Energinet Systemansvar A/SFredericiaTED
Supplier Qualification System for EPCM consultant for the Danish hydrogen backbone
The Danish Hydrogen Backbone project (DHB) is a comprehensive effort to establish a hydrogen infrastructure in Denmark, connecting planned large-scale hydrogen production in Denmark, produced from renewable energy sources such as wind and solar, with the German and European hydrogen markets. The project is part of the European hydrogen in...
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Energinet Systemansvar A/S
- Veröffentlicht:
- 18. August 2026
- Frist:
- Nicht angegeben
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
The Danish Hydrogen Backbone project (DHB) is a comprehensive effort to establish a hydrogen infrastructure in Denmark, connecting planned large-scale hydrogen production in Denmark, produced from renewable energy sources such as wind and solar, with the German and European hydrogen markets. The project is part of the European hydrogen infrastructure and significantly contributes to the EU's goals of climate neutrality and reduction of greenhouse gas emissions. The full backbone is planned to extend all the way from underground storage in the northern part of Denmark (Lille Torup) to the German border (Frøslev), but a political decision has been made to initially focus on building the southern part of the system (DHB1), and thereby having this part operational by the end of 2030. The purpose of establishing the SQS is to be able to tender for full-service consultancies (EPCM suppliers), who can support Energinet in building the DHB. The EPCM supplier will function as a strategic partner to Energinet and will be required to deliver on wide area of Engineering, Procurement and Construction-Management activities, while simultaneously engaging in the overall project-management organization in Energinet. The EPCM supplier is expected to be responsible for the areas of: a) design (this includes producing and developing the detailed design); (b) procurement of necessary materials and equipment; (c) management and administration of the construction contracts. DHB1 includes the conversion of 88 km 30” methane pipeline (one out of two parallel pipelines) and the establishment of 45 km 36” hydrogen pipeline including L/V-stations and PLR-stations, along with metering and regulation stations on the mainline as well as branch off connection stations for hydrogen producers and consumers. The decision to initially build only DHB1 reflects a pragmatic approach for developing a scalable hydrogen infrastructure that can be expanded as market demand and production capacity grow. The first call for tender on the SQS will include an EPCM contract for DHB1 and potentially options for additional parts of the full DHB. Further EPCM contracts are expected to be tendered under the SQS, when political decisions for the remaining parts of the DHB are sin place.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
5 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten6 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0000
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Veröffentlichungsstelle
Freischalten6 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Re-tender - Framework agreement regarding Third-Party Verification and Certification of the Danish Hydrogen Backbone
EnerginetFredericiaThe Danish Hydrogen Backbone project (DHB) is a comprehensive effort to establish a hydrogen infrastructure in Denmark, connecting planned large-scale hydrogen production in Denmark, produced from renew-able energy sources such as wind and solar, with the German and European hydrogen markets. The project is part of the European hydrogen infrastructure and significantly contributes to the EU's goals of climate neutrality and reduction of greenhouse gas emissions. The full backbone is planned to extend all the way from underground storage in the northern part of Denmark (Lille Torup) to the German border (Frøslev), but a political decision has been made to initially focus on building the southern part of the system (DHB1) and thereby having this part operational by the end of 2030. The scope of services for the framework agreement has an intention of describing all phases of the DHB-1 project from detailed design to testing and commissioning for the purpose of taking the hydrogen transmission asset into operation, thus the framework agreement is also intended to be used for the remaining part of the Danish Hydrogen Backbone project and therefore covering the full backbone. For further information please see Scope of services – Appendix 2, sec. 2.1. The Contracting Authority wants to purchase verification and certification services from an independent, third-party agency in order to satisfy those verification and certification requirements laid down under the compliance plan. For further details regarding the tender, reference is made to the tender documents. The value of the framework agreement is expected to amount to 13.000.000 EURO with the possibility of extension with 100% which amounts to the total value of 26.000.000 EUR.VA Sletteveien-Karstensens vei AN2221
