St.Ciaran’s Community School (Kells)KellsTED
St. Ciaran's Community School Kells
St. Ciaran’s Community School is a primary school that is located in Kells, Co. Dublin. The school is a two storey building consisting of classrooms, GP hall and technology block extending to 5,000m2. This project entails works in decommissioning and replacing the existing emergency lighting and fire alarm system installations throughout ...
Elektroinstallation
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
St. Ciaran’s Community School is a primary school that is located in Kells, Co. Dublin. The school is a two storey building consisting of classrooms, GP hall and technology block extending to 5,000m2. This project entails works in decommissioning and replacing the existing emergency lighting and fire alarm system installations througho...
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- St.Ciaran’s Community School (Kells)
- Veröffentlicht:
- 26. Juli 2026
- Frist:
- 13. August 2026
- Thema:
- Elektroinstallation
- Bauobjekt:
- Schule
Bauobjekt-Klassifikation
- SchuleHauptobjekt
Ausschreibungsbeschreibung
St. Ciaran’s Community School is a primary school that is located in Kells, Co. Dublin. The school is a two storey building consisting of classrooms, GP hall and technology block extending to 5,000m2. This project entails works in decommissioning and replacing the existing emergency lighting and fire alarm system installations throughout the building. Refer to the drawings for further information on the works to be carried out. The scope of the works will be as follows: • Remedial works to the existing electrical boards throughout the building to cater for the new emergency lighting installation. • Decommissioning and replacing of the existing emergency lighting installation throughout the building and installation of a new emergency lighting installation that shall be compliant with I.S. 3217:2023 throughout the building. • Decommissioning and replacing of the existing fire alarm installation throughout the building and installation of a new fire alarm installation that shall be compliant with I.S. 3218:2024 throughout the building. • Supply and installation of a new cable carrier system throughout the school building to cater for the proposed new fire alarm and emergency lighting installation to be installed. • The existing ICT system installation, intruder alarm system, PA system and CCTV system installation shall be retained throughout the building. • All electrical works as highlighted on the drawings and the specifications. • Thorough cleaning of the building via contract cleaners once all works are completed so that the building is clean and tidy for re-opening of the building for the new term. • All associated preliminaries for the project. Unit A6, M4 Business Park, Maynooth Road, Celbridge, Co. Kildare, W23 VFY7 (Tel: 01-6274103) ____________________________________________________________________________________________________________________________ _________________________________________________________________________________ • All associated decommissioning works. • All builders’ works associated with the above. See ‘Builders Work Schedule’ in ‘Volume C1 – Pricing Schedule’ for further details. • Acting as Project Supervisor Construction Stage for the project. • Carrying out all works in compliance with current health and safety regulations. • Any other works as identified on the drawings and the specifications.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- St Cronan's Junior National SchoolDublinFrist: 22. Juni
Mechanical upgrading works to St. Cronan’s Junior National School, Brackenstown, Swords, Co. Dublin, K67 DP28.
St. Cronan's National School is a single-storey school building with an approximate floor area of 3,050m². This project entails works in decommissioning and replacing the existing space heating throughout the majority of the building which includes the supply and installation of new radiators, new heating services pipework, new rooms controls, etc. throughout the majority of the school building. There are some areas in the building where the existing space heating installation shall be retained but some remedial works shall be carried out to the existing space heating installation in these areas. Refer to the tender drawings and tender documents for further information. - St Oliver Plunkett NS NewcastleAthenryFrist: 08. Juni
St. Oliver Plunkett National School, Newcastle, Athenry, Co. Galway - Mechanical and Electrical Upgrade Works
The existing school building (1977, extensions 2010-2013 and 2025, approx. 732 sq. m) requires stripping out and disposal of the old LPHW space heating, cold water storage, and boiler house in the original building. New works include general power for the heating upgrade, emergency lighting, and fire alarm. Retain existing electrical and Solar PV. - Brothers of Charity Services IrelandClarinbridgeFrist: 14. Aug.
