Corlann
View CfT Workspace
The works consist of demolition and removal of a section of concrete floor and toilet cubicle, reinstatement of floor section, full fit out of the unit including stud walls, ceiling, doors, vinyl flooring, fit out of three toilets, kitchenette, electrical, heating and ventilation systems.
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Corlann
- Veröffentlicht:
- 06. August 2026
- Frist:
- 06. August 2026
Ausschreibungsbeschreibung
The works consist of demolition and removal of a section of concrete floor and toilet cubicle, reinstatement of floor section, full fit out of the unit including stud walls, ceiling, doors, vinyl flooring, fit out of three toilets, kitchenette, electrical, heating and ventilation systems.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
4 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten1 Angabe erfasstDokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Verfahrensdaten
Freischalten4 Angaben erfasstBekanntmachungsnummer · Referenz des Auftraggebers · Verfahrensart · Auftragsart
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Ähnliche Bekanntmachungen
2Fit out of Roanmore unit in Waterford for Corlann
Brothers of Charity Services IrelandClarinbridgeFrist: 03. Sept.The works consist of demolition and removal of a section of concrete floor and toilet cubicle, reinstatement of floor section, full fit out of the unit including stud walls, ceiling, doors, vinyl flooring, fit out of three toilets, kitchenette, electrical, heating and ventilation systems.View CfT Workspace
Limerick City and County Council_103432Frist: 12. Aug.This project consists of the part demolition and re construction, to include rear extension at first floor level ,a mixed living unit (note impacts on electrical and mechanical design) of 2 number residential apartment units. This development consists of demolition of existing roof of rear extension, construction of first floor above. Demolition of chimney and existing floor slab. The construction of first floor extension and completion of the existing envelope to current regulations, including the achievement of the Building to a BER of A2 or greater. In addition to this, ancillary site works comprising of connection of electrical services, footpaths, parking, boundary treatment and landscape works are proposed
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 06. August 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Corlann.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.