Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
Entwicklung von Aktionsplänen und einer Strategie für Fuß- und Radverkehr in der Dakar Metropolregion
The contractor will research and collect data on walking and cycling in the Dakar Metropolitan Region, assess current conditions and identify challenges. Based on this analysis, separate but coordinated Walking and Cycling Strategies will be developed iteratively with stakeholder consultation. Additionally, five Action Plans will be prepa...
Urban Planning, Civil Engineering Design, Traffic Planning
No credit card · Instant access
Content at a glance
The contractor will research and collect data on walking and cycling in the Dakar Metropolitan Region, assess current conditions and identify challenges. Based on this analysis, separate but coordinated Walking and Cycling Strategies will be developed iteratively with stakeholder consultation. Additionally, five Action Plans will be pr...
- Tender type:
- Tender
- Contracting authority:
- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
- Published:
- June 11, 2026
- Deadline:
- Not specified
- Topic:
- Urban Planning
Tender description
The contractor will research and collect data on walking and cycling in the Dakar Metropolitan Region, assess current conditions and identify challenges. Based on this analysis, separate but coordinated Walking and Cycling Strategies will be developed iteratively with stakeholder consultation. Additionally, five Action Plans will be prepared covering access to public transport, safe school zones, gender, road safety and parking management.
Further details
After registration, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
Documents and attachments
1 file recorded- Hinweis auf Bekanntmachungsorte.pdf
Related tenders
10- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
81320926-Development of Action Plans and a Walking and Cycling Strategy for the Dakar Metropolitan Region
The present tender will contribute to Output 1 of the project MoVe Senegal. Within this output a Steering Committee for Active Mobility will be supported, a strategy for walking and cycling will be prepared and action plans for the improvement of active mobility in the Dakar Metropolitan Region will be developed. The contractor is expected to conduct background research and collect data on Walking and Cycling in the Dakar Metropolitan Region to assess the current state of cycling & walking in Dakar and identify key challenges and opportunities. Based on a status quo analysis the contractor will develop a Walking and a Cycling Strategy for the Dakar Metropolitan Region. Both strategies shall be developed in an iterative process based on stakeholder consultation. The Walking and the Cycling Strategy are foreseen as separate strategies and actions for cycling and walking as they require different approaches and infrastructure. Nevertheless, the strategies shall be consistent and developed in a coordinated manner. Finally, the contractor will prepare 5 Action Plans to improve active mobility in the Dakar Metropolitan region. The action plans shall tentatively cover the topics of Access to public transport, Safe school zones, Gender Action Plan for Active Mobility, Road Safety Action Plan and Parking Management. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
81320926-Development of Action Plans and a Walking and Cycling Strategy for the Dakar Metropolitan Region
The present tender will contribute to Output 1 of the project MoVe Senegal. Within this output a Steering Committee for Active Mobility will be supported, a strategy for walking and cycling will be prepared and action plans for the improvement of active mobility in the Dakar Metropolitan Region will be developed. The contractor is expected to conduct background research and collect data on Walking and Cycling in the Dakar Metropolitan Region to assess the current state of cycling & walking in Dakar and identify key challenges and opportunities. Based on a status quo analysis the contractor will develop a Walking and a Cycling Strategy for the Dakar Metropolitan Region. Both strategies shall be developed in an iterative process based on stakeholder consultation. The Walking and the Cycling Strategy are foreseen as separate strategies and actions for cycling and walking as they require different approaches and infrastructure. Nevertheless, the strategies shall be consistent and developed in a coordinated manner. Finally, the contractor will prepare 5 Action Plans to improve active mobility in the Dakar Metropolitan region. The action plans shall tentatively cover the topics of Access to public transport, Safe school zones, Gender Action Plan for Active Mobility, Road Safety Action Plan and Parking Management. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 21
Development of a green corridor project and street design training in Dakar
Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes). - Conduct preliminary Environmental and Social Impact Assessment and cultural/heritage screening; Cost-Benefit Analysis incl. climate benefits; risk assessment (strategic/project risks); outline financing options and sources. - Prepare implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck. - Prepare an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted). - Deliverables: D3.1 Alternatives & conceptual designs; D3.2 Preliminary Impact Assessment; D3.3 CBA; D3.4 Risk Assessment; D3.5 PFS; D3.6 Pitch deck; D3.7 Implementation Strategy; D3.8 Communication Strategy; D3.9 Action Plan. WP4 Training conceptualisation and implementation - Design and deliver a 120-hour training (?3 seminars x 3 days + self-learning) on: sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integrate co-creative work on Green Corridor elements. - Train-the-trainer: coach 5 staff (CETUD/local authorities) to replicate training; refine materials after pilot. - Develop replicable materials: presentations, scripts, videos (?240 min), templates (surveys, fieldwork), instructor"s manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned. - Deliverables: D4.1 Training concept; D4.2 Training materials; D4.3 Instructor"s manual; D4.4 Implementation plan & guidance; D4.5 Training report. Governance and cooperation - Work in close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; align with the RTC project context and ongoing bus station redevelopment. - Provide brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days). - Contribute to knowledge sharing (events, publications) and support evaluation of knowledge management effectiveness. Reporting and languages - Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified. Indicative duration and milestones (from contract start) - WP1: D1.1 at 1 month; D1.2-1.4 at 3 months. - WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months. - WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals 12 months; Action Plan draft 10 months, final 12 months. - WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor"s manual 6/8 months; Implementation plan 8/9 months; Training report 12 months. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 21
Development of a green corridor project and street design training in Dakar
Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes). - Conduct preliminary Environmental and Social Impact Assessment and cultural/heritage screening; Cost-Benefit Analysis incl. climate benefits; risk assessment (strategic/project risks); outline financing options and sources. - Prepare implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck. - Prepare an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted). - Deliverables: D3.1 Alternatives & conceptual designs; D3.2 Preliminary Impact Assessment; D3.3 CBA; D3.4 Risk Assessment; D3.5 PFS; D3.6 Pitch deck; D3.7 Implementation Strategy; D3.8 Communication Strategy; D3.9 Action Plan. WP4 Training conceptualisation and implementation - Design and deliver a 120-hour training (?3 seminars x 3 days + self-learning) on: sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integrate co-creative work on Green Corridor elements. - Train-the-trainer: coach 5 staff (CETUD/local authorities) to replicate training; refine materials after pilot. - Develop replicable materials: presentations, scripts, videos (?240 min), templates (surveys, fieldwork), instructor"s manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned. - Deliverables: D4.1 Training concept; D4.2 Training materials; D4.3 Instructor"s manual; D4.4 Implementation plan & guidance; D4.5 Training report. Governance and cooperation - Work in close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; align with the RTC project context and ongoing bus station redevelopment. - Provide brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days). - Contribute to knowledge sharing (events, publications) and support evaluation of knowledge management effectiveness. Reporting and languages - Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified. Indicative duration and milestones (from contract start) - WP1: D1.1 at 1 month; D1.2-1.4 at 3 months. - WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months. - WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals 12 months; Action Plan draft 10 months, final 12 months. - WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor"s manual 6/8 months; Implementation plan 8/9 months; Training report 12 months. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 21
Development of a green corridor project and street design training in Dakar
