Herøy kommuneHerøyTED
Herøy Municipality - Framework agreement electric power for delivery 2027 - 2029
Physical delivery of approx. 4.5 - 5.3 GWh electric power per annum. Energy statistics. Billing the grid charge and fees. Energy statistics. Guarantee of origin.
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Herøy kommune
- Veröffentlicht:
- 06. August 2026
- Frist:
- 07. September 2026
Ausschreibungsbeschreibung
Physical delivery of approx. 4.5 - 5.3 GWh electric power per annum. Energy statistics. Billing the grid charge and fees. Energy statistics. Guarantee of origin.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0000
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Herøy kommune - Framework agreement electric power for delivery 2027 - 2029
Herøy kommuneHerøyFrist: 07. Sept.Physical delivery of approx. 4.5 - 5.3 GWh electric power per annum. Energy statistics. Billing the network charge and fees. Energy statistics. Guarantee of origin.Framework Agreement for the delivery of Emergency Power Systems - Lot 2
50Hertz Transmission GmbHBerlinLot 2 includes the delivery of emergency power systems (20kVA and 50kVA) with a volume of 40%.Framework Agreement for the Delivery of Emergency Power Systems 50Hertz Transmission
50Hertz Transmission GmbHBerlinThe Services include the design engineering / supply / FAT / delivery / unloading on foundation and commissioning of “Emergency Power Systems” 20kVA and 50kVA including all accessories to substations as well as any related services to TSO’s Onshore and/or Offshore substations as described in the contractual documents. Estimated quantities for the framework agreement term across all types of emergency power systems are for lot 1 26 units/containers (maximum 52 units) and for lot 2 18 units/containers (maximum 36 units). However, there is no volume commitment. Further information can be obtained from the tender documents.Framework agreement for the development of the Panda model
Møre og Romsdal FylkeskommuneMOLDEThe aim of the procurement is to enter into a framework agreement for consultancy services for the development of the Panda model. The contract will be valid for 2 years, with an option for an extension for 1+1 year. The contract has an estimated value of approx. NOK 4,000,000 excluding VAT (approx. NOK 1,000,000 per annum in the contract period). The contract value is estimated and the contracting authority is not bound by this, as the contracting authority ́s need can vary from year to year. See the assignment ́s description for further information (Annex 2) and the Requirement Specifications (Annex 3).Framework agreement for the purchase of CO2 for water treatment
Oslo kommune v/ Vann- og avløpsetatenOsloThe Agency for Water and Sewerage Works (VAV) needs to deliver CO2 that is used for water treatment at VAV ́s facilities. VAV shall enter into a new framework agreement for CO2 for the facilities at Oset and Skullerud. The need for CO2 delivered to the plants is estimated to be approx. 2,800 tonnes per annum, divided in approx. 2,500 tonnes at Oset and approx. 300 tonnes at Skullerud VBA. The consumption is evenly distributed throughout the year. The stated volume is estimated from the current consumption and is only meant as information to tenderers. From 2028 it is expected that consumption at Oset will be reduced. The extent of this is uncertain. Tenderers shall also offer maintenance/service of the CO2 plant and gas safety courses. A site inspection will be held, see the tender documentation point 3.2 for further information.Framework Agreement for the Delivery of Control Systems (IEC104) and the Provision of related services
TenneT TSO GmbHBayreuthFrist: 30. JuniFramework Agreement for the Delivery of Control Systems (IEC104) and the Provision of related services TenneT is a leading European transmission system operator responsible for the safe and reliable transmission of electrical energy over long distances. TenneT’s core tasks include the expansion and maintenance of the transmission grid, the integration of renewable energy sources, and the assurance of grid stability. TenneT’s grid area covers large parts of Germany and the Netherlands and includes both onshore and offshore connections. As an operator of critical infrastructure, the security and reliability of the systems in use are of particular importance. The aim of this tender is the establishment of two framework agreements for the procurement of substation Control Systems, in particular Intelligent Electronic Devices (IEDs) and field control units, for use in TenneT TSO GmbH’s (TTG) high‑voltage and extra‑high‑voltage substations. The systems to be procured are