Sandnes kommuneSandnesTED
Parallel framework agreements for technician for sound, lighting and stage and multi-technician.
The Contracting Authority c/o Sandnes Kunst- og kulturhus needs to enter into parallel framework agreements for the following services: • Sound technician • Light technician • Stage technician • Multi technician A contract will be signed with up to four (4) tenderers per sub-contract. The expected start of the sub-contracts is 15.11.2026.
Veranstaltungstechnik
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Sandnes kommune
- Veröffentlicht:
- 03. September 2026
- Frist:
- 25. September 2026
- Thema:
- Veranstaltungstechnik
Ausschreibungsbeschreibung
The Contracting Authority c/o Sandnes Kunst- og kulturhus needs to enter into parallel framework agreements for the following services: • Sound technician • Light technician • Stage technician • Multi technician A contract will be signed with up to four (4) tenderers per sub-contract. The expected start of the sub-contracts is 15.11.2026.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
5 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten4 Angaben erfasstLose LOT-0001 · Lose LOT-0002 · Lose LOT-0003 · Lose LOT-0004
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Ähnliche Bekanntmachungen
10Framework agreement: Consultants and consulting engineers for national tourist roads.
Statens vegvesenMossFrist: 12. Okt.The Norwegian Public Roads Administration c/o National Tourist Roads (henceforth referred to as the Contracting Authority) wishes to enter into a framework agreement with architects (ARK), landscape architects (LARK) and consultant engineers for construction (RIB) for designing tourist road projects in the period 2027-2030. The agreement includes new viewpoints and picnic places and upgrading and renewal of existing points. The framework agreement is divided into three sub-contracts divided in accordance with disciplines: * Sub-contract 1: Architects (ARK) * Sub-contract 2: Landscape architects (LARK) * Sub-contract 3: Consultant engineer for construction (RIB) Tenderers may submit tenders for one or more sub-contract(s). Each individual sub-contract will be evaluated separately, based on the award criteria stated in kgv (the competition implementation tool). A contract will be signed with up to 4 tenderers for sub-contract 1 (ARK) and sub-contract 2 (LARK) and up to 3 tenderers for sub-contract 3 (RIB).Electrical services WEST, SOUTHWEST and SOUTH Parallel framework agreements R01988/R01989/R02081
ForsvarsbyggOSLOFrist: 19. Aug.The Norwegian Defence Estates Agency invites tenderers to submit tenders for framework agreements for electrical services for the Western, Southwest and South Regions. The framework agreements shall cover the need for services in connection with service, maintenance, replacements and new procurements of electrical installations. Parallel framework agreements shall be signed for each sub-contract, with up to 3 tenderers per sub-contract, to the extent that the number of received tenders and qualified tenderers enables. Sub-contract Area A – Western Region West Hordaland: Haakonsvern naval base Uvb bunker Laksevåg Wallemsviken Bergenhus fortress Ulven camp Korsneset B – Southwest Region Southwest Rogaland: Sola Land Sola Sjø Vatneleiren Madla Ulsnes Galta/Rennesøy Jåtta Espedal, Sandnes/Ålgård HV-08 The Defence sector ́s residences in Stavanger and surrounding area C – South Region Sør Agder: Kjevik by Kristiansand Kveviga by Kristiansand Evjemoen The assignment also includes other properties, buildings and technical installations within the respective geographical areas managed by the Norwegian Defence Estates Agency, including, but not limited to, minor installations, support points, storage, shooting and training fields, communication installations, residences, office buildings and future associated objects or other buildings that (shall) be managed by the defence sector. Such objects and services are included in the sub-contract where they geographically belong. There may be other locations or objects that are naturally included in the above mentioned regions. Other sub-tenders cannot be submitted, e.g. based on other professional or geographical divisions. Alternative tenders are also not allowed. The framework agreement ́s maximum contract value for sub-contract A Vestland is NOK 155 million excluding VAT, including an estimated contract value of NOK 124 million excluding VAT. The framework agreement ́s maximum contract value for sub-contract B Rogaland is NOK 9Framework agreement - Road and street lighting
LYSE LUX ASSTAVANGERFrist: 25. Sept.The procurement is for a framework agreement for the delivery of road and street lights, as further described in Annex 1 - Requirements for Products and Deliveries. The framework agreement also includes the delivery of other lighting products (fittings, spare parts, components, control components etc.) that are included in the tenderer's standard assortment (other assortment) both within road lighting and street lighting, but also other fixtures and equipment. The framework agreement is a non-exclusive framework agreement that gives the Contracting Authority the right, but not an obligation, to make call-offs within the Contract Period. The contracting authority shall not be obliged to procure a specific amount within The agreement period.Stage 1 - Prequalification for a Framework agreement advertising, campaigns and graphic design.