Additional office areas to Corlann Services Clare training centre at Gort Road Industrial Park, Ennis
The works comprise the refurbishment and alteration of an existing training centre including the construction of a new structural intermediate first floor (mezzanine) within the existing building envelope to provide additional office accommodation, installation of a new enclosed platform lift complete with lift shaft, structural steelwork and associated foundations, provision of new first floor windows, formation of a protected escape corridor and new emergency escape exit, installation of new fire-rated compartment floors, ceilings and partitions, fire door upgrades, refurbishment of existing sanitary facilities, new kitchenette and fitted furniture, mechanical and electrical services alterations including fire alarm and emergency lighting modifications, internal finishes, and all associated builders' work and ancillary site works necessary for the complete execution of the project. - Scoil Iosa OranmoreGalwayFrist: 26. Juni
Prior Information Notice - Fire Safety Systems upgrade works at Scoil Iosa, Oranmore, Co Galway
Prior Information Notice - Fire Safety Systems upgrade works at Scoil Iosa, Oranmore, Co Galway. School building affected by the works include the Modular Buildings and 'Old School Building'. Works include upgrade of Fire Alarm, Emergency Lighting, new LED lighting and General Services. - St. Angela's Secondary School (Ballytruckle)waterfordFrist: 27. Juli
Works to Façade of St Joseph’s Building at St.Angela's Secondary School, Ursuline Convent, Waterford
The project comprises external refurbishment works to the existing school building, including the careful removal and disposal of existing defective render to the front and side elevations. The works include preparation of the underlying substrate and the application of a new breathable lime render system in accordance with the project specifications. The works further include the removal and replacement of existing rainwater goods, including gutters, downpipes, brackets, fixings and associated fittings, together with all necessary making good works. The project also includes the removal and replacement of defective window lintels, including all necessary temporary support works, localised opening-up works, reinstatement, repairs and making good to adjoining finishes. The Contractor shall carry out all works within a live school environment and shall allow for all necessary protection, access equipment, scaffolding, temporary works, dust suppression, safety measures, hoarding and phasing required to safely complete the works with minimal disruption to school activities. The works shall include all ancillary and associated works necessary for the proper completion of the project. - IDA IrelandDublin
Lighting Upgrade Works - IDA Business and Technology Park, Letterkenny, Co. Donegal
Decommissioning and removal of existing lighting fixtures and columns as per drawings. Installation and commissioning of new lighting fixtures and columns and associated civils works at the IDA Business and Technology Park Letterkenny, Co. Donegal - Sarpsborg kommuneSarpsborg
Framework agreement low voltage - Operation and maintenance and minor installations of fire alarms.
Sarpsborg municipality mainly has a need for the following work and installations (NB! The list is not exhaustive): - automatic fire alarm systems. - fire alarm system - emergency lighting system. - smoke hatches and smoke hatch installations. - smoke and fire curtains. - speech notification - structured cabling system - Annual inspections - Dunmore Community SchoolDunmoreFrist: 24. Juli
Dunmore Community School, Dunmore, Co Galway (RN: 91414Q) - Central Wood Dust Extraction Upgrade Works
The Dunmore Community School complex consists of the existing 1960 main school building, 1990 Sports Hall Building and 1998 School Extension, which are located in the townland of Abbeyland South, Dunmore, to the east of the town and adjoining the river. The Construction Studies room is in the main school building. The remedial works that require to be carried out at the above school consist of the upgrade works to the Central Wood Dust Extraction Installations, including the associated Builders Attendances, etc. - City of Dublin Education and Training BoardDublinFrist: 29. Juni
Invitation to Tender for Architect Led Multidisciplinary Construction Consultancy Services for Mechanical and Electrical remedial upgrade works and associated works
Re: Invitation to Tender for Architect Led Multidisciplinary Construction Consultancy Services (including the buying in of other services as required) for: PHASE 1 Works: the full electrical strip out and re-wire of the building including replacement of distribution boards, lighting, fire alarm, emergency lighting and data, all associated builder's works, fire-stopping and compartmentation upgrades, upgrade of drop ceilings, remedial painting and decorating, all other associated remedial works. Phase 2 Works: heating and energy upgrade works, and all associated remedial works. All at City of Dublin ETB – FET College Ballyfermot, Ballyfermot Road, Dublin 10, D10TX46 - St Catherine of SienaCurraghFrist: 26. Juni
Electrical Upgrade works to St. Catherine's of Siena, Curragh Camp, Curragh, Co. Kildare
EWS 2026 Electrical upgrading works to St. Catherine's of Siena, Curragh Camp, Curragh, Co. Kildare. the works entail the replacement of the existing electrical services throughout the building. Refer to the drawings for further information on the works to be carried out.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 13. August 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist St.Ciaran’s Community School (Kells).
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.