BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄGdanskTED
CDS Condensate Pumps
The scope of work for this package consists of, but is not limited to, designing, manufacturing and delivering complete and fully operational equipment, detailed as: condensate pumps for the Condensate System (CDS) serving three AP1000 nuclear generating units. The package is anticipated to include nine (9) vertical deepwell, multi-stage ...
Generators, Pumps, Valves & Fittings, Measurement Technology
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
- Published:
- August 10, 2026
- Deadline:
- September 10, 2026
- Topic:
- Generators
Tender description
Show full descriptionCollapse description
The scope of work for this package consists of, but is not limited to, designing, manufacturing and delivering complete and fully operational equipment, detailed as: condensate pumps for the Condensate System (CDS) serving three AP1000 nuclear generating units. The package is anticipated to include nine (9) vertical deepwell, multi-stage centrifugal pumps, arranged as three (3) pumps per unit in a 3 × 50% configuration, complete with drivers, accessories, testing, documentation, quality assurance, inspection, and delivery services. The equipment shall be suitable for installation in the turbine building, designed for long-term reliable operation in a nuclear power plant environment, and compliant with applicable European Union regulations, Polish codes, and relevant industry standards. Interested suppliers should demonstrate experience with comparable large-capacity vertical multi-stage condensate pumps and the capability to support a major nuclear new-build project. NOTE: The quantities and dimensions provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
9Circulating Water Pumps (Concrete Volute)
BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄGdanskDeadline: Aug 28The scope of work for this package consists of design, furnish material, fabricate, test, and deliver (9) vertical concrete volute pumps (based on European Materials, Codes and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP100 Project. The Circulating Water Concrete Volute Pump, pumps brackish Baltic Sea water to remove heat from the main condensers in a once through cooling system configuration. There are 9 total concrete volute pumps for the project site (3 x 33% per unit) with a rated flow of 21.3 m3/s (76,668 m3/hr), pump head of 22.5m, and design life of 60 years. There shall be physical model testing and shop performance testing on the pump.CWS Circulating Water Pumps (Concrete Volute)
BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄGdanskDeadline: Aug 19The scope of work for this package consists of design, furnish material, fabricate, test, and deliver (9) vertical concrete volute pumps (based on U.S. and European Materials, Codes and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP100 Project. The Circulating Water Concrete Volute Pump, pumps brackish Baltic Sea water to remove heat from the main condensers in a once through cooling system configuration. There are 9 total concrete volute pumps for the project site (3 x 33% per unit) with a rated flow of 21.3 m3/s (76,668 m3/hr), pump head of 22.5m, and design life of 60 years. There shall be physical model testing and shop performance testing on the pump. NOTE: The estimates provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. Deadline (Pre-qualification Submittal): September 2026 (Forecast – Subject to change) RFQ Document Issuance: November 2026 (Forecast – Subject to change) Supplier Proposals Due: January 2027 (Forecast – Subject to change) Order Award Date: April 2027 (Forecast – Subject to change) * After completion of the design submittals, the company is placed on hold until release for fabrication. The timing of the release is based on required fabrication and delivery lead times. Required Onsite Date: Unit 1: June 2032 (Forecast – Subject to change) Unit 2 & 3 will be further detailed in the RFQ package.Framework agreement - procurement of fuel pumps and bulk
Trondheim Renholdsverk ASHeimdalDeadline: Aug 19The contracting authority invites tenderers to a competition for a framework agreement for the delivery of advanced bio-fuel (HVO100) and AdBlue from station pumps to the Contracting Authority's vehicles and machines. The objective of the procurement is to ensure a cost efficient and environmentally sustainable fuel system with low greenhouse gas emissions, as well as good accessibility through the supplier ́s station network. See the requirement specifications for a complete description of the delivery. It is a prerequisite that the chosen supplier fulfils relevant industry standards and current requirements for quality, safety and sustainability for the delivery of fuel.Delivery, Assembly and Maintenance of Freshwater Pumps – Wippolderlaan and Alton
N.V. HVCAlkmaarDeadline: Aug 18HVC is a Dutch company in the fields of waste processing and the production and distribution of renewable energy. In the early 2020s HVC started with the first HVC geothermal project. This resulted in a HVC Geothermal Development Program , that now include at minimum 15 geothermal projects. Up to now 3 geothermal projects are in progress of completed. The next 2 projects are geothermal project Wippolderlaan (municipality of Westland) and geothermal project Alton (municipality of Heerhugowaard). The start of the realization of both projects is scheduled in Q3 2027. For these 2 projects HVC has a demand for freshwater pumps. The delivery date for the needed freshwater pumps for the Wippolderlaan project is September 1st, 2027. The delivery date for the needed freshwater pumps for the Alton project is November 1st, 2027. The objective of this Tender is to award a contract to a single supplier for the delivery, assembly, and maintenance of freshwater pumps that shall be used for the realization of the above-ground installation of the Wippolderlaan project and the Alton project. HVC scheduled an online Information Meeting (via Microsoft Teams) on Tuesday July 7th, 2026 from 10.00 to 11.00 (Dutch time). In the event you are interested to join this meeting, please send a message (via de message module on the Mercell platform) that you would like to receive a Teams invitation. Please mention which persons will attend the meeting and what are their contact information.Market survey: Elastomerial disposable pumps for the Hospital Pharmacies in Norway