Fredrikstad kommuneFREDRIKSTADFrist: 21. Sept.The contracting authority hereby invites tenderers to a competition for a contract for a water and sewage project for Sletteveien-Karstensens vei. The procurement includes approx. 2,200 metres pipeline ditch (separation) and a new pumping station for sewage on residential streets at Lisleby. The project also includes re-establishment of road lighting installations on parts of the stretch (Karstensens vei) and upgrade of the sidewalk in Lislebyveien. The project will be carried out as an execution contract in accordance with NS8405. A comprehensive description of the delivery is in the annexes to the tender documentation.European public tender H2Cast Procurement & transport of Hydrogen for the benefit of Gasunie Energy Development
N.V. Nederlandse GasunieGroningenThis tender includes the procurement and delivery of Hydrogen for the H2Cast Project. H2CAST is an acronym and stands for H2 CAvern Storage Transition, i.e. the conversion of existing caverns and facilities. The H2CAST pilot project is intended to a). demonstrate the feasibility of large scale underground hydrogen storage (UHS) and to prove the suitability of the salt caverns in Etzel for hydrogen storage and b). to research the hydrogen storage operation including purification and compression. Once successfully completed the pilot project will pave the way for converting (re-purposing) and expanding the existing cavern field, including above ground processing facilities and the pipeline infrastructure to comply with the expected growing hydrogen storage demand to support the Northwest Europe region. The required quantity of hydrogen is 44.500 kilogram (KG). This hydrogen needs to be transported and delivered to Storag Etzel GmbH at the Etzel location. Delivery must be completed between April 1, 2025, and August 1, 2025, in total 110 working days.General Contract For Gravsbekken Stage 2
Bærum kommuneSANDVIKAFrist: 01. Sept.The project Gravsbekken stage 2 includes upgrading and separation of the pipeline network in the upper part of the catchment area of Gravsbekken in Bærum municipality. In the current situation, wastewater and surface water are transported in a joint pipeline in the previous bekkeleie, which mostly functions as a property border between private properties. The background for the project is the need to separate the pipeline network in order to reduce the supply of foreign water to the municipal sewage system and onwards to VEAS. The measure shall also contribute to reducing the risk of basement flooding as a result of capacity challenges in the downstream pipeline network. The contract work includes the establishment of a separate system for wastewater and surface water in the upper part of the catchment area for Gravsbekken, upstream of the contract border to Gravsbekken stage 1. including the establishment of a joint ditch for several types of pipelines, where appropriate Connection to the existing pipeline network and the necessary adaptations to the completed installations in Gravsbekken stage 1Re-establishment of affected areas, including private garden areas. W-drawings showing an overview of the site belt for the entire project are attached as part of annex V02. Detailed W-drawings for each property will be submitted after the contract has been signed. Site inspection: Nadderudveien 25BDate and date: 29.06.2026, 12.00 Registration by 26.06.2026, with the number of participants.1000864 General Contract For Gravsbekken Stage 2
Bærum kommuneSANDVIKAFrist: 21. Aug.The project Gravsbekken stage 2 includes upgrading and separation of the pipeline network in the upper part of the catchment area of Gravsbekken in Bærum municipality. In the current situation, wastewater and surface water are transported in a joint pipeline in the previous bekkeleie, which mostly functions as a property border between private properties. The background for the project is the need to separate the pipeline network in order to reduce the supply of foreign water to the municipal sewage system and onwards to VEAS. The measure shall also contribute to reducing the risk of basement flooding as a result of capacity challenges in the downstream pipeline network. The contract work includes the establishment of a separate system for wastewater and surface water in the upper part of the catchment area for Gravsbekken, upstream of the contract border to Gravsbekken stage 1. including the establishment of a joint ditch for several types of pipelines, where appropriate Connection to the existing pipeline network and the necessary adaptations to the completed installations in Gravsbekken stage 1Re-establishment of affected areas, including private garden areas. W-drawings showing an overview of the site belt for the entire project are attached as part of annex V02. Detailed W-drawings for each property will be submitted after the contract has been signed. Site inspection: Nadderudveien 25BDate and date: 29.06.2026, 12.00 Registration by 26.06.2026, with the number of participants.Green Hydrogen Investments in India
