IOMPhilippines
New construction of a multi-apartment residential building in Staryi Sambir
New construction of a multi-apartment residential building (completion of an unfinished construction project) at: 147 Dnistrova Street, Staryi Sambir, Sambir District, Lviv Oblast, Ukraine.
Wohnungsbau
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- IOM
- Veröffentlicht:
- 31. August 2026
- Frist:
- 25. September 2026
- Thema:
- Wohnungsbau
Ausschreibungsbeschreibung
New construction of a multi-apartment residential building (completion of an unfinished construction project) at: 147 Dnistrova Street, Staryi Sambir, Sambir District, Lviv Oblast, Ukraine.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
3 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Ähnliche Bekanntmachungen
9Major renovation of a non-residential building at Stryi, Lviv Oblast
IOMPhilippinesFrist: 10. Sept.REQUEST FOR PROPOSAL (RFP) Major renovation of a non-residential building located at 7 I. Mazepy Street, Stryi, Lviv OblastRefurbishment of existing municipal building to 2 number apartment units, and a rear first floor extension and all associated works.58 Mayorstone Drive Limerick.
Limerick City and County Council_103432Limerick.Frist: 09. Sept.This project consists of the part demolition and re construction, to include rear extension at first floor level ,a mixed living unit (note impacts on electrical and mechanical design) of 2 number residential apartment units. This development consists of demolition of existing roof of rear extension, construction of first floor above. Demolition of chimney and existing floor slab. The construction of first floor extension and completion of the existing envelope to current regulations, including the achievement of the Building to a BER of A2 or greater. In addition to this, ancillary site works comprising of connection of electrical services, footpaths, parking, boundary treatment and landscape works are proposedMulti-Party Framework Agreement for Minor Building Works Residential for Tipperary County Council
Tipperary County CouncilClonmel, NenaghFrist: 09. Okt.This is the Stage 1 process for the Establishment of a Multi-Party Framework Agreement for Minor Building Works Residential for Tipperary County Council. Further details will be provided at stage 2 of the process for tenderers who qualify to Stage 2. This initial Stage 1 is to determine tenderers who are suitably qualified to be added to this framework. Typically, the value of each Works Contract will range from 25k to approximately 400k. This framework has the potential to be established for 4years estimated from early Jan 2027 until end Dec 2030. The scope of the Framework will include any building works which may be required within any of the 5no. Municipal Districts of County Tipperary; 1. Nenagh District 2. Templemore-Thurles District 3. Cahir, Cashel, Tipperary District 4. Clonmel District 5. Carrick-on-Suir District. Works within this Framework may include but are not limited to general repairs, maintenance to the building fabric, roofing works, modifications for disability access, internal external modification and alterations to buildings, electrical works, plumbing, heating and mechanical system works, replacement of windows and internal and external doors, installation modification kitchens, floor coverings, painting and decorating, suspended ceiling works, dry‐lining, jointing and plastering, construction of small extensions, minor demolition works, clearance works in preparation for re‐letting re‐occupation, external site works such as driveways, steps, paths, fences and boundary walls, landscaping, drainage and residential waste and foul water treatment works. Dwellings Buildings may or may not be occupied.Construction of a new park area at the Queen Elizabeth Hospital in Barbados.