Prepare a pre-feasibility study for a Green Corridor to improve safe pedestrian access to public transport in Keur Massar and strengthen institutional capacities for climate-resilient, inclusive street design and participatory project development in Dakar. WP1 Baseline study - Review existing data and studies; identify gaps; conduct additional data collection (e.g. traffic counts, user surveys, air quality and environmental measurements). - Analyse urban context and land use; travel demand (quantitative and qualitative); supply quality and capacity for all modes; safety and conflicts; environmental quality; climate stress (heat, flooding); gender and social inclusion; institutional and legal framework; state-of-the-art references (incl. regional examples). - Deliverables: D1.1 Methodological orientation (inception) report; D1.2 Baseline report; D1.3 Slide deck; D1.4 Provision of raw, machine-readable and editable data and media. WP2 Participation process - Map stakeholders (incl. vulnerable groups, women, persons with disabilities, street vendors, informal transport, neighbourhood groups, local and national authorities). - Design and implement an inclusive, gender-responsive participation strategy (incl. at least one virtual measure); facilitate workshops, mediation as needed; document and evaluate results. - Deliverables: D2.1 Stakeholder analysis (report); D2.2 Slides; D2.3 Participation Strategy; D2.4 Facilitation materials/templates (editable); D2.5 Results report with inputs for corridor requirements; D2.6 Reference Toolkit for participatory processes (FR/EN) to enable replication. WP3 Pre-feasibility Study (PFS) Green Corridor - Identify and appraise design/traffic management alternatives; SWOT; recommend preferred alternative in consultation with CETUD and local administrations. - Produce ?15 preliminary and 10 final conceptual designs (street sections/intersections, allocation of road space, speeds, traffic regulation, green infrastructure, lighting/shading, materials, signage; capacity for all modes). - Conduct preliminary Environmental and Social Impact Assessment and cultural/heritage screening; Cost-Benefit Analysis incl. climate benefits; risk assessment (strategic/project risks); outline financing options and sources. - Prepare implementation strategy (phasing, data/engineering needs, roles/responsibilities, maintenance concept, financing structure), communication strategy (public and stakeholder messaging, best practice), investor pitch deck. - Prepare an Action Plan on Secure Bus Stops aligned with metropolitan frameworks (topic may be adjusted). - Deliverables: D3.1 Alternatives & conceptual designs; D3.2 Preliminary Impact Assessment; D3.3 CBA; D3.4 Risk Assessment; D3.5 PFS; D3.6 Pitch deck; D3.7 Implementation Strategy; D3.8 Communication Strategy; D3.9 Action Plan. WP4 Training conceptualisation and implementation - Design and deliver a 120-hour training (?3 seminars x 3 days + self-learning) on: sustainable mobility and street design, public space management and climate resilience, project development from concept to operation; integrate co-creative work on Green Corridor elements. - Train-the-trainer: coach 5 staff (CETUD/local authorities) to replicate training; refine materials after pilot. - Develop replicable materials: presentations, scripts, videos (?240 min), templates (surveys, fieldwork), instructor"s manual, implementation plan and guidance (checklists, certificate templates), evaluation tools; final training report with lessons learned. - Deliverables: D4.1 Training concept; D4.2 Training materials; D4.3 Instructor"s manual; D4.4 Implementation plan & guidance; D4.5 Training report. Governance and cooperation - Work in close coordination with CETUD, MiTTA and a Technical Committee established by CETUD; align with the RTC project context and ongoing bus station redevelopment. - Provide brief monthly status reports (2 pages) in French (activities, outputs in progress, impacts, decisions needed, expert days). - Contribute to knowledge sharing (events, publications) and support evaluation of knowledge management effectiveness. Reporting and languages - Main deliverables in French; the participation toolkit in FR/EN; raw data and media in editable, machine-readable formats as specified. Indicative duration and milestones (from contract start) - WP1: D1.1 at 1 month; D1.2-1.4 at 3 months. - WP2: D2.1-2.2 at 2 months; D2.3 at 4 months; D2.4 at 6 months; D2.5 at 10 months; D2.6 at 11 months. - WP3: Designs drafts at 3/8 months, final at 12 months; Impact/CBA/Risk drafts 6-10 months, finals at 12 months; PFS draft 9 months, final 12 months; Pitch/Implementation/Communication drafts 10 months, finals 12 months; Action Plan draft 10 months, final 12 months. - WP4: Concept draft/final 4/6 months; Materials 6/7 months; Instructor"s manual 6/8 months; Implementation plan 8/9 months; Training report 12 months. - Oslo kommune v/ BymiljøetatenOsloDeadline: Aug 15
Market survey for the publication of a licence period for renting small electric vehicles on public ground in Oslo municipality.
