Ministerie van Economische Zaken, Rijksdienst voor Ondernemend Nederland (RVO)Den HaagTED
Database containing information on renewable energy
The Contract concerns the supply of a database providing comprehensive coverage of both renewable energy sectors and existing energy sources. The database shall, at a minimum, include coverage of the following markets: • Wind Sector • Solar Sector • Gas Sector • Power Sector • Carbon Markets • Advanced Transport • Biofuels • Electrified T...
Softwarelizenzen
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Ministerie van Economische Zaken, Rijksdienst voor Ondernemend Nederland (RVO)
- Veröffentlicht:
- 02. Juli 2026
- Frist:
- Nicht angegeben
- Thema:
- Softwarelizenzen
Ausschreibungsbeschreibung
Vollständige Beschreibung anzeigenBeschreibung einklappen
The Contract concerns the supply of a database providing comprehensive coverage of both renewable energy sectors and existing energy sources. The database shall, at a minimum, include coverage of the following markets: • Wind Sector • Solar Sector • Gas Sector • Power Sector • Carbon Markets • Advanced Transport • Biofuels • Electrified Transport • Advanced Transport Infrastructure deployment • Natural Gas Vehicles • Energy Efficiency • Energy Storage • Smart Grid • Coal sector • Oil The data base has to cover at least the following continents • Europe • Middle east • Africa The data base has the contain features regarding the transitions for a sustainable future in the sectors mentioned below • Clean power • Transport • Buildings & Industry • Agriculture The complete discription can be found in the annex with this announcement The subscription to the database shall have an initial term of twelve (12) months), with an option to extend for an additional twelve (12) months under the same terms and conditions. The subscription shall provide access for seven (7) autorised users.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0000
Verfahrensdaten
Freischalten6 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Referenz des Auftraggebers · Verfahrensart · +2 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten2 Angaben erfasstBieter und Auftragnehmer · Anschrift
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
5International Company Information Database
VerohallintoVeroThe Finnish Tax Administration is preparing a procurement of an online database of international company information, including a set of tools for analyzing the data. The solution shall include a global database for international companies and entities. Customer shall retrieve information, data and reports with common web-browsers (Chrome, Edge). The usage of the solution does not require installing any application software. The database must be a Software as a Service (SaaS). The service is for 35 concurrent users. All departments of the Customer can use the products listed for different purposes ranging from anti money laundering and know your customer (AML/KYC), transfer pricing, audit, tax fraud and investigation. The database must include financial and ownership data of at least 100 000 000 enterprises and detailed financial and ownership data of at least 10 000 000 enterprises on all continents. The database includes general financial and ownership information, such as name, address, company identifiers, turnover, net income and shareholders on at least 100 000 000 enterprises worldwide. The database includes detailed financial and ownership information on at least 10 000 000 enterprises worldwide. The solution shall be available 24/7. Usability for an office time (Helsinki (UTC + 2:00) 08.00-16.00) is at least 99% and at least 96% out of office time. The solution includes a global database for international companies and entities including ownership and financial data. The data must be up to date and updated frequently. It must have possibility to conduct and build precise single and mass searches. It must have MS Excel integration and possibility to export data into Excel. The tool shall provide comparability analysis for Transfer Pricing purposes, including loans, royalties and commodities information. Also peer comparison (key figures compared to peer group's figures) are needed. The offered price shall include all mandatory requirements, support and training by the supplier. Travel expenses shall not be paid separately. The Contract shall remain in effect for four (4) years as a fixed-term contract after which the Contract will automatically remain in effect until further notice.2026/023 The supply of commercially published Business Information/Market Research Databases available electronically in Twelve (12) Lots
Enterprise IrelandDublinFrist: 12. Aug.The supply of commercially published Business Information/Market Research Databases available electronically in Twelve (12) LotsInternational Consultancy for the Development of on-grid Renewable Energy Projects and Framework in Nigeria Lot 1
