Tipperary County CouncilClonmel, NenaghTED
Engineering Technical Consultancy Services for the Thurles Inner Relief Road
Tipperary County Council requires technical consultancy services to be provided by a multi-disciplinary Team for the progression of the Thurles Inner Relief Road. This comprises review of existing documents and completion of outstanding deliverables for Stages 3 and 4, and preparation of all deliverables through Stages 5 to 7 inclusive of...
Civil Engineering Design, Traffic Planning
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Tipperary County Council
- Published:
- August 25, 2026
- Deadline:
- September 03, 2026
- Topic:
- Civil Engineering Design
Tender description
Tipperary County Council requires technical consultancy services to be provided by a multi-disciplinary Team for the progression of the Thurles Inner Relief Road. This comprises review of existing documents and completion of outstanding deliverables for Stages 3 and 4, and preparation of all deliverables through Stages 5 to 7 inclusive of the Infrastructure Guidelines, published by the the Department of Public Expenditure, NDP Delivery and Reform and the Technical Appraisal Framework published by the Department of Transport. The Scope is more fully described in the Brief of Services included in the Tender Documents.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
8Rahan Flood Relief Scheme — Engineering and Environmental Consultancy Services
Offaly County Council_448TullamoreDeadline: Sep 18Offaly County Council invites tenders for engineering and environmental consultancy services for the Rahan Flood Relief Scheme at Tullybeg, Rahan, County Offaly, on the River Clodiagh. The Scheme comprises approximately 430 metres of reinforced concrete flood defence wall along the right bank of the River Clodiagh, with embankment at the tie-in points, protecting residential properties and the wastewater treatment plant to the 1 percent AEP fluvial standard. The commission covers Stage (ii) statutory consent and detailed design, Stage (iv) construction-stage services and Stage (v) handover and defects period, under the Capital Works Management Framework. The construction works will be delivered by Office of Public Works direct labour; procurement of a works contractor is not included in this commission. The services include detailed design, hydrological and hydraulic modelling, ground investigation specification and interpretation, review and validation of the completed EIA and Appropriate Assessment screening, statutory consent documentation for approval under Part 8, works package preparation for direct labour delivery, Project Supervisor Design Process duties, construction-stage technical support and design authority, and handover documentation. The Scheme is funded by the Office of Public Works.Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
Tipperary County CouncilClonmel, NenaghDeadline: Oct 02Background - The OPW, working in partnership with Tipperary County Council and other Local Authorities, commissioned and have completed the Shannon Upper and Lower River Basin Catchment Flood Risk Assessment and Management (CFRAM) Study. The Shannon Upper and Lower River Basin (‘Shannon’) CFRAM Study Area included Nenagh as an Area for Further Assessment (AFA) and identified that a flood relief scheme for the community would be appropriate to be further developed for implementation. To advance and implement a flood relief scheme for Nenagh, Tipperary County Council, supported by a Steering Group, intends to commission a Contract to develop and assist with the implementation of the Scheme. This Contract will be procured using one Consulting firm (hereafter referred to as “the Consultant”) to progress both the Engineering and Environmental elements of the Tender Specification. Project Objectives - The objective of this project is the identification, design and submission for planning consent of a Flood Relief Scheme, that is technically, socially, environmentally and economically acceptable, to alleviate the risk of flooding in the community of Nenagh to a determined Standard of Protection, to complete the detailed design, and to procure, manage and oversee the construction of that Scheme. The tasks that are to be carried out by the Consultant to fulfil this objective are described in detail within the Tender Specification.Bogganfin/Tuam Road Link Road, Monksland Strategic Road Project - Engineering Consultancy Service
Roscommon County Council_424RoscommonDeadline: Aug 14Engineering Consultancy Services for the delivery of Stages 1 to 4 of the Monksland Strategic Road Project linking the R362 to the N61 at Monksland, Co. RoscommonDonegal County Council - Multi-Disciplinary Engineering and Other Specialist Technical Consultancy Services for Project Phases 5 to 7 for the Design and Implementation of the Aghilly Road Project
