KYSTVERKETÅLESUNDTED
Contract submarine pipelines Stad ship tunnel
The Norwegian Coastal Administration shall execute a contract for the establishment of water pipelines in the sea, in Vanylvsfjorden and in Moldefjorden. This will be carried out to ensure the delivery of water to the construction areas for the upcoming turnkey contract for the construction of Stad ship tunnel and to permanent water suppl...
Leitungsbau
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- KYSTVERKET
- Veröffentlicht:
- 01. Juli 2026
- Frist:
- 03. September 2026
- Thema:
- Leitungsbau
- Bauobjekt:
- Trinkwasserleitung / Versorgungsnetz
Bauobjekt-Klassifikation
- Trinkwasserleitung / VersorgungsnetzHauptobjekt
Ausschreibungsbeschreibung
The Norwegian Coastal Administration shall execute a contract for the establishment of water pipelines in the sea, in Vanylvsfjorden and in Moldefjorden. This will be carried out to ensure the delivery of water to the construction areas for the upcoming turnkey contract for the construction of Stad ship tunnel and to permanent water supply to Stad and Vanylven municipalities after the completion of Stad Skipstunnel.The project is a cooperation between the Norwegian Coastal Administration and the municipalities Stad and Vanylven.Questions on whether the competition will not be answered in weeks 28 - empty. 31 due to holiday development.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten6 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0000
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten4 Angaben erfasstAusführungsorte
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Contract - 420768 Fossumdalen stage 5-6, Pipeline route.
Trondheim kommuneTRONDHEIM"Fossumdalen stage 5-6 - Ledningstrasé" is part of a larger water and sewage project in Trondheim municipality that has run, and shall run, over several stages. The aim is to reduce the amount of overflow supplied to The River Nidelva from the sewage network by establishing a separated main stem for W&S from the sewage zone Lerkendal where surface water is led to the River Nidelva, and waste water is fed by a self-fall to Høvringen treatment facility. In "Fossumdalen stage 5-6, Ledningstrasé", the existing overflow (OP04) shall be established in "Fossumdalen stage 4" connects to the Høvringen sewage tunnel via a diving pipeline under the River Nidelva with a flushing magazine. The pipeline installation starts with drilling rock from the west side of Osloveien south of Stavne to Høvringen sewage tunnel. Under osloveien, a sewage pipeline is laid through a completed freighter and dug a ditch to the east between the properties in Sivert Dahlens veg. Pipelines that controlled drilling will be executed under the River Nidelva to Valøya. Over Valøya and up to Valøyslyngen, pipelines are to be dug in a ditch. Pipelines in valøyslyngen shall be executed in an increased dimension, which together with the existing volume in the existing sewage pipeline upstream OP04 (new overflow) functions as flushing magnet for the diving line. The flushing magazine shall be emptied via a flush manhole and the facility shall be adapted for the supply of water from the municipality ́s water pipelines. A new water and sewage system shall also be constructed from OP04 (a new overflow) to the junction of Alfred Larsens gate and Valøyslyngen. From the junction of Alfred Larsens gate and valøyslyngen, a new water pipeline will be laid in the same route as the existing water pipeline to Holtermanns road. The following turnkey contracts will be transported to the general contractor:1 "Fossumdalen stage 5-6 - Sewage pump station" (the existing sewage pump station APS is replaced by a smaller and more modern sewage pump station APS04.2 "Fossumdalen section 5-6, HVAC, management and automation"The general contractor will take over, among other things, the engineering design and coordination responsibility for these two turnkey contracts. As part of "Fossumdalen stage 5-6, Ledningstrasé", a sheet box shall be prepared for a sheet box for setting down the new APS04, and the existing Water and Sewage will be connected to the new APS04.Maintenance contract, tunnels in the north
Statens vegvesenMossFrist: 17. Aug.The contract work includes maintenance work on national road tunnels in the North, Nordland, Troms and Finnmark counties. The extent of the work is mainly the closure of the recommended measures after the main geological inspection. The measures will mainly include; Rock protection in the form of rock and rock clearing, pigging and securing with shotcrete, as well as mounting bolts, handling any saws. Demolition of old water/frost protection (PE foam) with associated fastening material. Establishment of new water/frost protection and fire protection.Contract procurement - UDK56 - Flood road Sundland east NO-DIG
Bane NOR SFHAMARFrist: 03. Aug.Micro tunnelling, controlled drilling and pilot pipe drilling for a new flood path with surface water culvert and municipal waste water pipelines at Sundland, to ensure handling of surface water to Drammenselva. Bane NOR and Drammen municipalities share builder responsibility.Sea pipeline Melkevika - Havikbotnen