The Agency for Urban Environment would like to invite market participants who rent "free flow" shared electric bicycles and electric scooters to a market survey. The aim of the invitation is to gain general insight about the interest and the possibility the market has to offer electric bicycles in combination with electric scooters to ensure that the criteria in the next notice are in line with what the market can offer and the city wants. We would particularly like concrete feedback on free floating e-cycles that are not offered in Oslo in the current period. Currently Oslo offers two different offers of micromobility; the permission scheme for small electric vehicles (electric scooters and electric bicycles) and a separate contract with Oslo bysykkel. The licence scheme is a free flow scheme with 2 years duration and is open for companies with permission to have both electric bikes and electric scooters. In the current period, only electric scooters are offered from the companies that have permission in Oslo. Oslo Bysykkel offers fixed installations of electric bicycles and regular bicycles within ring 3 and is a contract that lasts until 2030. The current permit for small electric vehicles allows companies to place a total of 16,000 vehicles that are distributed equally between three companies. There are 5,334 vehicles for each company. The distribution of vehicles will be distributed in 4 zones that are regulated in the local regulations. In zones 1, 2 and 3, the companies have the possibility to deploy 8,000 vehicles (inner town), the remaining 8,000 can be placed in zone 4 (outer town). Of the 8,000 vehicles that can be placed within zone 3, there is a maximum of 3,200 vehicles in zone 3, 3,200 vehicles in zone 2, and 1,200 vehicles in zone 1. In 2025, more than 20 million trips were carried out, and a further increase is expected by the end of 2026. On average, the trips last with electric scooters in Oslo about 7 minutes, which makes up a distance of about 2 kilometres in the airline. The Agency for Urban Environment would like the tender to be developed in a safe and good way with the city ́s needs and that as many people as possible use the offer in the city. We would therefore like the market to give feedback on the following questions: 1. There should be some concrete changes in the design of questions from the previous notice period 2025-27 (see the annex). 2. Should the next notice also include electric bicycles and which segments can electric bicycles attract that do not electric scooters hit? 3. Previous experience gave electric bikes challenges in the urban area. Are the current e-cycles offered by the market small enough and adapted to confined urban spaces? 4. What does the market think about requirements for the size and length of the bicycles (wheel size in inches, length in cm)? 5. If a limit shall be set on the size of the e-cycles. What is the smallest size of e-cycles in the market and what size is recommended in Oslo? 6. Should there be a minimum and maximum number of e-cycles and how should it be distributed in the zones? 7. Fees have been preventive in order to avoid repeated parking errors. The municipality has no way of doing the same with electric bikes. How do companies solve the parking challenges that arise with electric bikes? 8. What is the market ́s attitude in general to forced parking in the city centre and forced parking only for electric bikes in other local centres and areas with high use? 9. What type of new technology can the market offer that contributes to safer urban transport with many walking, especially on pavements, parks, public urban areas etc.? Give examples. 10. Do you have anything else you would like to comment on or give feedback on? The Agency for Urban Environment reserves the right to select feedback and the right to not take into account input that is not relevant for the pending announcement. This is done in order to avoid disproportionate work with the received inputs. The Agency for Urban Environment selects relevant input from the feedback based on capacity, need, wants and professional assessment. Due to staff holidays, questions asked from interested parties will not be answered until after 3 August. A deadline is set for 18 August to ask questions to the market dialogue, and questions received after this cannot be answered. The deadline for submitting feedback and replying to the questions posed in the market dialogue is set at 25 August. A summary of the received input will be prepared. Input that the Agency for Urban Environment does not consider relevant for the pending announcement will not be included in the summary. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
81322153-Leadership for Health system strengthening
The contract is expected to run from signing (in 2026) to November 2028, covering three full leadership cycles. The contractor is responsible for achieving the following contract objectives and indicators: - Lead the organization (event and travel logistics, administration) and deliver 3 leadership cycles. Adapt the technical didactic content of the Leadership for UHC program (l4uhc.world) to the scope of the GP BACKUP Health (geared towards financing reforms and integration of ATM into national systems). Provide all necessary experts to coordinate, manage, facilitate, and administer the consultancy project. - Be accountable to the GP BACKUP team and report progress on a bi-monthly basis. - Be responsible for documenting and reporting project progress and achievements. - Coordinate with all involved parties including any GIZ identified collaborators (e.g., GFATM, WHO, WB etc.) which may co-develop technical content and