Fermanagh and Omagh District CouncilEnniskillenTED
TENDER FOR THE DESIGN, SUPPLY, DELIVERY AND INSTALLATION OF A MODULAR UNIT AND ASSOCIATED WORKS AT ARC HEALTHY LIVING, IRVINESTOWN. PEACEPLUS FUNDED UPGRADE WORKS
Design, supply, delivery, and installation of a modular unit and associated civil engineering works at ARC Healthy Living, Irvinestown, Co. Fermanagh. Contract period: 14 weeks off-site design/prefabrication and 4 weeks on-site construction. Funded through PEACEPLUS Local Action Plan Theme 1.1 'Enhancement to Existing Community Spaces/Hal...
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Fermanagh and Omagh District Council
- Published:
- May 21, 2026
- Deadline:
- June 21, 2026
- Object:
- Gemeinde- / Bürgerzentrum
Object classification
- Gemeinde- / BürgerzentrumPrimary
Tender description
Design, supply, delivery, and installation of a modular unit and associated civil engineering works at ARC Healthy Living, Irvinestown, Co. Fermanagh. Contract period: 14 weeks off-site design/prefabrication and 4 weeks on-site construction. Funded through PEACEPLUS Local Action Plan Theme 1.1 'Enhancement to Existing Community Spaces/Halls'.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Procedure data
Unlock5 details capturedPublication number · Buyer reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
9Consultant Engineering Services for the Design of Rossinver Wastewater Treatment Plant and Ancillary Works in Co. Leitrim for Leitrim County Council on the PEACEPLUS funded FLOW Project
Leitrim County Council_2136LeitrimDeadline: Jun 24The Procurement of Consultant Engineering Services for the Design of Rossinver Wastewater Treatment Plant and Ancillary Works in Co. Leitrim for Leitrim County Council on the PEACEPLUS funded FLOW Project. Part 8 Planning has been granted for these works. The project stages consist of the following: - 1. Document Review and Project Surveys; 2. Development of Detailed Design; 3. Tender Activation, Evaluation and Award; 4. Construction; 5. Handover and Final CompletionRFT 01/26/GM - Works Contractor and PSCS for Construction of the Future Living Laboratory for Atlantic Technological University at the Galway City Campus
Atlantic Technological UniversityLetterkennyDeadline: Jun 09Construction of a new Future Living Laboratory building of circa 3,975 sq m at ATU Galway City Campus (east side, Ballybane Road). Three floors plus part lower ground with classrooms, seminar rooms, lecture theatres, social spaces, and ancillary areas. Includes pedestrian access to Ballybane Road, bridges connecting to existing building at first floor, road table, alterations to northern car park (removal of modular building, reconfiguration of parking including DAC spaces, set-down, bicycle parking), back-lit signage, photovoltaic panels, site lighting, and all ancillary works.EoI - Suitability Assessment for Design and Build Works Contractors for the construction of 12 no. Social Housing units together with all associated site works at Grange, Co.Sligo.
