Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornTED
International Consultancy for the Development of off-grid Renewable Energy Projects Lot 2
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarb...
Digitalisierungsberatung, Unternehmensberatung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammen...
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH
- Veröffentlicht:
- 28. Juli 2026
- Frist:
- Nicht angegeben
- Thema:
- Digitalisierungsberatung
Ausschreibungsbeschreibung
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contribut
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
International Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria Lot 1
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contribut - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
International Consultancy for the Development of off-grid Renewable Energy Projects Lot 2
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
International Consultancy for the Development of off-grid Renewable Energy Projects Lot 2
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
International Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria Lot 1
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschborn
International Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria Lot 1
Short Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners. - NorecFØRDEFrist: 21. Aug.
Procurement of consultancy for the Evaluation of Energy Programming under the Civilian Component of the Nansen Program for Ukraine and Moldova
This evaluation focuses on outcomes and impacts in the energy sector, assessing the causal logic linking energy support to wider civilian outcomes within the Nansen Program Theory of Change, contribution pathways, cross-sector interactions, unintended effects, and the conditions under which different approaches may be sustained or expanded. Understanding how energy investments translate into broader resilience outcomes, and how they interact with Norwegian donor mechanisms and other portfolio elements, is essential for prioritization and resource allocation. Furthermore, since maintaining short-term system stability, protecting civilians, and advancing longer-term transition goals do not always align perfectly, the resulting trade-offs are central to understanding programming choices and outcomes. The evaluation covers the civilian component of the Nansen Support Program from its inception in February 2023 through July 2026. - Ministerie van Economische Zaken, Rijksdienst voor Ondernemend Nederland (RVO)Den Haag
Database containing information on renewable energy
The Contract concerns the supply of a database providing comprehensive coverage of both renewable energy sectors and existing energy sources. The database shall, at a minimum, include coverage of the following markets: • Wind Sector • Solar Sector • Gas Sector • Power Sector • Carbon Markets • Advanced Transport • Biofuels • Electrified Transport • Advanced Transport Infrastructure deployment • Natural Gas Vehicles • Energy Efficiency • Energy Storage • Smart Grid • Coal sector • Oil The data base has to cover at least the following continents • Europe • Middle east • Africa The data base has the contain features regarding the transitions for a sustainable future in the sectors mentioned below • Clean power • Transport • Buildings & Industry • Agriculture The complete discription can be found in the annex with this announcement The subscription to the database shall have an initial term of twelve (12) months), with an option to extend for an additional twelve (12) months under the same terms and conditions. The subscription shall provide access for seven (7) autorised users. - Norges vassdrags- og energidirektorat (NVE)OSLO
Framework agreement for consultancy services for the further development of NVE ́s GIS infrastructure based on Esri technology.
The Norwegian Water Resources and Energy Directorate (NVE) would like to enter into a framework agreement for assistance with various assignments for the further development of NVE ́s GIS infrastructure, which is based on Esri technology and platform. GIS is an abbreviation for Geographical Information Systems. - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 31. Aug.
Green Hydrogen Investments in India
GIZ provides consultancy to its partners through a wide array of methods. Most importantly, GIZ develops and implements solutions together with partners through close cooperation and process advisory. The project "Green Hydrogen Investments" (GH2I), implemented under the Indo-German Bilateral Development Cooperation by Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH on behalf of the German Federal Ministry for Economic Cooperation and Development (BMZ) and Ministry of New and Renewable Energy India (MNRE), contributes to a sustainable and inclusive energy transition towards climate neutrality by improving the policy, institutional and technical requirements for the use of green hydrogen in India"s hard-to-abate sectors. The goal of this specific tender is to support GIZ and its partners in achieving these goals. Green hydrogen is particularly important for energy-intensive industrial sectors, such as the iron, e-SAF and fertilizer industry among others, which cannot be efficiently and cost-effectively decarbonized with purely electricity-based technologies. The objective of the tender is to provide high-quality advisory services, ad hoc studies and policy and regulatory instrument proposals and designs in the context of gH2 in hard-to-abate sectors in India based on international experience. The contract offers support through studies in the space of green ports, green iron and steel, e-SAF and green public procurement. The assignment provides the project also with ten regulatory and policy instruments: Policy Instruments: - Framework for Green Hydrogen Demand Creation, e.g. covering sector-specific pathways for the gradual substitution of grey hydrogen in refineries and fertilisers, utilizing non-mandatory and phased market-aligned approaches, and aligning green public procurement with India"s broader decarbonisation goals (NDCs) - Infrastructure Planning Framework, e.g. covering strategic cluster formation, pilot design, RACI-based roles, and te - Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornFrist: 31. Aug.
Green Hydrogen Investments in India
GIZ provides consultancy to its partners through a wide array of methods. Most importantly, GIZ develops and implements solutions together with partners through close cooperation and process advisory. The project "Green Hydrogen Investments" (GH2I), implemented under the Indo-German Bilateral Development Cooperation by Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH on behalf of the German Federal Ministry for Economic Cooperation and Development (BMZ) and Ministry of New and Renewable Energy India (MNRE), contributes to a sustainable and inclusive energy transition towards climate neutrality by improving the policy, institutional and technical requirements for the use of green hydrogen in India"s hard-to-abate sectors. The goal of this specific tender is to support GIZ and its partners in achieving these goals. Green hydrogen is particularly important for energy-intensive industrial sectors, such as the iron, e-SAF and fertilizer industry among others, which cannot be efficiently and cost-effectively decarbonized with purely electricity-based technologies. The objective of the tender is to provide high-quality advisory services, ad hoc studies and policy and regulatory instrument proposals and designs in the context of gH2 in hard-to-abate sectors in India based on international experience. The contract offers support through studies in the space of green ports, green iron and steel, e-SAF and green public procurement. The assignment provides the project also with ten regulatory and policy instruments: Policy Instruments: - Framework for Green Hydrogen Demand Creation, e.g. covering sector-specific pathways for the gradual substitution of grey hydrogen in refineries and fertilisers, utilizing non-mandatory and phased market-aligned approaches, and aligning green public procurement with India"s broader decarbonisation goals (NDCs) - Infrastructure Planning Framework, e.g. covering strategic cluster formation, pilot design, RACI-based roles, an
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.