intended for control, monitoring, signalling and automation purposes within substations and are a key element of secure and reliable grid operation. Within the scope of this tender, TTG intends to procure Control System components including, but not limited to, bay control units, station control units, interface devices, and related auxiliary equipment. A central focus of the procurement is the use of the communication protocol IEC 60870‑5‑104 (IEC 104) for the exchange of control, status and measurement data between the substation level and higher‑level control systems. The devices shall support typical substation automation functions, reliable IEC 104 communication, and seamless integration into existing station control concepts in accordance with applicable technical standards. The subject of this tender is the supply of Control Systems hardware, including IEDs and associated components, as well as related documentation and services necessary for commissioning and integration into TTG’s substations. The framework agreement shall enable TTG to call off devices on demand over the contract term for new installations, refurbishments, and replacement purposes. Parallel to the hardware framework agreement, TTG intends to conclude a separate service contract covering the maintenance of the devices and the maintenance of embedded software, including corrective and preventive measures as well as software updates and upgrades, in accordance with the contractual provisions. Due to increasing requirements regarding system availability and redundancy, the procurement procedure is structured into two lots, which will be awarded separately. The lot structure is intended to ensure supply security, operational resilience and redundancy of the Control Systems deployed within TTG’s transmission grid. TenneT TSO GmbH is certified according to ISO 27001. Therefore, only Control Systems and equipment that comply with TTG’s Operational Technology security requirements may be offered (OT security and IT security requirements). Tender Documents To participate in the tender, please complete the Non‑Disclosure Agreement below and send it via email to: [email protected] Access to the additional tender documents will be granted immediately upon receipt and review of the document. TenneT TSO GmbH will treat the documents you submit and the trade and business secrets contained therein as confidential in accordance with Section 5 of the Sector Ordinance.International Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria Lot 1
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornShort Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners.International Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria Lot 1
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornShort Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners.Framework agreement for asphalt works, operation and maintenance.
Bodø KommuneBODØFrist: 31. JuliThe aim of the procurement is to enter into a framework agreement with one tenderer for the delivery and laying of asphalt on municipal roads and areas in Bodø municipality. The contract shall ensure the delivery of asphalt work as a comprehensive service, including all necessary work, including preparatory works, asphalting, compaction and clearing up after work has been carried out. The framework agreement will be valid for 2 years, with an option to extend the framework agreement for a further 1+1 year, to a total maximum of four years. The estimated value of the framework agreement is between NOK 28 million and NOK 29 million excluding VAT per annum. This is equivalent to between NOK 112 million and NOK 116 million excluding VAT for the entire contract period of maximum four years (including options). The maximum financial limit for the framework agreement (including options) is NOK 150 million excluding VAT. See the requirement specifications, point 2.2 part 2 and annex 1 for further information on the contract's extent and content.SPD2/2026/013 - FRAMEWORK CONTRACT FOR THE SUPPLY, DELIVERY AND INSTALLATION OF SEVENTY-TWO (72) LEASED ENERGY-EFFICIENT PRINTERS AND MULTIFUNCTION DEVICES, INCLUDING A FULL SERVICE AND MAINTENANCE AGREEMENT (FSMA), FOR IDENTITÀ
Department of ContractsFlorianaFrist: 07. Sept.SPD2/2026/013 - FRAMEWORK CONTRACT FOR THE SUPPLY, DELIVERY AND INSTALLATION OF SEVENTY-TWO (72) LEASED ENERGY-EFFICIENT PRINTERS AND MULTIFUNCTION DEVICES, INCLUDING A FULL SERVICE AND MAINTENANCE AGREEMENT (FSMA), FOR IDENTITÀ
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 07. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Herøy kommune.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.