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 07. Sept.GIZ provides consultancy to its partners through a wide array of methods. Most importantly, GIZ develops and implements solutions together with partners through close cooperation and process advisory. The project "Green Hydrogen Investments" (GH2I), implemented under the Indo-German Bilateral Development Cooperation by Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH on behalf of the German Federal Ministry for Economic Cooperation and Development (BMZ) and Ministry of New and Renewable Energy India (MNRE), contributes to a sustainable and inclusive energy transition towards climate neutrality by improving the policy, institutional and technical requirements for the use of green hydrogen in India"s hard-to-abate sectors. The goal of this specific tender is to support GIZ and its partners in achieving these goals. Green hydrogen is particularly important for energy-intensive industrial sectors, such as the iron, e-SAF and fertilizer industry among others, which cannot be efficiently and cost-effectively decarbonized with purely electricity-based technologies. The objective of the tender is to provide high-quality advisory services, ad hoc studies and policy and regulatory instrument proposals and designs in the context of gH2 in hard-to-abate sectors in India based on international experience. The contract offers support through studies in the space of green ports, green iron and steel, e-SAF and green public procurement. The assignment provides the project also with ten regulatory and policy instruments: Policy Instruments: - Framework for Green Hydrogen Demand Creation, e.g. covering sector-specific pathways for the gradual substitution of grey hydrogen in refineries and fertilisers, utilizing non-mandatory and phased market-aligned approaches, and aligning green public procurement with India"s broader decarbonisation goals (NDCs) - Infrastructure Planning Framework, e.g. covering strategic cluster formation, pilot design, RACI-based roles, and tender design that incorporates quality and safety criteria (such as PESO compliance) alongside site selection and state-level capacity building. - Integration of Green Hydrogen in State Energy Planning (IEP), e.g. adopting a state-led approach to integrate into broader provincial energy strategies, building on existing projects such as the ongoing IEP project in Odisha to ensure regional alignment. - Gender Policy in Green Hydrogen, e.g. promoting gender inclusion across the value chain to ensure diverse participation and workforce development within the emerging green hydrogen economy Regulatory Instruments: - Green Hydrogen Infrastructure - Legal & Regulatory Framework, e.g. covering the assessment of existing legal frameworks and infrastructure-related laws (such as the PMP Act), identifying regulatory gaps that require amendments, and providing recommendations to ensure adequate legal backing for shared infrastructure. - Policy as a Code (Energy Regulations), e.g. covering the conversion of policies and regulatory provisions-including certification schemes, tariffs, GNA rules, and connectivity rules-into machine-readable formats to enable automated, consistent implementation and rule-based decision-making. - Port & Logistics Handling Norms for Green Hydrogen and Derivatives, e.g. covering the establishment of standards and procedures for the handling, storage, and transport of green fuels at ports, with a specific focus on addressing bunkering gaps for Ammonia and Methanol. - Green Iron and Steel Taxonomy Integration Framework, e.g. covering the integration of notified green steel taxonomy into public procurement and financing, ensuring alignment with national targets (NDCs) and broader decarbonisation efforts while providing guidance on the structuring of financial support mechanisms for equipment and process integration - Green Hydrogen Standardization Roadmap, e.g. covering the establishment of hydrogen standardization efforts within the Indo-German Energy Partnership and India's National Green Hydrogen Mission - e-SAF Regulatory Readiness Framework, e.g. covering the development of a regulatory framework for the production, certification, accounting, and export of e-SAF in India, aligned with international requirements as ReFuelEU Aviation Regulation, RED III, and associated delegated acts.Procurement of Relocatable filling and Hydrogen Production (electrolyser) device with transportable hydrogen storage (H2Go Invest Project)
Oulun yliopistoOULUFrist: 22. Sept.This procurement is carried out as part of the H2Go Invest project, which aims to advance the hydrogen economy infrastructure in Northern Finland. The project and its investments are co-funded by the European Regional Development Fund (ERDF) by The Council of Oulu Region. The procured equipment will be used for research and piloting purposes to test hydrogen distribution, digital management systems, and material durability in cold climates. The investment framework operates in close cooperation with the H2Go Insight and H2Go Investigate research initiatives. Procurement of Relocatable filling and Hydrogen Production (electrolyser) device (designed for periodic relocation between sites, rather than a continuously mobile/wheeled vehicle) capable of operating reliably in demanding northern winter conditions with transportable hydrogen storage. It will be used to pilot hydrogen distribution in both rural and urban environments (such as Oulu and Utajärvi) for logistics companies, municipalities, and the Finnish Defence Forces. The container and its materials must be optimized and certified for structural durability in cold climates. Please note that maximum price for the Procurement of Relocatable filling and Hydrogen Production (electrolyser) device with transportable hydrogen storage is 1 000 000 euros (without VAT). Procurement unit can not accept tenders exceeding this amount.BA-26-023-GK Project reserve water Gjøvik-Biri ENT1B Raw water pump station
