Leitrim County Council_2136LeitrimTED
Consultant Engineering Services for the Design of Rossinver Wastewater Treatment Plant and Ancillary Works in Co. Leitrim for Leitrim County Council on the PEACEPLUS funded FLOW Project
The Procurement of Consultant Engineering Services for the Design of Rossinver Wastewater Treatment Plant and Ancillary Works in Co. Leitrim for Leitrim County Council on the PEACEPLUS funded FLOW Project. Part 8 Planning has been granted for these works. The project stages consist of the following: - 1. Document Review and Project Survey...
Civil Engineering Design, Surveying, Construction Supervision
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Leitrim County Council_2136
- Published:
- May 27, 2026
- Deadline:
- June 24, 2026
- Topic:
- Civil Engineering Design
Tender description
The Procurement of Consultant Engineering Services for the Design of Rossinver Wastewater Treatment Plant and Ancillary Works in Co. Leitrim for Leitrim County Council on the PEACEPLUS funded FLOW Project. Part 8 Planning has been granted for these works. The project stages consist of the following: - 1. Document Review and Project Surveys; 2. Development of Detailed Design; 3. Tender Activation, Evaluation and Award; 4. Construction; 5. Handover and Final Completion
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10Panel for Provision of mentoring and related services for the Local Enterprise Office in Leitrim County Council
Leitrim County Council_2136LeitrimDeadline: Jul 30Establishment of a Panel of Mentors for the Local Enterprise Office in Leitrim County Council, covering multiple lots. Applications accepted throughout the 3-year panel lifecycle (1 Aug 2026 - 31 Jul 2029). First tranche deadline: 1 June 2026.Establishment of a Multi-Party Framework Agreement for Design and Build Works Contractors for the Delivery of Large-Scale Social Housing Projects (Project Value Over €5m) for Cork County Council
Cork County CouncilCorkDeadline: Jun 26Cork County Council is establishing a Multi-Party Framework Agreement for Works Contractors, including multi disciplinary Design Team Services, for the delivery of social housing projects using Modern Methods of Construction (MMC) with an estimated project value in excess of €5 million and no upper limit. Modern Methods of Construction (MMC) Specialist(s) - including but not limited to Volumetric Housing Units; Panelised (Timber Frame, Light Gauge Steel Frame, Precast Concrete Panels and Structurally-Insulated Panels); Insulated Concrete formwork. The framework will have an overall estimated value of €250 million, and it is intended that seven contractors will be appointed. The framework is for Contractor-Designed projects, with PW-CF2 to be used as the form of public works contract. The following consultancy services will also be required as part of the Contractor’s Design Team: • Designer – Architectural Services (Contractor Design Specialist), including PSDP • Designer – Civil and Structural Engineering Services (Contractor Design Specialist) • Designer – Mechanical and Electrical Services (Contractor Design Specialist) The initial project comprises the construction of 45 No. social housing units on a Design and Build basis using Modern Methods of Construction (MMC) at Broomfield West (Phase B), Midleton, Co. Cork. The accommodation comprises: • 10 No. 1-bed apartments • 8 No. 2-bed apartments • 3 No. two-storey 4-bed semi-detached houses • 8 No. 2-bed terrace houses • 16 No. 3-bed terrace houses The works will also include associated mechanical and electrical services installations, together with associated site development and external works. A set of Part 8 Planning Drawings accompanies this Suitability Assessment Questionnaire for illustration purposes. There is no guarantee of any subsequent contracts under the framework. However, any additional projects arising during the term of the framework will be awarded by way of mini-competition, with tenders assessed on the basis of cost and quality. Additional information regarding the scope of the framework and the initial contract will be provided at Stage 2 of the process. For the avoidance of doubt, the delivery period for any contract awarded under the framework may extend beyond the expiry date of the framework agreement.ID 6396032 - AFBI – Supply, Delivery, Installation and Commissioning of an Imaging Flow-Cytometry System for Automated Shipboard Phytoplankton Analysis to Support the SEUPB PEACEPLUS-Funded ACCLIMATISE Project
Construction and Procurement DeliveryBelfastDeadline: Jul 19The Agri‑Food and Biosciences Institute (AFBI) is one of the world’s leading providers of scientific research and evidence-based services to government, non-governmental, and commercial organisations. With a unique breadth of facilities and multidisciplinary scientific capability spanning agriculture, animal health, food, the environment, biosciences, and economics, AFBI undertakes a wide range of impactful research projects for both the public and private sectors.Funding has been secured through the Special EU Programmes Body (SEUPB) administered PEACEPLUS scheme to deliver the ACCLIMATISE project, an all-island initiative aimed at developing an integrated marine climate change monitoring and assessment toolbox for the island of Ireland. As part of this programme, AFBI is seeking to procure next‑generation observational technologies capable of monitoring and quantifying changes in plankton communities and associated marine food webs within the Irish Sea. The Fisheries and Aquatic Ecosystems Branch (FAEB) of AFBI requires the procurement of one flow cytometry-based plankton imaging system capable of high resolution imaging, optical triggering, and automated morphological analysis of marine plankton and suspended particulates. Suppliers should refer to the Specification for further information on the requirements.Provision of services for a community-led design and delivery of a multi-day EU funded food heritage festival under the SLOWTOUR project delivered by Limerick City and County Council (LCCC)