contribute technical resource persons. Key Indicators of success will be monitored by the contracting party and include the: - Completion of 3 leadership cycles by September 2028. - Strengthened leadership capacities in relation to health financing reform in 90 senior decision-makers across 9 countries. - Formulation of 9 design options (CIAs) for the integration of HIV/TB/Malaria services into national systems by participating countries. - Production of 6 legislative, strategic, or planning documents by participating countries. The service package will comprise six major work packages divided as follows: - A Preparation Phase Work Package 1 for the Operational Set-Up of the project (steering, personnel, logistics, admin) in organizational and operative functions. - Work Package 2 focused on Didactic Adaptation of the L4UHC Curriculum to BACKUP Health Scope to focus on the integration of (ATM) financing and services into national health systems. - The implementation phase Work Package 3 which deals with the core implementation of the leadership programme from organization, administration to delivery of all components of the programme for the benefit of 9 countries. - Work Package 4 is all about event management to plan, organize, and manage all logistical, financial, and administrative aspects of the program. - Monitoring, Evaluation, and Reporting is embedded in Work Package 5 with the objective to design and implement the M&E framework, documenting stories of change and early results. Final Work Package 6 is ensuring the communication needs of the Leadership Program are met with clear communication to raise visibility, engage stakeholders, and support alignment around the leadership program. The contractor is responsible for selecting, preparing, training and steering the experts assigned to carry out the different services. The contractor manages costs and expenditures, accounting processes and invoicing in line with GIZ requirements and will be responsible for contributing to Outcome and Output Indicator 1.1 of the GP BACKUP Health. Thereby ensuring 9 national design options for the sustainable financing of integrated ATM-related services are developed out of which 6 result in national legislative, strategic or planning documents by December 2028. The contractor plays an active role in the results-based monitoring of the project and provides to GIZ as follows in English language: - One inception report - Protocols at the end of each module and practical phase (total of 9) - One Final synthesis report by November 2028 including Stories of Change and Case Studies per country Additionally, the contractor is required to produce: - Contributions to the report to GIZ"s commissioning party and - Brief quarterly written up-dates on the implementation status of the project (up to 5 pages) In terms of contributions to company-wide learning, knowledge and innovation the contractor provides support in implementing a project evaluation with special emphasis on ensuring the effectiveness of the knowledge management process. The contractor has to align to GIZ"s General Terms and Conditions for supplying services on behalf of GIZ. The provisions on data protection and information security of the current version of GIZ"s General Terms and Conditions of Contract (section 1.10 Data protection) will apply. Safeguards and gender measures will also be important provisions with importance placed on aspect of - Gender equality: Integrate gender analysis and sex-disaggregated data into planning, monitoring, and reporting. - Ensuring equal participation and leadership opportunities for women and men in all activities, trainings, and decision-making processes. - Applying gender-sensitive communication and facilitation methods. - Environmental protection and climate action (climate change mitigation/adaptation): - Apply environmentally sustainable practices during all project activities and events. - Promoting resource efficiency (energy, water, materials) and low-carbon travel or logistics options. - Avoiding negative environmental impacts and document positive contributions where possible. - Conflict and context sensitivity that require conducting regular context assessments to identify potential sources of tension or conflict. - Ensuring that interventions "do no harm" and are inclusive of diverse stakeholder groups. - Maintaining transparent communication and feedback mechanisms with partners and participants. - Adapting implementation strategies to evolving local contexts and sensitivities. - Attention to human rights aspects by respecting and promoting internationally recognized human rights principles in all activities. Safeguarding the dignity, safety, and confidentiality of participants and partners. Ensure non-discrimination based on gender, age, disability, ethnicity, religion, or other status. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHN/A
81322153-Leadership for Health system strengthening
