Trianel Energieprojekte GmbH & Co. KGAachenTED
Framework agreement for delivery and service of battery storage projects in Germany for Trianel Energieprojekte GmbH & Co. KG
TEP is looking for up to six framework agreement partners as suitable suppliers for the supply of the core components consisting in particular of battery storage, battery inverter, transformer station and battery management system (BMS) and power plant controller. The supplier is also responsible for the commissioning of the components it...
Generatoren, Verfahrenstechnik
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Trianel Energieprojekte GmbH & Co. KG
- Veröffentlicht:
- 16. August 2026
- Frist:
- 14. September 2026
- Thema:
- Generatoren
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
TEP is looking for up to six framework agreement partners as suitable suppliers for the supply of the core components consisting in particular of battery storage, battery inverter, transformer station and battery management system (BMS) and power plant controller. The supplier is also responsible for the commissioning of the components it supplies. In addition, a long-term service contract is to be awarded, which includes warranty extensions and is intended to ensure the performance of the system. After successful participation in the participant competition, selected companies will be invited to submit bids on the basis of a project profile including performance requirements and a term sheet. During the bidding phase (following the conclusion of the prequalification process), bidders are required to provide cost estimates for two specific projects. TEP intends to award these specific projects directly to the best bidder(s) upon awarding the framework agreement. However, TEP also reserves the right not to award the projects to be costed, but rather to use them solely as a basis for selection when awarding up to six framework agreements, based on the award criteria. Consequently, there is no entitlement to be awarded a contract. Project No. 1 is located in Mecklenburg-Western Pomerania with a volume of 100 MW / 400 MWh. Project No. 2 is located in North Rhine-Westphalia with a volume of 20 MW / 40 MWh. TEP reserves the right to transfer call-offs or individual orders placed under the framework agreements to affiliated legal entities. This means that TEP will not necessarily be the contracting party for the individual orders placed under the framework agreements. This applies to subsidiaries of Trianel GmbH, of Trianel Flexibilitätsprojekte GmbH & Co. KG or Trianel Energieprojekte GmbH & Co. KG that are yet to be established, as well as the following companies affiliated with TEP: - TEP Amphitrite GmbH & Co. KG - TEP Arkas GmbH & Co. KG - TEP AT GmbH - TEP Bellona GmbH & Co. KG - TEP Epsilon GmbH & Co. KG - TEP Eunomia GmbH & Co. KG - TEP Fortuna GmbH & Co. KG - TEP Irene GmbH & Co. KG - TEP Kalliope GmbH & Co. KG - TEP Lutetia GmbH & Co. KG - TEP Massalia GmbH & Co. KG - TEP Netze GmbH & Co. KG - TEP Thalia GmbH & Co. KG - TEP Themis GmbH & Co. KG - TEP Vesta GmbH & Co. KG - TEP Victoria GmbH & Co. KG - Infrastruktur Kamerland GmbH & Co. KG - TAP Windprojekte GmbH & Co. KG Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition. The actual demand-or the scale of the framework agreements to be awarded-is difficult to forecast, particularly due to the unpredictability of the required battery storage capacity. Based on the estimated demand volumes, the total volume under the framework agreement is estimated to be approximately 8 GWh over the contract term of up to eight years. The maximum volume applicable under the framework agreement is 10 GWh.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten49 Angaben erfasstUnterlagen
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten6 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Framework agreement for delivery and service of battery storage projects in Germany for Trianel Energieprojekte GmbH & Co. KG
Trianel Energieprojekte GmbH & Co. KGAachenTEP is looking for up to six framework agreement partners as suitable suppliers for the supply of the core components consisting in particular of battery storage, battery inverter, transformer station and battery management system (BMS) and power plant controller. The supplier is also responsible for the commissioning of the components it supplies. In addition, a long-term service contract is to be awarded, which includes warranty extensions and is intended to ensure the performance of the system. After successful participation in the participant competition, selected companies will be invited to submit bids on the basis of a project profile including performance requirements and a term sheet. During the bidding phase (following the conclusion of the prequalification process), bidders are required to provide cost estimates for two specific projects. TEP intends to award these specific projects directly to the best bidder(s) upon awarding the framework agreement. However, TEP also reserves the right not to award the projects to be costed, but rather to use them