Tipperary County CouncilClonmel, NenaghTED
Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
The OPW, working with Tipperary County Council, identified Nenagh as an Area for Further Assessment in the Shannon CFRAM Study. A flood relief scheme is to be developed. Tipperary County Council intends to commission a Consultant to progress Engineering and Environmental elements of the Tender Specification. The objective is the identific...
Tiefbauplanung, Umweltgutachten, Baugrundgutachten, Lärmgutachten, Wasserwirtschaft
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Tipperary County Council
- Veröffentlicht:
- 24. Juni 2026
- Frist:
- 19. August 2026
- Thema:
- Tiefbauplanung
Ausschreibungsbeschreibung
The OPW, working with Tipperary County Council, identified Nenagh as an Area for Further Assessment in the Shannon CFRAM Study. A flood relief scheme is to be developed. Tipperary County Council intends to commission a Consultant to progress Engineering and Environmental elements of the Tender Specification. The objective is the identification, design and submission for planning consent of a Flood Relief Scheme to alleviate flood risk in Nenagh, complete detailed design, and procure, manage and oversee construction.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten3 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
9Civil and Structural Engineering Consultancy Services (Design) and PSDP Consultancy for Monaghan Blackwater Sluices Access Design
Office of Public Works (OPW)TrimFrist: 17. Aug.To design improved access infrastructure to 22no sluices (non-return valves) located within the Monaghan Blackwater Arterial Drainage Flood Relief Scheme in Co. MonaghanEngineering Technical Consultancy Services for the Thurles Inner Relief Road
Tipperary County CouncilClonmel, NenaghFrist: 13. Aug.Tipperary County Council benötigt technische Beratungsleistungen eines multidisziplinären Teams für die Weiterentwicklung der Thurles Inner Relief Road. Dies umfasst die Überprüfung vorhandener Dokumente, die Fertigstellung ausstehender Leistungen für die Phasen 3 und 4 sowie die Erstellung aller Leistungen für die Phasen 5 bis 7 gemäß den Infrastructure Guidelines und dem Technical Appraisal Framework.Provision for Design Consultancy Services for New Learning and Development Centre Nenagh Co. Tipperary
Tipperary County CouncilClonmel, NenaghFrist: 28. Aug.Provision for Design Consultancy Services for New Learning and Development Centre Nenagh Co. TipperarySE-26-01 Engineering design services surface water for flood protection
Sel kommuneENGERDALFrist: 08. JuniStor-Elvdal municipality intends to enter into a contract for detailed engineering design services for surface water measures in the centre of Otta. As NVE ́s main contract for flood protection has anticipated start-up 2028/29, the engineering design services shall facilitate for the municipal surface water pipelines to be completed and put into operation before the flood protection system is in place, where such a solution is appropriate. The strategy means that the pipeline network is to be built with temporary outlets to the river, but is prepared for future connection in NVE ́s pump stations. It must be seen with close interaction with NVE and their consultants in order to have engineered systems that are feasible in relation to future flood protection. Tenderers shall use their expertise and competence to contribute to fulfilling the aim of the contract.Single Service Provider Engineering Led Multi-Disciplinary Design Team PSDP Employer Representative for Macroom South Square and Masseytown Renewal
Cork County CouncilCorkCork County Council seeks to appoint a Single Service Provider Engineering Led Multi-Disciplinary Design Team PSDP Employers Representative to complete Stages 2 to 5 for the concurrent delivery of Macrooms South Square and Masseytown Renewal schemes.Engineering and Environmental Services for Barrier Mitigation Programme LyreLane Bundle
Inland Fisheries IrelandDublinFrist: 24. Aug.Inland Fisheries Ireland is seeking to procure multidisciplinary consultancy services to assist with the delivery of 2 proposed Barrier Mitigation Projects, Lyre Bridge and Glenshelane Weir in County Waterford, through the completion of Phases 1 to 3. The appointed Consultant will undertake all necessary engineering, environmental and planning services required to progress the project through feasibility, option selection, and statutory consent stages in accordance with the Planning and Development Acts 2000–2023, the Capital Works Management Framework, and Infrastructure Guidelines 2023. The Barrier Mitigation Projects aim to mitigate the impacts of the identified barriers on fish passage and restore more natural river processes along the associated rivers. The commission forms a specific action under Ireland’s Water Action Plan 2024 and supports implementation of the National Barrier Mitigation Programme to deliver improved ecological status under the EU Water Framework Directive. The Consultant will act as the Designer, Project Supervisor Design Process during all Phases of the project and carry out all related necessary duties.Framework agreement for consultancy engineering services
Sunnhordland Innkjøpsforum v/Bømlo kommuneBremnesSunnhordland Innkjøpsforum, on behalf of Bømlo, Stord, Fitjar, Kvinnherad and Tysnes municipalities, invites tenderers to a competition for a framework agreement for consulting engineering services. The agreement shall ensure flexible and predictable access to the necessary competence for planning, engineering design services and follow-up of building and construction projects. The framework agreement includes the entire project course - from early needs clarification and concept phase, via the preliminary project and detailed project, to the construction phase, commissioning, taking over and claims follow-up. The assignments will vary in nature, length and complexity, from smaller individual assignments to large projects and can be carried out parallel to several locations. The contract shall be able to cover simultaneous assignments for several business areas and locations in the region, and shall, thus, also handle capacity variations over time.Multi-Party Framework Agreement for provision of Engineering Consultancy and PSDP Services for Building Services Projects (2026-2030)
Cork City CouncilCorkFrist: 27. JuliMulti-Party Framework Agreement for provision of Engineering Consultancy and PSDP Services for Building Service Projects associated with Civil, Structural, Architectural, Mechanical and Electrical Design Disciplines (2026-2030). To assist in achieving the obligations and targets as indicated above, the Council is now seeking to establish a Framework of suitably competent Engineering Consultants to deliver Civil, Structural, Architectural, Mechanical and Electrical (CSA and M+E) technical consultancy services. These services will be related, but not limited to, building decarbonisation, energy efficiency upgrades, heat pump integration, building services optimisation, PV feasibility, electrical upgrades, BMS strategy, and related technical advisory across the Local Authority’s building stock.Consultancy services for buildings and properties - Consultant engineer for fire (RIBr)
INNLANDET FYLKESKOMMUNEHAMARFrist: 21. Aug.The objective of the procurement is to enter into a framework agreement for consultancy services for buildings and property for the discipline; consulting engineer for fire (RIBr). This ensures that the county has sufficient capacity and good competence for the execution of small and large projects. The framework agreement shall apply for all of Innlandet County and the assignments will be spread throughout Innlandet County.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 19. August 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Tipperary County Council.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.