Works
Department of Project Implementation (DoPI), General Directorate of European Union and Foreign Relations (DGEUFR), Ministry of Environment, Urbanization and Climate Change (MoEUCC)AnkaraDeadline: Jun 14Bau von Wasserleitungen: 2.600 Hausanschlüsse (DN32-DN110, ca. 15.600 m), Verteilnetz (48.500 m DN110-DN225, 1.500 m DN250-DN630) sowie 9.000 m Hauptleitungen (DN630-DN1000). Installation eines SCADA-Systems, 16 Durchflussmesser, 1 PRV-Kammer, 7 Chlor-Messgeräte, 18 Entlüftungs-/Entleerungskammern, 1.055 Ventilboxen sowie 51 PRV-Kammern inkl. Armaturen, Manometern und Zubehör.Agreement on an operational control system (SCADA) for water and sewage
Nittedal KommuneNittedalNittedal Kommune (Akershus, 26.000 Einwohner) vergibt einen Wettbewerb zur Beschaffung eines neuen Leit- und Fernwirksystems (SCADA) für die Wasserversorgung und Abwasserentsorgung. Der Auftrag umfasst die Lieferung und Implementierung des Systems für die kommunale Infrastruktur.Logistics system
NTNUTrondheimTo be answered by the Tenderer.System Vereinzeln
DLR e.V.Vergabestelle: Deutsches Zentrum für Luft- und Raumfahrt e.V. (DLR), Pfaffenwaldring 38-40, D-70569 Stuttgart, Deutschland Vergabeverfahren: Verhandlungsvergabe ohne TW gem. § 8 Abs. 4 Nr. 6 UVgO i.V.m. § 12 UVgO vergeben Name des beauftragten Unternehmens:Loomis Industries, Inc. Art und :System Vereinzeln Leistungszeitraum:10/2026 DLR, System VereinzelnKlimawechseltestkammern System
Helmholtz-Zentrum hereon GmbHDas Helmholtz-Zentrum Hereon beschafft ein Klimawechseltestkammern-System. Anforderungen: Probenkapazität für 80x150 cm Proben, integrierte Tanks für 5 Tage SST (ISO 9227). Funktionen: SST (indirekter/direkter Nebel, hohe Ausfallraten bis 5,5 ml/80cm²/h), Trocknung (Umgebung/vorkonditioniert, Schnelltrocknung), Kondensation (bis 60°C, 95-100% RH), kontrollierte Feuchte (15-95% RH). Toleranzen: Temp ±0,75°C, Feuchte ±3% RH. Spezifische Übergangszeiten für Trocknungsprozesse sind definiert.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 02. April 2026.
- Who is the contracting authority?
- The contracting authority is Danmarks Tekniske Universitet - DTU.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.