Neu: Marktberichte zur öffentlichen Vergabe in Deutschland Bericht ansehen

AquaDuctus Pipeline GmbHKasselTED

Environmental survey and Environmental Impact Assessment (EIA) for Shore Crossing - AquaDuctus Section 1 (Offshore)

To address Europe's future energy demand, significant investments into hydrogen infrastructure are essential. One of the core components of this initiative is the development of a pan-European hydrogen pipeline network in the North Sea, designed to connect major hydrogen producers with key consumers across the continent. The AquaDuctus pr...

Angebotsfrist: 22. September 2026Typ: Ausschreibung

Umweltgutachten, Wasserwirtschaft

Dokumente kostenlos freischalten

Ohne Kreditkarte · Sofortiger Zugang

Inhalt auf einen Blick

Ausschreibungstyp:
Ausschreibung
Auftraggeber:
AquaDuctus Pipeline GmbH
Veröffentlicht:
23. August 2026
Frist:
22. September 2026
Thema:
Umweltgutachten

Ausschreibungsbeschreibung

Vollständige Beschreibung anzeigen

To address Europe's future energy demand, significant investments into hydrogen infrastructure are essential. One of the core components of this initiative is the development of a pan-European hydrogen pipeline network in the North Sea, designed to connect major hydrogen producers with key consumers across the continent. The AquaDuctus project is part of this future pipeline network. The AquaDuctus project consists of an offshore part (Exclusive Economic Zone (EEZ) and territorial waters of the German North Sea and a receiving terminal at the coastline of Lower Saxony) and an onshore part to make connection with the onshore grid. The AquaDuctus project is planned as a large diameter pipeline (48 inch) with a transport capacity of 20 GWH2 and a design pressure of 120 bar. The conceptual design of the pipeline enables the connection of neighbouring European hydrogen infrastructures and the planned production facilities in the German EEZ (SEN-1 Area). For the shore crossing, the selected contractor shall prepare a legally compliant EIA as part of the Energy Industry Act (EnWG) permit process, based on agreed scoping with the responsible approval authority (Landesamt für Bergbau, Energie und Geologie - LBEG), covering nature conservation, water protection, and impact compensation requirements, which also include environmental studies. The substantive requirements for the environmental documentation are derived from the Energiewirtschaftsgesetz (EnWG), Bundesnaturschutzgesetz (BNatSchG) and Wasserhaushaltsgesetz (WHG). The contracting authority will align the precise scope of the investigations with the LBEG. The selected contractor shall assist the contracting authority in preparing, planning and executing the permit application process. The services comprise: determination of the data basis; preparation of documents for and participation in the scoping conference with the approval authority and specialist authorities (optional); performance of environmental surveys; preparation of formal environmental documentation for approval. Further technical requirements are detailed in Attachment B.1 Scope of Work. The duration of the contract is not time limited. The estimated duration is 2.5 years, but the works due under the contract may take longer, e.g., if the works are not yet completed because the permit application process takes longer. Further details are provided in the contract documentation.

Weiterführende Details

Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.

  • Kernanforderungen der Ausschreibung priorisiert aufbereitet
  • Fristen, Eignungskriterien und Unterlagen in einem Ablauf
  • Hinweise zur strukturierten Angebotsvorbereitung
  • Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos freischalten

30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar

Alle Vergabedetails

Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.

6 Datenbereiche verfügbar

30 Tage kostenlos freischalten

30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar

Ähnliche Bekanntmachungen

10

Häufige Fragen zu dieser Ausschreibung

Wie kann ich mich auf diese Ausschreibung bewerben?
Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
Bis wann läuft die Angebotsfrist?
Die Angebotsfrist endet am 22. September 2026.
Wer ist der Auftraggeber?
Der Auftraggeber ist AquaDuctus Pipeline GmbH.
Welche Unterlagen sind für den Start relevant?
In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.
1.200+ Unternehmen10.000+ aktive AusschreibungenDSGVO-konforme Plattform

Nächster Schritt

Vollzugang für diese ausschreibung sichern

Erhalten Sie alle Dokumente zu "Environmental survey and Environmental Impact Assessment (EIA) for Shore Crossing - AquaDuctus Section 1 (Offshore)" von AquaDuctus Pipeline GmbH und behalten Sie Fristen und Einreichungshinweise im Blick.

Frist im Blick bis 22. September 2026Ohne Kreditkarte startbar