Kinn kommuneMåløyTED
Sea pipeline Melkevika - Havikbotnen
Kinn municipality shall establish a new water pipeline (submarine pipeline) between Melkevika and Havikbotnen. For a complete description of the assignment, see the contract documentation (Part II) and annexes.
Leitungsbau
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Kinn kommune
- Veröffentlicht:
- 02. Juli 2026
- Frist:
- 21. September 2026
- Thema:
- Leitungsbau
- Bauobjekt:
- Trinkwasserleitung / Versorgungsnetz
Bauobjekt-Klassifikation
- Trinkwasserleitung / VersorgungsnetzHauptobjekt
Ausschreibungsbeschreibung
Kinn municipality shall establish a new water pipeline (submarine pipeline) between Melkevika and Havikbotnen. For a complete description of the assignment, see the contract documentation (Part II) and annexes.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
5 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0000
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Ähnliche Bekanntmachungen
8Contract submarine pipelines Stad ship tunnel
KYSTVERKETÅLESUNDFrist: 03. Sept.The Norwegian Coastal Administration shall execute a contract for the establishment of water pipelines in the sea, in Vanylvsfjorden and in Moldefjorden. This will be carried out to ensure the delivery of water to the construction areas for the upcoming turnkey contract for the construction of Stad ship tunnel and to permanent water supply to Stad and Vanylven municipalities after the completion of Stad Skipstunnel.The project is a cooperation between the Norwegian Coastal Administration and the municipalities Stad and Vanylven.Questions on whether the competition will not be answered in weeks 28 - empty. 31 due to holiday development.Contract - 420768 Fossumdalen stage 5-6, Pipeline route.
Trondheim kommuneTRONDHEIM"Fossumdalen stage 5-6 - Ledningstrasé" is part of a larger water and sewage project in Trondheim municipality that has run, and shall run, over several stages. The aim is to reduce the amount of overflow supplied to The River Nidelva from the sewage network by establishing a separated main stem for W&S from the sewage zone Lerkendal where surface water is led to the River Nidelva, and waste water is fed by a self-fall to Høvringen treatment facility. In "Fossumdalen stage 5-6, Ledningstrasé", the existing overflow (OP04) shall be established in "Fossumdalen stage 4" connects to the Høvringen sewage tunnel via a diving pipeline under the River Nidelva with a flushing magazine. The pipeline installation starts with drilling rock from the west side of Osloveien south of Stavne to Høvringen sewage tunnel. Under osloveien, a sewage pipeline is laid through a completed freighter and dug a ditch to the east between the properties in Sivert Dahlens veg. Pipelines that controlled drilling will be executed under the River Nidelva to Valøya. Over Valøya and up to Valøyslyngen, pipelines are to be dug in a ditch. Pipelines in valøyslyngen shall be executed in an increased dimension, which together with the existing volume in the existing sewage pipeline upstream OP04 (new overflow) functions as flushing magnet for the diving line. The flushing magazine shall be emptied via a flush manhole and the facility shall be adapted for the supply of water from the municipality ́s water pipelines. A new water and sewage system shall also be constructed from OP04 (a new overflow) to the junction of Alfred Larsens gate and Valøyslyngen. From the junction of Alfred Larsens gate and valøyslyngen, a new water pipeline will be laid in the same route as the existing water pipeline to Holtermanns road. The following turnkey contracts will be transported to the general contractor:1 "Fossumdalen stage 5-6 - Sewage pump station" (the existing sewage pump station APS is replaced by a smaller and more modern sewage pump station APS04.2 "Fossumdalen section 5-6, HVAC, management and automation"The general contractor will take over, among other things, the engineering design and coordination responsibility for these two turnkey contracts. As part of "Fossumdalen stage 5-6, Ledningstrasé", a sheet box shall be prepared for a sheet box for setting down the new APS04, and the existing Water and Sewage will be connected to the new APS04.VA Selhaugvegen - Havikbotn
Kinn kommuneMåløyFrist: 21. Sept.Kinn municipality shall redevelop and establish a new water, wastewater and surface water network and street lights in Botnavegen and Jacob Sandevegen. As well as the establishment of 2 pumping stations for sewage in Havikbotnen and where the current sewage from Botnaholten crosses Botnavegen. In addition the roads shall be restored and asphalted.1000864 General Contract For Gravsbekken Stage 2
Bærum kommuneSANDVIKAFrist: 21. Aug.The project Gravsbekken stage 2 includes upgrading and separation of the pipeline network in the upper part of the catchment area of Gravsbekken in Bærum municipality. In the current situation, wastewater and surface water are transported in a joint pipeline in the previous bekkeleie, which mostly functions as a property border between private properties. The background for the project is the need to separate the pipeline network in order to reduce the supply of foreign water to the municipal sewage system and onwards to VEAS. The measure shall also contribute to reducing the risk of basement flooding as a result of capacity challenges in the downstream pipeline network. The contract work includes the establishment of a separate system for wastewater and surface water in the upper part of the catchment area for Gravsbekken, upstream of the contract border to Gravsbekken stage 1. including the establishment of a joint ditch for several types of pipelines, where appropriate Connection to the existing pipeline network and the necessary adaptations to the completed installations in Gravsbekken stage 1Re-establishment of affected areas, including private garden areas. W-drawings showing an overview of the site belt for the entire project are attached as part of annex V02. Detailed W-drawings for each property will be submitted after the contract has been signed. Site inspection: Nadderudveien 25BDate and date: 29.06.2026, 12.00 Registration by 26.06.2026, with the number of participants.23-023Q-004F National Water Resilience Pipeline Installation & Associated Works Programme