Donegal County Council_1193LiffordDeadline: Sep 30Donegal County Council (the Employer and Sponsoring Agency) intends to appoint a multidisciplinary engineering consultant to progress the Aghilly Road Project through Housing Infrastructure Investment Fund (HIIF) Phases 5, 6 and 7: Detailed Design and Procurement; Construction and Implementation; and Close-out and Review. The appointment shall be under the applicable Standard Conditions of Engagement for Consultancy Services (Technical), as identified in the procurement documents. The Consultant shall provide all professional services reasonably necessary to deliver the defined scope, including design, PSDP, procurement support, Employer’s Representative services, construction supervision, cost/risk management, contract administration and project close-out. The Consultant shall support the Employer in satisfying HIIF phase approvals and Infrastructure Guidelines approval gates.Single Party Framework Agreement for Engineering Consultancy Led, Single Point, Multi-Disciplinary Design Team for the Lisbunny Link Road
Tipperary County CouncilClonmel, NenaghDeadline: Oct 08Tipperary County Council has identified the need to engage the services of an Engineering Consultancy led, single point, multi-disciplinary design team to advance the preliminary design, detailed design, statutory planning requirements, enabling and procurement to progress the Lisbunny Link Road Scheme, including carrying out the duties of PSDP, along with the procurement of other services, surveys and investigations as required to advance the scheme. The subject of this brief is located on the outskirts of Nenagh town centre within the Municipal District of Nenagh, County Tipperary. The scheme is located between the R445 Dublin Road to the south and the L1211 Old Birr Road to the north. It incorporates a new extension of the existing L5146 Lisbunny Industrial Park road to join the L1211. The proposed new extension is approximately 350 metres in length. Options for the upgrade of the existing L5146 are to be examined and designed within the brief also. The length of existing road potentially to be upgraded is approximately 550 metres. This tender is for the establishment of a Single Party Framework Agreement and the initial contract being for CWMF Stages (i) to (iii). Subsequent Stages may be called off from the Framework. See Service Requirements for further details .Framework for the Provision of Technical Services for Transport Technology Projects
National Transport Authority_1149DublinThe objective of this competition is to establish a Framework of suitably qualified Subject Matter Experts (“SMEs”) who will be available, upon request, to tender for the provision of certain technical services in relation to Transport Technology projects within the Authority or proposals funded by the Authority.Consultancy services technical modernisation of the payment area in the Nav
ARBEIDS- OG VELFERDSETATENMo i RanaDeadline: Oct 05Nav manages large amounts in society, and the payment of benefits is decisive for the welfare community functioning. The payment of services is a socially critical task for, among other things, ensuring subsistence and is a crucial part of the value chain for all services that nav provides. There is a need to carry out a technical modernisation of the systems in the payment area in order to support this part of nav ́s social mission. Nav shall establish a project that shall be responsible for the modernisation. The Norwegian Labour and Welfare Administration invites tenderers to a competition for consultancy agreements to cover Nav ́s need for competence and capacity to carry out the project. The deadline for abidance with the tender is 3 months after the tender deadline.Framework for Engineering and Environmental Consultancy Services
Inland Fisheries IrelandDublinDeadline: Sep 11IFI’s NBMP is establishing a multi-operator Framework Agreement(s) for the procurement of Engineering and Environmental Consultancy Services. The Framework Agreement(s) will establish the terms governing contracts to be awarded during the specified time period, with regards to price and capability to provide the service required. The Framework(s) will be for Engineering Consultancy and Design Services as outlined below; • Lot 1 – Civil/Structural/Hydraulic Engineering Services • Lot 2 – Environmental/Ecological Services • Lot 3 – Integrated Consultancy Services (less than 350K) • Lot 4 – Integrated Consultancy Services (more than €350K)
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 03. September 2026.
- Who is the contracting authority?
- The contracting authority is Tipperary County Council.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.