Limerick City and County Council_103432Limerick.Provision of professional event design, community engagement, management and delivery services for Year 1 of a food-heritage festival pilot in 2026 under the Interreg NWE SLOWTOUR project. Services include coordinating community engagement, co-design activities, developing a festival programme celebrating Limerick's food heritage, involving local producers, and planning/delivering the multi-day festival with immersive, educational, and participatory elements. The festival is a pilot action contributing to SLOWTOUR project learning and reporting requirements.TENDER FOR THE DESIGN, SUPPLY, DELIVERY AND INSTALLATION OF A MODULAR UNIT AND ASSOCIATED WORKS AT ARC HEALTHY LIVING, IRVINESTOWN. PEACEPLUS FUNDED UPGRADE WORKS
Fermanagh and Omagh District CouncilEnniskillenDeadline: Jun 21Design, supply, delivery, and installation of a modular unit and associated civil engineering works at ARC Healthy Living, Irvinestown, Co. Fermanagh. Contract period: 14 weeks off-site design/prefabrication and 4 weeks on-site construction. Funded through PEACEPLUS Local Action Plan Theme 1.1 'Enhancement to Existing Community Spaces/Halls'.Multi Party Framework Agreement for Consultant Engineering Design Services for Flood Alleviation Projects in County Dublin, with an initial contract Sandymount Coastal Flood Alleviation Scheme
Dublin City CouncilDublinDublin City Council seeks to establish a Multi Party Framework Agreement for Consultant Engineering Design Services for Flood Alleviation Projects in County Dublin, with an initial contract for the Sandymount Coastal Flood Alleviation Scheme. Assessment of the initial contract will lead to admission and ranking of 8 economic operators for the 4-year framework. Subsequent projects are awarded via mini-competitions based on quality and price. Priority is given to flood alleviation incorporating river/coastal restoration, Green and Blue Infrastructure, environmental protection, and nature-based solutions.Tender for the appointment of an Architect-led Integrated Design Team for the redevelopment of The Cloister Building and associated areas in Ennis, Co. Clare
Clare County CouncilEnnisDeadline: Jun 02Tender for the appointment of an Architect-led Integrated Design Team for the redevelopment of The Cloister Building and associated areas in Ennis, Co. Clare.PROJECT OWNER FOR THE CO-LOCATION WELFARE CENTRE - HJELMELAND MUNICIPALITY
HRP ASOSLODeadline: Aug 31Hjelmeland municipality carries out an open tender round to find a project owner to rent the work with the co-location of Årdal and Hjelmeland sheltered accommodation centres. A moglegheits study has been published for co-localisation in Hjelmeland. The new sheltered accommodation centre shall contain these services: • Heildøgns institution for long time (sjukeheim) • short term • home centre • occupational therapist • day centre • sheltered accommodation if the municipality shall operate a production kitchen, this should be co-housed with the welfare services. Local aids stores localisers in the centre of Hjelmeland. • In order to use all the advantages of a co-location, plans must be made for a staged development of the area to a multi-functional and future-based health centre, with both the sheltered accommodation centre, the health centre, the shout-bustadar, an ambulance station and other relevant health related services. • The project shall prepare a plan for after-use for, with a view to the development of a leilegheitsbygg with different joint functions, see the attached requirement specifications for further mention of the project tenant ́s work assignments and other requirements connected to the rolla.LIMERICK CITY AND COUNTY COUNCIL IRELAND Architect led integrated Design Team Consultancy Services including PSDP for the proposed refurbishment and new build works at No 35 to 39 Nicholas Street
Limerick City and County Council_103432Limerick.Architect Led Multi disciplinary design team to include Conservation Architect G1Structural Fire and M and E Engineers QS Project Manager Site Archaeologist and PSDP The development of a Design and Innovation Hub at Nos 35 to 39 Nicholas Street Limerick a Protected Structure No RPS 7016 to comprise artist studios workspaces retail area exhibition space and restaurant with associated outdoor area adjoining St Peter Street The development will include the erection of new part two storey part single storey building incorporating the upstanding walls of the medieval house and their associated fabric and features at Nos 35 to 39 Nicholas Street the change of use from residential refurbishment and renovation of No 35 Nicholas Street The demolition of a two storey extension to the rear and its replacement with a three storey extension the erection of a single storey workshop unit to the rear of No 35 and all associated site works This development is within the site of Recorded Monuments LI005-017006 and LI005-017123 both classified as House-medievalSupervision of the works for Dust & NOx reduction at TPP Kosovo B, Units B1 and B2 – Phase 2
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsDeadline: Jul 06The purpose of the service contract is to provide continuation of the supervision services during the remaining implementation period of the Works for Dust and NOx reduction measures at TPP Kosovo B, Units B1 and B2.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 24. Juni 2026.
- Who is the contracting authority?
- The contracting authority is Leitrim County Council_2136.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.