Gjøvikregionen - AnskaffelserGJØVIKGjøvik municipality is responsible for ensuring a safe and stable delivery of drinking water to the inhabitants of the municipality. In order to strengthen security of supply, it has been decided to establish a full-fledged back-up water system that can supply both Biri and Gjøvik. Stage 1 of the project included the establishment of an submarine pipeline from Gjøvik to Redalen, the construction of a pressure increase station, as well as establishing a connection point for continuing the pipeline towards Biri. The sea pipeline was lowered in Mjøsa in autumn 2020, and after completion of the pump station the facility was put into operation in 2021. In stage 2 the pipeline shall be continued from Redalen to Biri, where both a raw water pump station and a new water treatment plant shall be established. In this contract, the establishment of a raw water pump station with the execution of pipelines from ENT2 up until the land pipeline contract ("ENT3") shall be executed.Fund Manager for The Fund for African-Danish Relations through mutual Exchange of Culture and Arts (ARCH)
Ministry of Foreign AffairsCopenhagenThe Fund for African-Danish Relations through mutual ExChange of Culture and the Arts (ARCH) is Denmark’s initiative to strengthen equitable, long-term cultural partnerships with countries in Africa where Denmark is represented through an Embassy or a Consulate General, or in special cases, in other African countries where projects may be considered to be of particular importance. It is a four-year program anchored in Denmark’s Development Policy Strategy “A Changing World – Partnerships in Development” and its “Africa’s Century” strategy. ARCH is implemented through a dedicated Fund Manager (FM). The FM will be responsible for day-to-day implementation and must ensure full compliance with MFA’s principles and requirements for results-based management and financial accountability, as defined in the Aid Management Guidelines (AMG) for bilateral programmes and projects and Financial Management Guidelines (FMG). The contract period runs from August 2026 to December 2030. ARCH positions culture and the arts as a development end in itself based on the intrinsic value of culture for societies, communities and individuals and its ability to foster mutual understanding and appreciation for a diversity of cultural expressions and cultural heritage. At the same time, ARCH is also a strategic tool for contributing to a wide range of sustainable development goals and Danish development priorities related to areas such as promoting innovation, social cohesion and inclusive economic growth, and fostering intercultural dialogue and strengthened diplomatic relations that can bring about mutual benefits. ARCH is implemented in countries in Africa, where Denmark is represented through an embassy. At present, these include Algeria, Egypt, Morocco, Tunisia, Ethiopia, Kenya, Rwanda, Tanzania, Uganda, Ghana, Nigeria, Senegal, Somalia and South Africa. In special cases, projects in other African countries may be considered if they demonstrate an extraordinary ability to achieve the objectEnvironmental survey and Environmental Impact Assessment (EIA) for Shore Crossing - AquaDuctus Section 1 (Offshore)
AquaDuctus Pipeline GmbHKasselFrist: 22. Sept.To address Europe's future energy demand, significant investments into hydrogen infrastructure are essential. One of the core components of this initiative is the development of a pan-European hydrogen pipeline network in the North Sea, designed to connect major hydrogen producers with key consumers across the continent. The AquaDuctus project is part of this future pipeline network. The AquaDuctus project consists of an offshore part (Exclusive Economic Zone (EEZ) and territorial waters of the German North Sea and a receiving terminal at the coastline of Lower Saxony) and an onshore part to make connection with the onshore grid. The AquaDuctus project is planned as a large diameter pipeline (48 inch) with a transport capacity of 20 GWH2 and a design pressure of 120 bar. The conceptual design of the pipeline enables the connection of neighbouring European hydrogen infrastructures and the planned production facilities in the German EEZ (SEN-1 Area). For the shore crossing, the selected contractor shall prepare a legally compliant EIA as part of the Energy Industry Act (EnWG) permit process, based on agreed scoping with the responsible approval authority (Landesamt für Bergbau, Energie und Geologie - LBEG), covering nature conservation, water protection, and impact compensation requirements, which also include environmental studies. The substantive requirements for the environmental documentation are derived from the Energiewirtschaftsgesetz (EnWG), Bundesnaturschutzgesetz (BNatSchG) and Wasserhaushaltsgesetz (WHG). The contracting authority will align the precise scope of the investigations with the LBEG. The selected contractor shall assist the contracting authority in preparing, planning and executing the permit application process. The services comprise: determination of the data basis; preparation of documents for and participation in the scoping conference with the approval authority and specialist authorities (optional); performance of environmental surveys; preparation of formal environmental documentation for approval. Further technical requirements are detailed in Attachment B.1 Scope of Work. The duration of the contract is not time limited. The estimated duration is 2.5 years, but the works due under the contract may take longer, e.g., if the works are not yet completed because the permit application process takes longer. Further details are provided in the contract documentation.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Energinet Systemansvar A/S.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.