Killocrim N.S.
View CfT Workspace
The project involves the diversion of existing foul drains 1km away to the nearest Irish Water Connection point by means of a pumping station and rising main, diversion of the storm drains to a new attenuation installation, upgrade of in situ electrical installation to accommodate pumping station and all other ancillary works.
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Killocrim N.S.
- Veröffentlicht:
- 19. August 2026
- Frist:
- 19. August 2026
Ausschreibungsbeschreibung
The project involves the diversion of existing foul drains 1km away to the nearest Irish Water Connection point by means of a pumping station and rising main, diversion of the storm drains to a new attenuation installation, upgrade of in situ electrical installation to accommodate pumping station and all other ancillary works.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
3 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Ähnliche Bekanntmachungen
3View CfT Workspace
Limerick City and County Council_103432Frist: 12. Aug.This project consists of the part demolition and re construction, to include rear extension at first floor level ,a mixed living unit (note impacts on electrical and mechanical design) of 2 number residential apartment units. This development consists of demolition of existing roof of rear extension, construction of first floor above. Demolition of chimney and existing floor slab. The construction of first floor extension and completion of the existing envelope to current regulations, including the achievement of the Building to a BER of A2 or greater. In addition to this, ancillary site works comprising of connection of electrical services, footpaths, parking, boundary treatment and landscape works are proposedView CfT Workspace
Mayo County Council_1127Frist: 19. Aug.The project involves installation of 2287m of 110mm OD PE100 SDR17 main to connect Curramore (Ballinrobe) Group Water Scheme to Uisce Éireann,2020m of distribution pipe 63mm OD PE80 SDR11 main to replace the existing pipes, including the installation of new valves, fittings, 4 new bulk meters and 45 connections to new and existing pipes. Installation of valves and fittings on the existing Curramore (Ballinrobe) Group Water Scheme network.HCS 0319 - Construction of 30no. social housing units and all associated site development works at Cois Abhainn (Phase 3), St. Johnston, Co. Donegal
Donegal County Council_1193LiffordThe works comprise of the construction of 30no. two storey social housing units consisting of 4no. 1 bedroom apartments, 4no. 2 bedroom apartments, 8no. 2 bedroom houses, 12no. 3 bedroom houses, 2no. 4 bedroom houses. The associated site works and services consist of the following non exhaustive list: site clearance and excavation works, ESB diversions, new access roads, resurfacing of existing roads, retaining walls, footpaths, on site surface water attenuation, underground static water storage tanks, carparking, construction of new foul and surface water connections to include upgrade of existing foul wastewater pumping station with a new rising main and installation of watermain booster pump.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 19. August 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Killocrim N.S..
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.