The contract is expected to run from signing (in 2026) to November 2028, covering three full leadership cycles. The contractor is responsible for achieving the following contract objectives and indicators: - Lead the organization (event and travel logistics, administration) and deliver 3 leadership cycles. Adapt the technical didactic content of the Leadership for UHC program (l4uhc.world) to the scope of the GP BACKUP Health (geared towards financing reforms and integration of ATM into national systems). Provide all necessary experts to coordinate, manage, facilitate, and administer the consultancy project. - Be accountable to the GP BACKUP team and report progress on a bi-monthly basis. - Be responsible for documenting and reporting project progress and achievements. - Coordinate with all involved parties including any GIZ identified collaborators (e.g., GFATM, WHO, WB etc.) which may co-develop technical content and contribute technical resource persons. Key Indicators of success will be monitored by the contracting party and include the: - Completion of 3 leadership cycles by September 2028. - Strengthened leadership capacities in relation to health financing reform in 90 senior decision-makers across 9 countries. - Formulation of 9 design options (CIAs) for the integration of HIV/TB/Malaria services into national systems by participating countries. - Production of 6 legislative, strategic, or planning documents by participating countries. The service package will comprise six major work packages divided as follows: - A Preparation Phase Work Package 1 for the Operational Set-Up of the project (steering, personnel, logistics, admin) in organizational and operative functions. - Work Package 2 focused on Didactic Adaptation of the L4UHC Curriculum to BACKUP Health Scope to focus on the integration of (ATM) financing and services into national health systems. - The implementation phase Work Package 3 which deals with the core implementation of the leadership programme from organization, administration to delivery of all components of the programme for the benefit of 9 countries. - Work Package 4 is all about event management to plan, organize, and manage all logistical, financial, and administrative aspects of the program. - Monitoring, Evaluation, and Reporting is embedded in Work Package 5 with the objective to design and implement the M&E framework, documenting stories of change and early results. Final Work Package 6 is ensuring the communication needs of the Leadership Program are met with clear communication to raise visibility, engage stakeholders, and support alignment around the leadership program. The contractor is responsible for selecting, preparing, training and steering the experts assigned to carry out the different services. The contractor manages costs and expenditures, accounting processes and invoicing in line with GIZ requirements and will be responsible for contributing to Outcome and Output Indicator 1.1 of the GP BACKUP Health. Thereby ensuring 9 national design options for the sustainable financing of integrated ATM-related services are developed out of which 6 result in national legislative, strategic or planning documents by December 2028. The contractor plays an active role in the results-based monitoring of the project and provides to GIZ as follows in English language: - One inception report - Protocols at the end of each module and practical phase (total of 9) - One Final synthesis report by November 2028 including Stories of Change and Case Studies per country Additionally, the contractor is required to produce: - Contributions to the report to GIZ"s commissioning party and - Brief quarterly written up-dates on the implementation status of the project (up to 5 pages) In terms of contributions to company-wide learning, knowledge and innovation the contractor provides support in implementing a project evaluation with special emphasis on ensuring the effectiveness of the knowledge management process. The contractor has to align to GIZ"s General Terms and Conditions for supplying services on behalf of GIZ. The provisions on data protection and information security of the current version of GIZ"s General Terms and Conditions of Contract (section 1.10 Data protection) will apply. Safeguards and gender measures will also be important provisions with importance placed on aspect of - Gender equality: Integrate gender analysis and sex-disaggregated data into planning, monitoring, and reporting. - Ensuring equal participation and leadership opportunities for women and men in all activities, trainings, and decision-making processes. - Applying gender-sensitive communication and facilitation methods. - Environmental protection and climate action (climate change mitigation/adaptation): - Apply environmentally sustainable practices during all project activities and events. - Promoting resource efficiency (energy, water, materials) and low-carbon travel or logistics options. - Avoiding negative environmental impacts and document positive contributions where possible. - Conflict and context sensitivity that require conducting regular context assessments to identify potential sources of tension or conflict. - Ensuring that interventions "do no harm" and are inclusive of diverse stakeholder groups. - Maintaining transparent communication and feedback mechanisms with partners and participants. - Adapting implementation strategies to evolving local contexts and sensitivities. - Attention to human rights aspects by respecting and promoting internationally recognized human rights principles in all activities. Safeguarding the dignity, safety, and confidentiality of participants and partners. Ensure non-discrimination based on gender, age, disability, ethnicity, religion, or other status. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 21
10004007 1-Provision of Technical Expert Support on Climate Change Adaptation and Climate Finance in Central and West Africa