Norsk Helsenett SFTRONDHEIMFrist: 14. Sept.The framework agreement shall meet our total need for advertisements, campaigns and graphical design. This includes, among other things, concept and idea development, animation and film production, creative and strategic consulting, reputation building, text and graphic design, knowledge and understanding of channel choices etc. the tenderer must be able to offer all the services described in the requirement specification. Sub-suppliers can be used to provide a complete tender, but the contracting authority is expected to have broad advertising, campaign and design competence, including services such as strategic consulting, creative concept development.Framework agreement for maintenance, repairs and redesign of furniture and fixtures
Oslo Kommune v/ Økonomi- Og ForvaltningsetatenOsloFrist: 02. Okt.Sub-contract 1 shall cover services concerning maintenance and minor repairs beyond the products ́ guarantee. This involves work that ensures that the furniture maintains its quality and functionality by wear or the like. The sub-contract is aimed at maintenance work that is generally carried out at the organisation without extensive disassembly and special parts etc. The services included in the sub-contract are not limited to, but can, for example, be the following: * Maintenance work * Simple repairs (minor damage, wear, loose parts etc.) * Spot removal and impregnation * Re-tensioning screws etc. * Cleaning and maintenance of textiles and surfaces * Condition Checks * Other related servicesParallel framework agreements for the purchase of crushed stone masses
Oslo kommune v/ Vann- og avløpsetatenOsloVAV needs different rock masses to refill buried ditches for excavations in connection with excavations in the pipeline network and new pipes at installations. VAV has a continual need for large quantities of crushed rock masses for this work. The agency will therefore enter into parallel framework agreements with several tenderers so that the agency ́s needs are fully covered. VAV will enter into parallel framework agreements with up to 4 (four) tenderers in Part 2 and Part 2, depending on how many tenders are received. The agency has an increasing need for crushed rock masses. The maximum value of the framework agreements (Part 1 and Part 2) is NOK 40,000,000 excluding VAT for the entire contract period, including options. The estimate was made based on historical figures and the expected future use in accordance with the Contracting Authority's best judgement. The specific call-offs depend on the department ́s changing need in the contract period. Emphasis is put on the fact that the contract does not carry any purchasing obligation for VAV. See Annex 1 Requirement Specifications and Annex 3 Price Form for further details.Framework agreement for digitalisation and technology.
MiljødirektoratetTrondheimFrist: 08. Sept.The Norwegian Environment Agency needs consultancy services within digitalisation and technology. Parallel framework agreements shall be signed for sub-areas 1. Development resources and 2. Specialist resources. Lot 2 is further divided into 2.1 Management and consultancy services, 2.2. Design, mapping and user experiences and 2.3. Architecture, data and analysis.2026/3377 - Parallel framework agreements for consultancy security for analysis and object security.
STATSBYGGOSLOFrist: 02. Okt.Statsbygg requests tenders for parallel framework agreements for consultancy security for analysis and object security: 3 parallel framework agreements will be signed on the basis of this competition as long as the competition provides the basis for this.Framework agreement for furniture and fixtures
Departementenes sikkerhets- og serviceorganisasjonOsloFrist: 31. Aug.The objective of the framework agreements is to facilitate conditions for cost efficient procurements of good design and high quality furniture, which at the same time are environmentally friendly and contribute to a circular economy for all ministries. It is necessary to procure office furniture such as panel furniture, office chairs, environment furniture and interior, including textiles and interior such as curtains, carpets, sound absorbers etc. and for facilitating functioning office work stations for all employees as well as supplementing the new government quarter. In addition furniture and interior shall also be procured for the Government's representation facility (including the Prime Minister ́s residence), commuter residences and foreign stations thereof. The list is not exhaustive. The procurement shall also include additional services such as interior architect services, repairs and maintenance, upgrading and drawing of existing furniture, as well as further mediation of existing furniture holding for reuse and securing optimum material recovery. The tenderer is required to offer the purchase of new furniture as well as leasing so that flexibility is taken care of when changing or moving to new areas/premises. The need will change in line with organisational changes. In addition it is important to be able to supplement or adapt furniture for changed needs at work. The estimated value of the procurement is from NOK 52,000,000 - 104,000,000 excluding VAT. The estimated value is not binding for the contracting authority. The contract will be valid for two (2) years, with an option to extend the contract for a further one (1) + one (1) year, to a total maximum of four (4) years.Parallel framework agreements for modernisation, installation, service and maintenance of a ventilation and comfort cooling system.
Oslobygg KFOsloFrist: 28. Sept.The framework agreement shall cover the contracting authority ́s total need for modernisation, installation, service and maintenance for ventilation in the contract period. Parallel framework agreements shall be signed with 4-7 tenderers. The framework agreements will be valid for 4 years. The assignment includes energy assessments of technical installations, modernisation, new installation, service and maintenance of ventilation and comfort cooling systems, cooling systems for computer rooms, refrigerating and freezing rooms, dampers, function control of kitchen extraction as well as heat pumps in Oslobygg KF ́s property portfolio. The objective of the agreement is to: * to fulfil the indoor climate and environment through economic and stable operation of technical installations. * maintaining the system ́s technical standard that contributes to a long lifetime. * environmentally friendly material use and low resource consumption, as well as low greenhouse gas emissions connected to transport
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 25. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Sandnes kommune.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.