Uisce ÉireannDublinThe Contracting Entity undertook a competition for a framework involving the design, supply, testing, and commissioning of water resilience pipeline installation and associated works at selected locations nationally, under the Contracting Entity's qualification system ref. 23-023 for the provision of Civils Works Contractors to Uisce Éireann.Tawnagh Group Water Scheme – Pipeline Replacement Works
Tawnagh Group Water SchemeSligoFrist: 17. JuliThis Contract includes all civil engineering works associated with the supply, installation, and commissioning of approximately 855m of new sections of 110mm OD PE80 SDR11 pipeline, comprising the replacement of existing 2-inch and 1-inch diameter distribution mains and the extension of the network.10029851 - Strategic Advisory for the Green Climate Fund Pipeline Development and Capacity building
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 17. Juli10029851 - Strategic Advisory for the Green Climate Fund Pipeline Development and Capacity buildingPre-Market Consultation – 48-inch Valves for Offshore Hydrogen Pipeline
AquaDuctus Pipeline GmbH (a subsidiary of GASCADE Gastransport GmbH); supported by Worley Projects as appointed EPCM.KölnOur client is currently preparing the procurement strategy for a 48-inch offshore pipeline intended for the transportation of gaseous hydrogen in the North Sea. In this context, our client, supported by Worley Projects GmbH (acting as EPCm contractor for and on behalf of the client), hereby invites your organisation to participate in a non-binding pre-market consultation (Markterkundung) conducted in accordance with §26 of the German Sector Regulation (SektVO), as part of the applicable German legislation that implements European Union public tendering rules. This consultation is of a purely exploratory nature and serves exclusively to support the client’s internal preparation of a potential future procurement procedure. Any information exchanged in the context of this consultation is purely informative, non-binding, indicative only, and subject to change. Please note that this is not a request for quotation. This request does not constitute the launch of a procurement procedure and does not create any obligation for the contracting authority to procure, tender, award or contract any scope of supply. The contracting authority reserves the right to decide on any further steps. Should a procurement need be identified following the completion of the pre-market consultation, a formal procurement procedure will be initiated, provided the relevant conditions are met. Your feedback within the scope of this pre-market consultation is non-binding and will not affect your chances in any potential future procurement procedure. The purpose of this market consultation is to obtain non‑binding, high‑level information from potential market participants in order to: • Connect with the market to prepare our execution strategy, • Assess the technical feasibility and understand technical limitations of supplying 48-inch valves for connecting the line pipe suitable for hydrogen service in compliance with the minimum requirements of API 6D Annex M, • Understand manufacturing routes, qualification approaches and constraints, • Identify indicative capacities and lead times, and • Support the preparation of transparent, competition‑neutral tender documentation for a potential future procurement procedure. We are currently evaluating our sourcing needs and participants are invited to provide non-binding and purely informative input on topics such as: • Design, Manufacture, and Testing capability for 48-inch valves • General experience with supply of valves in hydrogen service • Experience with supply of valves in compliance with API 6D Annex M, Specification Level for Hydrogen (SLH1, SLH2, SLH3, SLH4) • Experience with supply of valves in compliance with API 6D Annex I; QSL3G and QSL4G • Indicative production capacities and order of magnitude lead times • Key technical or supply chain risks relevant to this type of project Should you be interested in participating, please confirm your interest by contacting the Single point of Contact mentioned above. Please note that first a non-disclosure agreement (NDA) needs to be signed to protect the confidentiality of the client’s information. The NDA must be completed, stamped and signed. Once the NDA has been received and deemed complete, your organization may be added as a registered participant in the market consultation process. Upon confirmation and signing of the NDA, you will receive: • the consultation questionnaire (including supporting documentation), and • further practical details regarding the process and timeline.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 21. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Kinn kommune.
- Welche Unterlagen sind für den Start relevant?