solely as a basis for selection when awarding up to six framework agreements, based on the award criteria. Consequently, there is no entitlement to be awarded a contract. Project No. 1 is located in Mecklenburg-Western Pomerania with a volume of 100 MW / 400 MWh. Project No. 2 is located in North Rhine-Westphalia with a volume of 20 MW / 40 MWh. TEP reserves the right to transfer call-offs or individual orders placed under the framework agreements to affiliated legal entities. This means that TEP will not necessarily be the contracting party for the individual orders placed under the framework agreements. This applies to subsidiaries of Trianel GmbH, of Trianel Flexibilitätsprojekte GmbH & Co. KG or Trianel Energieprojekte GmbH & Co. KG that are yet to be established, as well as the following companies affiliated with TEP: - TEP Amphitrite GmbH & Co. KG - TEP Arkas GmbH & Co. KG - TEP AT GmbH - TEP Bellona GmbH & Co. KG - TEP Epsilon GmbH & Co. KG - TEP Eunomia GmbH & Co. KG - TEP Fortuna GmbH & Co. KG - TEP Irene GmbH & Co. KG - TEP Kalliope GmbH & Co. KG - TEP Lutetia GmbH & Co. KG - TEP Massalia GmbH & Co. KG - TEP Netze GmbH & Co. KG - TEP Thalia GmbH & Co. KG - TEP Themis GmbH & Co. KG - TEP Vesta GmbH & Co. KG - TEP Victoria GmbH & Co. KG - Infrastruktur Kamerland GmbH & Co. KG - TAP Windprojekte GmbH & Co. KG Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition. The actual demand-or the scale of the framework agreements to be awarded-is difficult to forecast, particularly due to the unpredictability of the required battery storage capacity. Based on the estimated demand volumes, the total volume under the framework agreement is estimated to be approximately 8 GWh over the contract term of up to eight years. The maximum volume applicable under the framework agreement is 10 GWh.Framework agreement for delivery and service of battery storage projects in Germany for Trianel Energieprojekte GmbH & Co. KG
Trianel Energieprojekte GmbH & Co. KGAachenFrist: 14. Sept.TEP is looking for up to six framework agreement partners as suitable suppliers for the supply of the core components consisting in particular of battery storage, battery inverter, transformer station and battery management system (BMS) and power plant controller. The supplier is also responsible for the commissioning of the components it supplies. In addition, a long-term service contract is to be awarded, which includes warranty extensions and is intended to ensure the performance of the system. After successful participation in the participant competition, selected companies will be invited to submit bids on the basis of a project profile including performance requirements and a term sheet. During the bidding phase (following the conclusion of the prequalification process), bidders are required to provide cost estimates for two specific projects. TEP intends to award these specific projects directly to the best bidder(s) upon awarding the framework agreement. However, TEP also reserves the right not to award the projects to be costed, but rather to use them solely as a basis for selection when awarding up to six framework agreements, based on the award criteria. Consequently, there is no entitlement to be awarded a contract. Project No. 1 is located in Mecklenburg-Western Pomerania with a volume of 100 MW / 400 MWh. Project No. 2 is located in North Rhine-Westphalia with a volume of 20 MW / 40 MWh. TEP reserves the right to transfer call-offs or individual orders placed under the framework agreements to affiliated legal entities. This means that TEP will not necessarily be the contracting party for the individual orders placed under the framework agreements. This applies to subsidiaries of Trianel GmbH, of Trianel Flexibilitätsprojekte GmbH & Co. KG or Trianel Energieprojekte GmbH & Co. KG that are yet to be established, as well as the following companies affiliated with TEP: - TEP Amphitrite GmbH & Co. KG - TEP Arkas GmbH & Co. KG - TEP AT GmbH - TEP Bellona GmbH & Co. KG - TEP Epsilon GmbH & Co. KG - TEP Eunomia GmbH & Co. KG - TEP Fortuna GmbH & Co. KG - TEP Irene GmbH & Co. KG - TEP Kalliope GmbH & Co. KG - TEP Lutetia GmbH & Co. KG - TEP Massalia GmbH & Co. KG - TEP Netze GmbH & Co. KG - TEP Thalia GmbH & Co. KG - TEP Themis GmbH & Co. KG - TEP Vesta GmbH & Co. KG - TEP Victoria GmbH & Co. KG - Infrastruktur Kamerland GmbH & Co. KG - TAP Windprojekte GmbH & Co. KG Further information can be found in the procurement documents that will be issued after the conclusion of the participation competition. The actual demand-or the scale of the framework agreements to be awarded-is difficult to forecast, particularly due to the unpredictability of the required battery storage capacity. Based on the estimated demand volumes, the total volume under the framework agreement is estimated to be approximately 8 GWh over the contract term of up to eight years. The maximum volume applicable under the framework agreement is 10 GWh.Framework agreement for the hire of project resources in construction management and control engineer disciplines, as well as project engineers.