United Nations Office for Project Services (UNOPS)BridgetownFrist: 30. Sept.Construction of a new park area at the Queen Elizabeth Hospital in Barbados. UNOPS, on behalf of the Ministry of Health and Wellness (MHW) of Barbados, is implementing the Queen Elizabeth Hospital strengthening and improvement support project. As part of the implementation of the project, the objective of this Invitation to Bid (ITB) is to establish a Contract for the Construction of a new park area at the Queen Elizabeth Hospital in Barbados.Establishment of a Multi Supplier Framework of Construction Consultancy Services for Small and Minor Projects for the Buildings and Estates Office, UCC
University College CorkCorkFrist: 18. Sept.This Tender is to establish a multi supplier framework of Construction Consultancy Services for Small and Minor Works projects at University College Cork with a maximum of Six (6) participating teams to whom specific contracts may be awarded on a non-exclusive basis based on the terms of a framework agreement (the “Framework Agreement”), a copy of which will be issued with the tender documents. The construction consultancy services require to participate on the Framework will be procured on the basis of a single design team appointment. The team will comprise the following services. Architectural Services (including DAC and Planning and Landscaping Design Services Civil/Structural and Fire Engineering Services Mechanical and Electrical Engineering Services Project Supervisor Design Process (PSDP) Quantity Surveying Services Employer’s Representative The Framework Agreement will be established on foot of competitive tenders received for the above services based on Notional Hours and rates for various disciplines as detailed in the Pricing DocumentThe Design and Construction of the Clongriffin Lands Phase 2 (Zone 8, 9 and Creche), Dublin 13 (Pro426)
The Land Development AgencyDublinFrist: 05. Okt.The site is located at Clongriffin, Dublin 13. The Clongriffin Lands Phase 2 (Zone 8, 9 and Creche) project involves the construction of 263 apartments in Zone 8, 168 apartments in Zone 9, and a standalone creche building adjacent to Zone 9. Please refer to the Pre-Qualification Questionnaire for further details.Supply of new low-floor multi-section articulated Tramways 26-27 metres length, including a set of main, wearing and consumable spare parts, a set of equipment and tools for maintenance and repair, and related services, up to a total budget of €7,790,412.00 (seven million seven hundred ninety thousand four hundred twelve euros), sales taxes and customs duties excluded
Municipal Company "Dnipro Electrotransport"DniproFrist: 15. Okt.Supply of new low-floor multi-section articulated Tramways 26-27 metres length, associated goods and related services includes the supply of the following: - New low-floor multi-section articulated Tramways 26-27 metres length; - Documentation; - Maintenance and repair equipment and tools for the new low-floor multi-section articulated Tramways 26-27 metres length; - Main spare parts; - Consumable and wearable spare parts; - Commissioning of the new low-floor multi-section articulated Tramways 26-27 metres length and spare and maintenance parts, and initial maintenance (including starting up, if needed); - Personnel training. The price of the Goods shall be quoted on the basis of the latest in power edition of INCOTERMS delivery terms, published by the International Chamber of Commerce, Paris (EXW for Goods to be supplied from within the Contracting Authority’s country and CIP for Goods to be supplied from outside the Contracting Authority’s country). The required date of arrival of the first delivery on the Project Site is no later than: 36 weeks from the date of the advance payment receipt by the Supplier. The required completion date is no later than: 52 weeks from the date of the advance payment receipt by the Supplier. • A complete set of Tender Documents may be purchased on the submission of an application at the address below upon payment of a non-refundable fee of 200 EUR (two hundred euros), including VAT, or equivalent in Ukrainian hryvnias (UAH) at the National Bank of Ukraine exchange rate on the day of transfer. • Payment of this non-refundable fee is to be made by bank transfer: 1) For participants from Ukraine, payment is made in Ukrainian hryvnias (UAH) at the National Bank of Ukraine exchange rate on the day of transfer to the bank account: Beneficiary: MC “Dnipro electrotransport” EDRPOU code: 32616520 IBAN: UA763052990000026005050293360 Beneficiary bank: JSC CB "PRIVATBANK", 1D HRUSHEVSKOHO STR., KYIV, 01001, UKRAINE 2) For participants outside UkCfT for Construction of new Community Facility for use as a Men's and Women's Shed at Beckscourt View, Drumbannan, Bailieborough, Co. Cavan, A82 D928 for Cavan County Council.
Cavan County CouncilCavanFrist: 24. Sept.TEN2600157 - CfT for Construction of new Community Facility for use as a Men's Shed and Women's Shed, together with Alterations to Existing Building for Disabled WC Accommodation at Beckscourt View, Drumbannan, Bailieborough, Co. Cavan, A82 D928 for Cavan County Council. Please refer to Tender Documents for further details.IMT008/2025 - Tender for the Construction of a New Cargo Facility at Ras Hanzir between Laboratory and Fuel Wharves, Corradino, Grand Harbour, Malta.
Infrastructure MaltaLuqaFrist: 01. Okt.IMT008/2025 - Tender for the Construction of a New Cargo Facility at Ras Hanzir between Laboratory and Fuel Wharves, Corradino, Grand Harbour, Malta.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 25. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist IOM.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.