In this work package, the contractor in collaboration with the African Development Bank will identify and work with project applicants from the pool of projects generated by the national climate funds, financed by GIZ. The contractor and AfDB will identify small-scale high-impact highly replicable climate change adaptation demonstration projects, that are suitable for AfDB"s Adaptation Benefits Mechanism (ABM), seeking to mobilize higher amounts of funding than available through the PACO small grants from Output 3. The specific objective is to establish and implement four new and fully validated ABM-Projects, developed according to the ABM Activity Cycle, that will catalyse up to four million Euro of public or private money via the issuance of Certified Adaptation Benefits (CAB). The basis for the four ABM Projects to develop are the identified projects from Output 3 suitable for an ABM Activity. To obtain the CABs, issued by the AfDB and the goal of the activity, the contractor must in collaboration with AfDB, guide the ABM Activity Participants during the ABM Activity Cycle. Both the small-scale adaptation project, implemented by the project developer under Output 3 and financed by GIZ (responsibility of GIZ), and the demonstration of the ABM must be fully implemented within the project duration (responsibility of the contractor). The contractor will be responsible for undertaking all activities necessary to establish and demonstrate four ABM Activities, in Benin, Ivory Coast, Senegal and Republic of Congo, which will lead to the issuance of Certified Adaptation Benefits by the African Development Bank. The contractor accordingly will deliver advisory services, technical and process-related assistance, deliver basic studies, and develop ABM Methodologies during the ABM Activity Cycle to the four identified ABM Participants. The African Development Bank will provide guidance and advise on the ABM components. Promote and catalyse adaptation financing in Benin, Côte d'Ivoire, and Senegal This work package outlines the activities required to develop a pipeline of climate change adaptation projects using the IsDB's financial instruments in Benin, Côte d'Ivoire and Senegal in cooperation with relevant national stakeholders to leverage through catalysation additional adaptation finance (up to 50 Mio. EUR from public and private investors). The objective is (1) to build a strong pipeline of IsDB projects in the three countries that are adapted and/or with a main objective of addressing adaptation challenges in relevant sectors, building from PACO small grant projects (Output 3), and NAP/NDC investment plans developed or revised under Output 1, and (2) to facilitate capacity building to strengthen the institutional capacity of financial institutions. The contractor will be responsible, in coordination with IsDB and GIZ, for deploying a series of country-level consultation workshops to firm up and engage with relevant public and private actors for the strengthening of IsDB project pipelines in Benin, Ivory Coast and Senegal with high adaptation finance potential. In addition, the contractor will prepare and implement relevant studies, including gender, socio-economic and environmental analyses supporting the economic case for IsDB intervention in sectors relevant to the countries" NAPs and adaptation-related NDCs or based on existing NAP/NDC investment plans. Establishment of four Reverse Linkages and one centre of excellence in collaboration with IsDB This work package focuses on the establishment of four Reverse Linkages in the PACO program with four different host-institutions. Reverse linkages are a mechanism developed by the Islamic Development Bank to establish partnerships between institutions in countries in the global South. In each partnership an institution with proven knowledge, expertise, technology, and resources is the provider of knowledge; the recipient of knowledge can be a public, private, or third-sector organization. The institutions involved must be IsDB members; this limits PACO participation to Benin, Ivory Coast and Senegal, and to the CCRS , since the Republic of Congo is not a member of the IsDB. The contractor will support IsDB to conduct a stakeholder assessment in each of the three member countries to identify interest and needs among institutions in the three target countries in being the recipient organization in a reverse linkage relationship. Where this offers a good opportunity, the contractor will, with help and consent of the IsDB, identify knowledge-providing institutions (the "Resources-Centre") to work with the concerned institutions and will facilitate planning and establishing the partnerships. The resulting partnerships may offer a range of services to recipient countries, including training, coaching, advisory services, technology transfer, demo sites, and others. Once set up, the partnerships usually last for a period of three years, so the process will be carried out during the life of the PACO project. Furthermore, the contractor will help IsDB to identify and set up regional or national Centres of Excellence (institutions highly specialized and leading in technology, finance, etc.) to potentially host more Reverse Linkages and to facilitate the flow of information. The contractor will accordingly assess the capacity needs of the target countries, identify the centres of excellence, accomplish the installation of four Reverse Linkages and implement capacity development plans with the support of IsDB. If appropriate, the IsDB will establish a reverse linkage between CCRS and a centre of excellence in another IsDB member country, to help build Commission capacity. This possibility will be considered by the Commission and the Bank during the inception phase of the PACO project. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornDeadline: Aug 21
10004007 1-Provision of Technical Expert Support on Climate Change Adaptation and Climate Finance in Central and West Africa