Bane NOR SFHAMARFrist: 27. Aug.4-6 parallel framework agreements shall be signed for the hire of project resources. The project resources shall function as construction managers, control engineers and project engineers. The framework agreement will be signed for 2 years with a total of 6 options for 1 year. The maximum length is 8 years. The maximum value of all call-offs during the framework agreement period (up to 8 years) is NOK 800,000,000. Excluding VAT.Framework agreement for the procurement of hardware for Folketrygdfondet
FolketrygdfondetVikaFramework agreement for the procurement of IT equipment (PCs, monitors, periphery and meeting room equipment) Procedure: Restricted tender contest (two stage) - FOA part III Framework agreement: 3 years + option 1 year Parallel framework agreements: 2 tenderers Mini competition: list price > NOK 200,000 The aim is to establish parallel framework agreements with 2 tenderers for ongoing procurements of IT equipment for approx. 65 employees and approx. 10 meeting rooms divided between locations in Oslo and Tromsø. The contracting authority aims at limiting the number of mini competitions to one (1) per annum, but there may be a need for several. Call-offs will be made if needed. Mini competitions are used as a main rule for call-offs where the total list price exceeds NOK 200,000 excluding VAT, but the Contracting Authority reserves the right to use mini-competitions for minor procurements as well. In case of individual call-offs that do not trigger mini competitions, call-offs will be awarded to the tenderer who is ranked as no. 1 in the framework agreement ́s award. If a tenderer ranked as no. 1 cannot deliver within the framework agreement ́s terms, call-offs can be awarded to the tenderer ranked as no. 2.Framework agreement for electrical services including materials - Sub-contract
Strand KommuneJØRPELANDFrist: 17. Aug.Strand and Hjelmeland municipalities shall enter into a two year framework agreement for the purchase of electrical services with the accompanying material, with an option for a further 1+1 year extension. The framework agreement will be used for the execution of electrical services in the municipalities ́ buildings, green areas, lighting installations outside/inside - both in connection with operation and maintenance as well as in projects where the contracting authority deems it appropriate. The contracting authority intends to enter into a framework agreement with up to two tenderers, provided that qualified and suitable tenders are received. The distribution of assignments under the framework agreement will be as follows: Tenderer no. 1: 60% of the number of assignments Supplier no. 2: 40% of the assignment quantity The framework agreement is divided into two sub-contracts. Tenderers can submit a tender for one of the municipalities or both: Strand kommuneHjelmeland kommuneFramework agreement for project support EU finances
NTNUTrondheimFrist: 14. Aug.Participation in the EU's framework programme for research and innovation is a high priority activity at NTNU. This applies to both the current framework programme - Horizon Europe and the next framework programme, which shall start in 2028. Participation will take place in the form of projects that receive financial support from the EU. The projects must follow the terms given in the EU guidelines for the different project types. This includes financial guidelines. At the same time, we must ensure compliance with the guidelines that generally apply for NTNU. The financial monitoring of the projects involves responsibility for following up the finances in the project life cycle, from application to completed project. NTNU has its own routines and templates for financial reporting to the EU and internal status reports. For applications and projects that have several partners and coordinated by NTNU, follow-up also involves follow-up of partners' budgeting and reporting. Clear and understandable communication towards internal and external target groups is significant in all project phases. NTNU has its own personnel (project economists) who carry out these assignments, but NTNU will need to supplement with external resources. The need can vary over time. The offered resources must be able to handle a portfolio of applications and projects. The portfolio will usually belong to one or several organisational entities at NTNU. Other more limited assignments may also be relevant. See Annex 1, the contracting authority ́s requirement specifications, for further information on which services/work assignments the framework agreement covers. A framework agreement shall be signed with one tenderer. The contract will start as soon as possible after the award of contract. The contract will be valid for 2 years, with an option for an extension for 1+1 year, for a total of up to 4 years.Framework Agreement for Property Management Services and the award of initial contracts for the Provision of Property Management Services in Leinster, Munster and Connacht/Ulster
National Transport Authority_1149DublinFrist: 07. Sept.The Authority is looking to appoint suitably qualified contractors to a framework agreement for Property Management Services (management of various properties). The framework agreement is envisaged to last for a period of 8 years with a scope of services to include but not be limited to the following : • all necessary mobilisation activities to prepare for the performance of the Services; • development and maintenance of asset registers; • development and maintenance of a computer-aided facilities management system; • development of annual maintenance plans; • planned preventative maintenance (including cleaning and pest control) of buildings, facilities, plant and equipment, landscaping, and winterisation activities in accordance with the annual maintenance plan; • corrective maintenance (including cleaning and repair of vandalism damage) of buildings, facilities, plant and