CWS Circulating Water Pumps (Concrete Volute)

The scope of work for this package consists of design, furnish material, fabricate, test, and deliver (9) vertical concrete volute pumps (based on U.S. and European Materials, Codes and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP100 Project. The Circulating Water Concrete Volute Pump, pumps brack...

Submission deadline: August 19, 2026 (expired)Type: Tender

Pumps, Measurement Technology, Process Technology

Unlock documents for free

No credit card · Instant access

Content at a glance

Tender type:
Tender
Contracting authority:
BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ
Published:
July 19, 2026
Deadline:
August 19, 2026
Topic:
Pumps

Tender description

Show full description

The scope of work for this package consists of design, furnish material, fabricate, test, and deliver (9) vertical concrete volute pumps (based on U.S. and European Materials, Codes and Standards) for each of the three nuclear power plants (NPPs) planned for the Poland AP100 Project. The Circulating Water Concrete Volute Pump, pumps brackish Baltic Sea water to remove heat from the main condensers in a once through cooling system configuration. There are 9 total concrete volute pumps for the project site (3 x 33% per unit) with a rated flow of 21.3 m3/s (76,668 m3/hr), pump head of 22.5m, and design life of 60 years. There shall be physical model testing and shop performance testing on the pump. NOTE: The estimates provided above are APPROXIMATE only. The intent is to give bidders an idea of the scale of the project. Deadline (Pre-qualification Submittal): September 2026 (Forecast – Subject to change) RFQ Document Issuance: November 2026 (Forecast – Subject to change) Supplier Proposals Due: January 2027 (Forecast – Subject to change) Order Award Date: April 2027 (Forecast – Subject to change) * After completion of the design submittals, the company is placed on hold until release for fabrication. The timing of the release is based on required fabrication and delivery lead times. Required Onsite Date: Unit 1: June 2032 (Forecast – Subject to change) Unit 2 & 3 will be further detailed in the RFQ package.

Further details

With free access, documents, deadlines and submission notes are available in a structured format.

  • Core requirements of the tender prioritized and prepared
  • Deadlines, eligibility criteria and documents in one workflow
  • Guidance for structured bid preparation
  • Automatically discover matching follow-up tenders
Unlock 30 days free

30 days free · no credit card · cancel anytime

All procurement details

Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.

6 data areas available

Unlock 30 days free

30 days free · no credit card · cancel anytime

Related tenders

No direct alternatives are currently listed. Activate search to automatically receive new matching notices.

Unlock advanced search

Frequently asked questions about this tender

How can I apply for this tender?
Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
What is the submission deadline?
The submission deadline is 19. August 2026.
Who is the contracting authority?
The contracting authority is BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ.
Which documents are needed to get started?
Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.
1,200+ companies10,000+ active tendersGDPR-compliant platform

Next step

Get full access to this tender

Access all documents for "CWS Circulating Water Pumps (Concrete Volute)" from BECHTEL POLSKA SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ and keep track of deadlines and submission guidelines.

Deadline tracked until August 19, 2026No credit card required