In this work package, the contractor in collaboration with the African Development Bank will identify and work with project applicants from the pool of projects generated by the national climate funds, financed by GIZ. The contractor and AfDB will identify small-scale high-impact highly replicable climate change adaptation demonstration projects, that are suitable for AfDB"s Adaptation Benefits Mechanism (ABM), seeking to mobilize higher amounts of funding than available through the PACO small grants from Output 3. The specific objective is to establish and implement four new and fully validated ABM-Projects, developed according to the ABM Activity Cycle, that will catalyse up to four million Euro of public or private money via the issuance of Certified Adaptation Benefits (CAB). The basis for the four ABM Projects to develop are the identified projects from Output 3 suitable for an ABM Activity. To obtain the CABs, issued by the AfDB and the goal of the activity, the contractor must in collaboration with AfDB, guide the ABM Activity Participants during the ABM Activity Cycle. Both the small-scale adaptation project, implemented by the project developer under Output 3 and financed by GIZ (responsibility of GIZ), and the demonstration of the ABM must be fully implemented within the project duration (responsibility of the contractor). The contractor will be responsible for undertaking all activities necessary to establish and demonstrate four ABM Activities, in Benin, Ivory Coast, Senegal and Republic of Congo, which will lead to the issuance of Certified Adaptation Benefits by the African Development Bank. The contractor accordingly will deliver advisory services, technical and process-related assistance, deliver basic studies, and develop ABM Methodologies during the ABM Activity Cycle to the four identified ABM Participants. The African Development Bank will provide guidance and advise on the ABM components. Promote and catalyse adaptation financing in Benin, Côte d'Ivoire, and Senegal This work package outlines the activities required to develop a pipeline of climate change adaptation projects using the IsDB's financial instruments in Benin, Côte d'Ivoire and Senegal in cooperation with relevant national stakeholders to leverage through catalysation additional adaptation finance (up to 50 Mio. EUR from public and private investors). The objective is (1) to build a strong pipeline of IsDB projects in the three countries that are adapted and/or with a main objective of addressing adaptation challenges in relevant sectors, building from PACO small grant projects (Output 3), and NAP/NDC investment plans developed or revised under Output 1, and (2) to facilitate capacity building to strengthen the institutional capacity of financial institutions. The contractor will be responsible, in coordination with IsDB and GIZ, for deploying a series of country-level consultation workshops to firm up and engage with relevant public and private actors for the strengthening of IsDB project pipelines in Benin, Ivory Coast and Senegal with high adaptation finance potential. In addition, the contractor will prepare and implement relevant studies, including gender, socio-economic and environmental analyses supporting the economic case for IsDB intervention in sectors relevant to the countries" NAPs and adaptation-related NDCs or based on existing NAP/NDC investment plans. Establishment of four Reverse Linkages and one centre of excellence in collaboration with IsDB This work package focuses on the establishment of four Reverse Linkages in the PACO program with four different host-institutions. Reverse linkages are a mechanism developed by the Islamic Development Bank to establish partnerships between institutions in countries in the global South. In each partnership an institution with proven knowledge, expertise, technology, and resources is the provider of knowledge; the recipient of knowledge can be a public, private, or third-sector organization. The institutions involved must be IsDB members; this limits PACO participation to Benin, Ivory Coast and Senegal, and to the CCRS , since the Republic of Congo is not a member of the IsDB. The contractor will support IsDB to conduct a stakeholder assessment in each of the three member countries to identify interest and needs among institutions in the three target countries in being the recipient organization in a reverse linkage relationship. Where this offers a good opportunity, the contractor will, with help and consent of the IsDB, identify knowledge-providing institutions (the "Resources-Centre") to work with the concerned institutions and will facilitate planning and establishing the partnerships. The resulting partnerships may offer a range of services to recipient countries, including training, coaching, advisory services, technology transfer, demo sites, and others. Once set up, the partnerships usually last for a period of three years, so the process will be carried out during the life of the PACO project. Furthermore, the contractor will help IsDB to identify and set up regional or national Centres of Excellence (institutions highly specialized and leading in technology, finance, etc.) to potentially host more Reverse Linkages and to facilitate the flow of information. The contractor will accordingly assess the capacity needs of the target countries, identify the centres of excellence, accomplish the installation of four Reverse Linkages and implement capacity development plans with the support of IsDB. If appropriate, the IsDB will establish a reverse linkage between CCRS and a centre of excellence in another IsDB member country, to help build Commission capacity. This possibility will be considered by the Commission and the Bank during the inception phase of the PACO project.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.