Kinn kommuneMåløyFrist: 21. Sept.Kinn municipality shall establish a new water pipeline (submarine pipeline) between Melkevika and Havikbotnen. For a complete description of the assignment, see the contract documentation (Part II) and annexes.1000864 General Contract For Gravsbekken Stage 2
Bærum kommuneSANDVIKAFrist: 21. Aug.The project Gravsbekken stage 2 includes upgrading and separation of the pipeline network in the upper part of the catchment area of Gravsbekken in Bærum municipality. In the current situation, wastewater and surface water are transported in a joint pipeline in the previous bekkeleie, which mostly functions as a property border between private properties. The background for the project is the need to separate the pipeline network in order to reduce the supply of foreign water to the municipal sewage system and onwards to VEAS. The measure shall also contribute to reducing the risk of basement flooding as a result of capacity challenges in the downstream pipeline network. The contract work includes the establishment of a separate system for wastewater and surface water in the upper part of the catchment area for Gravsbekken, upstream of the contract border to Gravsbekken stage 1. including the establishment of a joint ditch for several types of pipelines, where appropriate Connection to the existing pipeline network and the necessary adaptations to the completed installations in Gravsbekken stage 1Re-establishment of affected areas, including private garden areas. W-drawings showing an overview of the site belt for the entire project are attached as part of annex V02. Detailed W-drawings for each property will be submitted after the contract has been signed. Site inspection: Nadderudveien 25BDate and date: 29.06.2026, 12.00 Registration by 26.06.2026, with the number of participants.Construction of the Interconnected Gas Pipeline Macedonia-Serbia (FIDIC Contract - turnkey)
Joint Stock Company for performing energy activity natural gas transmission NOMAGAS Skopje in state ownershipSkopjeFrist: 13. JuliConstruction of the Interconnected Gas Pipeline Macedonia-Serbia (FIDIC Contract - turnkey)Hammeren intake station - Rock and construction contract
Nedre Romerike vann- og avløpsselskap IKSSTRØMMENFrist: 01. Sept.NRVA shall upgrade the raw water pump station at Glomma for water supply to Nedre Romerike. The project includes a new rock hall that shall house a new high voltage electrical system for pumping operation. The present contract includes rock works, ground works, concrete works and external water and sewage installations.Contract award - 260737 Vollabakken road and water and sewage.
Trondheim kommuneTRONDHEIMTrondheim municipality, hereafter called the contracting authority, invites tenderers to an open competition for a contract in the project Contract Vollabakken Road and Water and Sewage. The municipality would like tenders from tenderers with the professional, technical and economic basis necessary for fulfilment of the contract. The competition will be carried out via the municipality ́s tender implementation tool Mercell. All communication and tender submissions will be via Mercell.WSC/T/044/2026 - WORKS – CONSOLIDATION OF POTABLE INFRASTRUCTURE BETWEEN CIRKEWWA REVERSE OSMOSIS AND TA’ QALI RESERVOIR IN AN ENVIRONMENTALLY FRIENDLY MANNER BY THE WATER SERVICES CORPORATION – WIED MUSA
Water Services CorporationLuqaFrist: 11. Aug.The subject of this tender is the laying of pipes by open cut trenches as per tender documents and bill of quantities to cater for the continuous increase in demand of potable water in the Northern and Central regions of Malta inclusive, but not exclusive, of: Cirkewwa - Qali specifically Wied Musa – Open Cut Trenches o Potable Water Works -Installation ONLY of potable water ductile iron mains 150mm, 350mm and 600mm. o Open Cut Trenches All ductile iron mains and fittings, all polyethylene pipes and fittings and manhole covers and surface boxes are to be supplied by the Water Services Corporation.WSC/T/006/2026 - WORKS – CONSOLIDATION OF POTABLE INFRASTRUCTURE BETWEEN CIRKEWWA REVERSE OSMOSIS AND TA’ QALI RESERVOIR IN AN ENVIRONMENTALLY FRIENDLY MANNER BY THE WATER SERVICES CORPORATION – PHASE 1 - TRIQ L–MGARR, MGARR
Water Services CorporationLuqaThe subject of this tender is the laying of pipes by open cut trenches as per tender documents and bill of quantities to cater for the continuous increase in demand of potable water in the Northern and Central regions of Malta inclusive, but not exclusive, of: Cirkewwa - Qali which includes from Triq San Pawl tal- Qliegha, Mosta to Triq Sir Temi Zammit, Mgarr – Open Cut Trenches o Potable Water Works Installation of potable water ductile iron mains 80mm, 100mm, 150mm and 600mm exclusive of the supply of pipes and fittings. o Wastewater Works Installation of wastewater ductile iron rising main 200mm and 300mm exclusive of the supply of pipes and fittings. All ductile iron mains and fittings, all polyethylene pipes and fittings and manhole covers and surface boxes are to be supplied by the Water Services Corporation.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 03. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist KYSTVERKET.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.