equipment as required to ensure continued operation of the facility at the property; • planned and corrective maintenance of bus stops, including platforms, shelters and bus poles and flags (including cleaning and repair of vandalism damage); • maintenance of records and reports; • all necessary demobilisation activities to prepare for the handover of the Services to a subsequent supplier. The value of purchases pursuant to the Framework Agreement is expected to be €22,871,380 (excluding VAT). However, there is a reasonable likelihood that similar requirements could be required to support other new bus routes and bus depot facilities which are unknown at this time and thus the total value of purchases pursuant to the Framework Agreement may be up to a maximum of €26,302,086 (excluding VAT) over the duration of the Framework Agreement. These figures are provided for indicative purposes only and there is no guaranteed expenditure under the Framework Agreement. As part of this procurement process , the Authority is also seeking to award three Initial Contracts in conjunction with award of the FrameEstablishment of a Multi Supplier Framework of Construction Consultancy Services for Small and Minor Projects for the Buildings and Estates Office, UCC
University College CorkCorkFrist: 18. Sept.This Tender is to establish a multi supplier framework of Construction Consultancy Services for Small and Minor Works projects at University College Cork with a maximum of Six (6) participating teams to whom specific contracts may be awarded on a non-exclusive basis based on the terms of a framework agreement (the “Framework Agreement”), a copy of which will be issued with the tender documents. The construction consultancy services require to participate on the Framework will be procured on the basis of a single design team appointment. The team will comprise the following services. Architectural Services (including DAC and Planning and Landscaping Design Services Civil/Structural and Fire Engineering Services Mechanical and Electrical Engineering Services Project Supervisor Design Process (PSDP) Quantity Surveying Services Employer’s Representative The Framework Agreement will be established on foot of competitive tenders received for the above services based on Notional Hours and rates for various disciplines as detailed in the Pricing DocumentNRK 2026-504 Framework agreement for the hire of equipment and the procurement of services - lighting, sound, AV
Norsk rikskringkasting ASOSLOFrist: 19. Aug.NRK would like to establish a new parallel framework agreement for the hire of equipment and the procurement of services within lighting, sound and AV. One tenderer will be awarded the status of A-supplier. Other tenderers awarded the contract will be ranked in accordance with the evaluation criteria. NRK will hold mini competitions each year for the framework agreement for the award of productions with an estimated budget of more than NOK 1 million for the disciplines covered by the framework agreement. The framework agreement is for delivery to all of NRK, regardless of production type or genre, and includes both small and large productions nationwide. The tenderer who is given the status of A-supplier will be NRK's primary equipment supplier for productions within the contract ́s scope, with the exception of productions with an estimated budget of NOK 1 million, awarded after the annual mini-competition. The contract period is 2+1+1 years and the total value is currently limited to NOK 60 million.Framework Agreement for Property Management Services and the Award of Three Initial Contracts for the Provision of Property Management Services in Leinster, Munster and Connacht/Ulster
National Transport Authority_1149DublinFrist: 07. Sept.The Authority is looking to appoint suitably qualified contractors to a framework agreement for Property Management Services (management of various properties). The framework agreement is envisaged to last for a period of 8 years with a scope of services to include but not be limited to the following : • all necessary mobilisation activities to prepare for the performance of the Services; • development and maintenance of asset registers; • development and maintenance of a computer-aided facilities management system; • development of annual maintenance plans; • planned preventative maintenance (including cleaning and pest control) of buildings, facilities, plant and equipment, landscaping, and winterisation activities in accordance with the annual maintenance plan; • corrective maintenance (including cleaning and repair of vandalism damage) of buildings, facilities, plant and equipment as required to ensure continued operation of the facility at the property; • planned and corrective maintenance of bus stops, including platforms, shelters and bus poles and flags (including cleaning and repair of vandalism damage); • maintenance of records and reports; • all necessary demobilisation activities to prepare for the handover of the Services to a subsequent supplier. The value of purchases pursuant to the Framework Agreement is expected to be €22,871,380 (excluding VAT). However, there is a reasonable likelihood that similar requirements could be required to support other new bus routes and bus depot facilities which are unknown at this time and thus the total value of purchases pursuant to the Framework Agreement may be up to a maximum of €26,302,086 (excluding VAT) over the duration of the Framework Agreement. These figures are provided for indicative purposes only and there is no guaranteed expenditure under the Framework Agreement. As part of this procurement process , the Authority is also seeking to award three Initial Contracts in conjunction with award of the Frame
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 14. September 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Trianel Energieprojekte GmbH & Co. KG.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.