SYKEHUSINNKJØP HFVADSØDeadline: Jul 25The Hospital Pharmacies in Norway are planning a procurement of elastomerial disposable pumps in small (50-130 ml) and large (150-600 ml) sizes. The objective is to enter into a framework agreement. The pumps shall function as containers/packaging for medicines, ensuring uniform and controlled release with a fixed infusion rate, be free-standing and not use electronic equipment. They shall be usable for administering cytostatica, antibiotics (including citrate buffer preparations), and pain relief including palliative treatment. The pumps shall be suitable for long term infusion (30 minutes to several days), easy to administer, and suitable for health institutions and home care. Deadline for responding to the market survey: Monday 17.08.2026 (10:00).Circulating Water System Intake Equipment Package
BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄGdanskDeadline: Aug 16The scope of work for this package consists of, but is not limited to, designing, furnishing material, fabricating, testing, and delivering complete and fully operational equipment, detailed as: a. Twenty-four (24) automatic dual flow type traveling water screens b. Thirty-three (33) trash racks c. Six (6) motorized trash rack raking systems with associated monorail and support d. structures. Two (2) raking systems per unit where each rake covers six (6) or five (5) trash racks e. Two (2) intake tunnel stop gates (1 per tunnel). Nine (9) circulating water pump suction stop gates. The traveling screens shall be designed for continuous, submerged service in brackish Baltic seawater to support a cooling water intake structure with a depth of 23m. Design conditions for Baltic Sea chloride concentration will be considered and specified further in the RFQ Package. There shall be material selection consideration to exposure conditions such as stagnation, biofouling, mussel formation, and frazil ice formation. NOTE: The quantities and dimensions provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. Actual quantities and dimension numbers will be included in official bid package. Deadline (Pre-qualification Submittal): August 2026 (Forecast – Subject to change); RFQ Document Issuance: November 2026 (Forecast – Subject to change); Supplier Proposals Due: January 2027 (Forecast – Subject to change); Order Award Date: April 2027 (Forecast – Subject to change) * After completion of the design submittals, the company is placed on hold until release for fabrication. The timing of the release is based on required fabrication and delivery lead times. Required On Site Date: Unit 1: July 2032 (Forecast – Subject to change) Unit 2 & 3 will be further detailed in the RFQ package. Additional delivery schedule information will be provided in the RFQ PackageMachine contract OM2 - Brevik and Møllebakken pump stations
Movar IksMossThis procurement, OM2 – Machine contract for Brevik and Møllebakken pumping stations is one of several planned contracts in the part-project "Transfer Facility", and is an execution contract in accordance with NS8405. Contract OM2 will include delivery and installation of pumps and machine technical equipment for Brevik and Møllebakken pumping station, including: • Sewage pumps • Pipes, valves and fittings • Machine technical installations in the pump stations • Lifting equipment when relevant • Function testing, commissioning and documentation For Brevik pump station, the procurement applies to the new system. The contract includes renovation, including removal, disassembly and demolition of the existing machine technical equipment, as well as the delivery and installation of a new system for Møllebakken pump station.Supply, Commissioning and Maintenance of drive systems for electrical submersible pumps – Wippolderlaan and Alton
N.V. HVCAlkmaarDeadline: Aug 31The purpose of this tender procedure is to select one supplier regarding the supply, commissioning and maintenance of drive systems of electrical submersible pumps for the projects Wippolderlaan and Alton.Tipperary County Council - PROCUREMENT OF ARCHITECT LED MULTI-DISCIPLINARY CONSULTANCY SERVICE
Tipperary County CouncilClonmel, NenaghProcurement Of Architect Led Multi-Disciplinary Consultancy Service Conservation And Refurbishment Of The Old Guard House In Kickham Barracks, Clonmel Tipperary County Council wish to appoint a multi-disciplinary design team to develop the design and execution of the conservation, refurbishment and adaptive re-use of building B an old Guardhouse with a proposed re-use as a Café. The successful consultant will be required to complete the following project phases as outlined in Capital Works Management Framework (CWMF): • CWMF Stage ii : Detailed Design • CWMF Stage iii : Tender Process • CWMF Stage iv : Construction • CWMF Stage v : Handover The services are required for the following protected building: Guard house - Proposed Cafe
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 10. September 2026.
- Who is the contracting authority?
- The contracting authority is BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.