Limerick City and County Council_103432
View CfT Workspace
This project consists of the part demolition and re construction, to include rear extension at first floor level ,a mixed living unit (note impacts on electrical and mechanical design) of 2 number residential apartment units. This development consists of demolition of existing roof of rear extension, construction of first floor above. Dem...
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Limerick City and County Council_103432
- Veröffentlicht:
- 12. August 2026
- Frist:
- 12. August 2026
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
This project consists of the part demolition and re construction, to include rear extension at first floor level ,a mixed living unit (note impacts on electrical and mechanical design) of 2 number residential apartment units. This development consists of demolition of existing roof of rear extension, construction of first floor above. Demolition of chimney and existing floor slab. The construction of first floor extension and completion of the existing envelope to current regulations, including the achievement of the Building to a BER of A2 or greater. In addition to this, ancillary site works comprising of connection of electrical services, footpaths, parking, boundary treatment and landscape works are proposed
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
4 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten1 Angabe erfasstDokumentenpaket
Auftraggeber
Freischalten2 Angaben erfasstAuftraggeber · Anschrift
Verfahrensdaten
Freischalten4 Angaben erfasstBekanntmachungsnummer · Referenz des Auftraggebers · Verfahrensart · Auftragsart
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Ähnliche Bekanntmachungen
4Refurbishment of existing municipal building to 2 number apartment units, and a rear first floor extension and all associated works.58 Mayorstone Drive Limerick.
Limerick City and County Council_103432Limerick.Frist: 09. Sept.This project consists of the part demolition and re construction, to include rear extension at first floor level ,a mixed living unit (note impacts on electrical and mechanical design) of 2 number residential apartment units. This development consists of demolition of existing roof of rear extension, construction of first floor above. Demolition of chimney and existing floor slab. The construction of first floor extension and completion of the existing envelope to current regulations, including the achievement of the Building to a BER of A2 or greater. In addition to this, ancillary site works comprising of connection of electrical services, footpaths, parking, boundary treatment and landscape works are proposedView CfT Workspace
Donegal County Council_1193Frist: 06. Aug.The works principally comprise the construction of a new 18m x 10m shed at Fort Dunree, excavation of foundations and associated groundworks, casting of foundations and the floor slab, and installing a steel structural frame, along with walls, external roof cladding, and gutters. Extension of existing water supply and installation of internal sink. Installation of surface water drainage and external footpaths. Extension of existing power supply and installation of internal sockets and lighting. Installation of doors to openings. Completion of ground works and associated landscaping.View CfT Workspace
CorlannFrist: 06. Aug.The works consist of demolition and removal of a section of concrete floor and toilet cubicle, reinstatement of floor section, full fit out of the unit including stud walls, ceiling, doors, vinyl flooring, fit out of three toilets, kitchenette, electrical, heating and ventilation systems.View CfT Workspace
Tipperary County CouncilFrist: 11. Aug.The works consist of alterations , conservation and restoration works to the existing Market House Building and No 25 Old Church St, completion of a new two storey extension to the rear of 25 Old Church St, new finishes, services, roof coverings, facade reconstruction along with new windows and doors throughout and external works to the rear yard and archway.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 12. August 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Limerick City and County Council_103432.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.