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornShort Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined Contributions (NDC) and the National Policy on Climate Change, have been updated to show a higher level of ambition. Despite reforms in the past decade, Nigeria"s energy sector still faces significant challenges. On-grid generation is limited by weak transmission infrastructure, while the distribution side suffers from DisCos" liquidity crises and high technical and commercial losses. Electricity demand is estimated at 30,000 MW, compared to an average peak generation of 5,000 MW. To address these gaps, the Nigerian government passed the Electricity Act, 2023, repealing the Electric Power Sector Reforms Act, 2005. The Act decentralises the electricity market, empowering state governments to establish State Electricity Markets (SEMs). It prioritises RE deployment and aims to attract private investment into the Nigerian Electricity Supply Industry (NESI). Several states are already setting up SEMs, but most lack the tools, skills, and resources to implement them effectively. Therefore, NESP is providing targeted technical support that will focus on the following key output indicators: On-grid (Premium Grids) Output indicators: 1. Identification and mapping of suitable areas for premium grid projects in cooperation with DisCos 2. Promote awareness and experiences with an implemented premium grid project with RE generation component 3. Support to DisCos to develop and implement economically sound business models and project implementation plans, network analysis and develop contractual documents Framework (Energy Transition Policy and State Electricity Market support) 1. new or improved laws, regulations or instrumetns to acheive the energy policy goals prioritised in the Nigerian Energy transition plan (e.g, energy access, renewable energy 2. Support 5 states on their respective State Electiricty Market through the development of policies, laws, or instruments to advance RE investment. Tasks of the contractor: Work package 1: Premium Grids (On-grid) This work package aims to support DisCos in identifying and mapping suitable sites for premium grids which include the use of NESP developed data-based tools as well as selecting and cooperating with RE developers for their implementation. The following activities are planned under this work package: 1. Development of pre-feasibility studies and support with tenders for premium grid projects 2. Technical assessment and analysis of identified premium grid projects. 3. Legal and transactional support for premium grid projects 4. Technical supervision and advisory services on project execution in the field. Work Package 2: Framework and Policy Development Support This work package aims to provide support for adaptive, flexible, demand-driven policy and regulatory framework development for selected subsectors covered by the ETP, with regards to EE and RE. The following activities are planned under this work package: 1. Technical support to NERC, State governments, NEMSA on the development of regulatory and investment framework to support RE and grid connected RE projects in Nigeria 2. Development of training materials and capacity building for the selected government partners.International Consultancy for the Development of off-grid Renewable Energy Projects Lot 2
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornShort Project Description: Nigerian Energy Support Programme (NESP) NESP is currently in its third phase (June 2023 - May 2027) and still funded by the European Union (EU) and the German Federal Ministry for Economic Cooperation and Development (BMZ). The programme is implemented by the Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH in collaboration with Nigeria"s Federal Ministry of Power. Its core objective is to foster investments in domestic renewable energy (RE) and energy efficiency (EE) markets while improving electricity access for disadvantaged, mostly rural communities, including those in conflict-affected areas. Background With a fast-growing population now estimated at 227 million, Nigeria is the most populated country in Africa. With only 60% of Nigeria"s population connected to the main grid, the rest remains unconnected. Power supply shortages do not only affect the living standards of Nigerians, but also the competitiveness of Nigeria"s businesses and industries. In most cases, Nigerians resort to expensive and polluting captive diesel generation to satisfy their power needs. As a result, Nigeria has become one of the largest markets for diesel generators in the world. With its huge natural and fossil resources, Nigeria is Africa's energy giant and energy exports are essential for the Nigerian economy transition. However, due to the destabilisation of oil prices there is an increasing interest by Nigeria to accelerate the energy transition by increasing investments in sustainable energy. The Energy Transition Plan (ETP) that was adopted in February 2022 provides an ambitious, long-term strategy for the energy transition. It builds on the Sustainable Energy for ALL (SEforALL) Action Agenda and its Vision 30:30:30, setting the target to increase power generation capacity to 30 gigawatts (GW) and the RE share in the electricity mix to 30% until 2030. Important climate policy documents, particularly the Nationally Determined ContributFeasibility study on the establishment of a central public database for Country-by-Country Reports (CbCR)
Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbHEschbornThe main objective of this assignment is the preparation of a comprehensive study examining possible ways to enhance access to, and use of, public CbCR data - particularly for developing countries -, including by assessing the feasibility and implications of establishing a central public database for CbCR. The study shall provide a robust analytical basis to inform ATI members on viable options, associated benefits, risks, and implementation requirements, as well as alternative approaches to enhance the accessibility and effective use of CbCR data.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Ministerie van Economische Zaken, Rijksdienst voor Ondernemend Nederland (RVO).
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.