Sligo County CouncilSligoDeadline: Jun 26The construction of 12 no. 1 and 2 storey dwellings comprising of 4 two-bedroom apartments, 1 two bedroom house, 6 three-bedroom houses, and 1 four-bedroom house together with all associated site works at Harte’s Court (Cúirt Uí Airt), Grange Townland, Grange, Co.Sligo, for Sligo County Council.WCCC26 198 Architect Led Design Team Services for the design and build development of 78 No. social and affordable housing units including all associated site works at Fairlane, Dungarvan, Co. Waterf
Waterford City and County Council_103683WaterfordDeadline: May 20Planung und schlüsselfertige Errichtung von 78 Wohneinheiten für den sozialen und erschwinglichen Wohnungsbau in Fairlane, Dungarvan, Co. Waterford. Das Projekt umfasst eine Mischung aus 1-, 2- und 3-Zimmer-Wohnungen sowie alle zugehörigen Erschließungs- und Außenarbeiten. Die Leistungen beinhalten ein architektengeführtes Planungsteam für die Design-and-Build-Entwicklung.Establishment of a Multi-Party Framework Agreement for Design and Build Works Contractors for the Delivery of Large-Scale Social Housing Projects (Project Value Over €5m) for Cork County Council
Cork County CouncilCorkDeadline: Jun 26Cork County Council is establishing a Multi-Party Framework Agreement for Works Contractors, including multi disciplinary Design Team Services, for the delivery of social housing projects using Modern Methods of Construction (MMC) with an estimated project value in excess of €5 million and no upper limit. Modern Methods of Construction (MMC) Specialist(s) - including but not limited to Volumetric Housing Units; Panelised (Timber Frame, Light Gauge Steel Frame, Precast Concrete Panels and Structurally-Insulated Panels); Insulated Concrete formwork. The framework will have an overall estimated value of €250 million, and it is intended that seven contractors will be appointed. The framework is for Contractor-Designed projects, with PW-CF2 to be used as the form of public works contract. The following consultancy services will also be required as part of the Contractor’s Design Team: • Designer – Architectural Services (Contractor Design Specialist), including PSDP • Designer – Civil and Structural Engineering Services (Contractor Design Specialist) • Designer – Mechanical and Electrical Services (Contractor Design Specialist) The initial project comprises the construction of 45 No. social housing units on a Design and Build basis using Modern Methods of Construction (MMC) at Broomfield West (Phase B), Midleton, Co. Cork. The accommodation comprises: • 10 No. 1-bed apartments • 8 No. 2-bed apartments • 3 No. two-storey 4-bed semi-detached houses • 8 No. 2-bed terrace houses • 16 No. 3-bed terrace houses The works will also include associated mechanical and electrical services installations, together with associated site development and external works. A set of Part 8 Planning Drawings accompanies this Suitability Assessment Questionnaire for illustration purposes. There is no guarantee of any subsequent contracts under the framework. However, any additional projects arising during the term of the framework will be awarded by way of mini-competition, with tenders assessed on the basis of cost and quality. Additional information regarding the scope of the framework and the initial contract will be provided at Stage 2 of the process. For the avoidance of doubt, the delivery period for any contract awarded under the framework may extend beyond the expiry date of the framework agreement.CT2074/2026 - Works - Tender for the Finishing Works, Supply and Installation of Mechanical and Electrical Works at the Ospizio Complex, Floriana, using Environmentally Friendly Materials
Department of ContractsFlorianaDeadline: Jun 17Tender for the Finishing Works, Supply and Installation of Mechanical and Electrical Works at the Ospizio Complex, Floriana, using Environmentally Friendly MaterialsCT2072/2026 - Tender for the Supply, Installation and Commissioning of Airconditioning Units
Department of ContractsFlorianaDeadline: May 29Lieferung, Installation und Inbetriebnahme von Klimageräten.CT3030/2026 - Tender for the Supply, Delivery, Installation and Commissioning of a Multiplace Hyperbaric Therapeutic Chamber System for the Hyperbaric Unit at Gozo General Hospital
Department of ContractsFlorianaDeadline: Jul 23CT3030/2026 - Tender for the Supply, Delivery, Installation and Commissioning of a Multiplace Hyperbaric Therapeutic Chamber System for the Hyperbaric Unit at Gozo General HospitalCT3018/2026 - Tender for the Supply, Delivery, Installation and Commissioning of Dental Workstations and Compressed Air and Suction Central Systems for the Dental Unit at the Gozo General Hospital
Department of ContractsFlorianaDeadline: Jul 03CT3018/2026 - Tender for the Supply, Delivery, Installation and Commissioning of Dental Workstations and Compressed Air and Suction Central Systems for the Dental Unit at the Gozo General Hospital
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 21. Juni 2026.
- Who is the contracting authority?
- The contracting authority is Fermanagh and Omagh District Council.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.