Vantaan Energia OyVantaaTED
CTES: RU02 Diffuser structures
Scope of supply consists of the complete RU02 Diffuser structures defined in Appendix 1 The final scope and options will be announced later in the final inquiry material.
Rohre
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Vantaan Energia Oy
- Veröffentlicht:
- 11. Juni 2026
- Frist:
- Nicht angegeben
- Thema:
- Rohre
Ausschreibungsbeschreibung
Scope of supply consists of the complete RU02 Diffuser structures defined in Appendix 1 The final scope and options will be announced later in the final inquiry material.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0000
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten2 Angaben erfasstAusführungsorte
Veröffentlichungsstelle
Freischalten6 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
9CTES: RU02 Diffuser Pipes and its bulkhead structures
Vantaan Energia OyVantaaFrist: 05. Aug.Scope of supply consists of the complete RU02 RU02 Diffuser Pipes and its bulkhead structures defined in Appendix 1 The final scope and options will be announced later in the final inquiry material.CTES: Low Voltage Switchgears and UPS
Vantaan Energia OyVantaaFrist: 14. Aug.Vantaan Energia is planning to purchase as follows: Preliminary scope of supply consists of 2 pcs of 690 VAC switchgears, 12 pcs 400 VAC switchgears 9 pcs of LV bus ducts 2 pcs of UPS 2 pcs of Battery back-up system defined in Appendix 1. The final scope and options will be announced later in the final inquiry material.PQQ Adare Village Hall Refurbishment and Extension (Protected Structure)
AVH Community Services CLGAdareFrist: 28. JuniThe project comprises the careful refurbishment, conservation, and extension of the existing Adare Village Hall, a designated protected structure of significant architectural and cultural heritage value. The works are designed to preserve and enhance the historic character of the building while upgrading its functionality to meet contemporary community needs. The refurbishment element includes the repair, restoration, and retention of original architectural features, including masonry walls, roof structure, fenestration, and internal finishes, in accordance with best conservation practices. All interventions will be carried out with due regard to the building’s protected status, ensuring minimal impact on historic fabric and adherence to relevant conservation guidelines and statutory requirements. The proposed extension is designed as a sympathetic addition, carefully integrated with the existing structure in terms of scale, form, and materiality. The extension will provide additional functional space to support modern community use, including improved accessibility, upgraded sanitary facilities, and enhanced circulation. Associated works include upgrades to building services (mechanical and electrical), fire safety improvements, thermal performance enhancements, and compliance with current Building Regulations, all implemented in a manner that respects the integrity of the protected structure. External works may include minor site development, drainage, and accessibility improvements, ensuring the building is fully accessible and fit for purpose. Overall, the project seeks to balance conservation principles with contemporary requirements, safeguarding the heritage significance of Adare Village Hall while ensuring its sustainable use for future generations.Design and fabrication of a Steel Frame Building Structure
ConsensaReykjavíkConsensa, a procurement service provider (ID No. 690607-1310), requests offers for the design and fabrication of a steel frame building structure for Kalka sf. (ID No. 531278-0469), a municipally owned waste management company. The structure shall have a total area of 1,440 m² and shall be located at Berghólabraut 7, 230 Reykjanesbær, where Kalka currently conducts its operations.REQUEST FOR TENDER for the Provision of Organisation Structure and Design Services for the Central Remedial Clinic (CRC)
Central Remedial ClinicDublinThe Contracting Authority is engaging in a competitive process for the provision of Organisation Structure and Design Services.NP001-2026 Design and Build of Various Steel Structures at Palazzo Parisio Valletta
Ministry for Foreign AffairsVallettaDesign and Build of Various Steel Structures at Palazzo Parisio Valletta.Engineering Consultancy Services to establish the structural integrity of the existing quay structure for the Port of Waterford
Port of Waterford CompanyWaterfordFrist: 13. JuliProvision of Engineering Consultancy Services to establish the structural integrity of the existing quay.Lot 1 - Architect (Design Team Lead). St Joseph Street 3 no 1 Bed units, in a single structure end of terrace, to match existing terraced units, St Joseph Street Limerick Design Consultancy Services
Limerick City and County Council_103432Limerick.Lot 1 - Architect (Design Team Lead). St Joseph Street 3 no 1 Bed units, in a single structure end of terrace, to match existing terraced units, St Joseph Street Limerick Design Consultancy Services for Affordable and Social Housing Projects, Limerick City and County Council Including design certifier, assigned certifier, preparation of FSC and DAC, and appointment of lead consultant advertised as PSDP.Request for Information - Mechanical Couplings and Gas Shut-Off Valves for Low-Pressure Gas Networks (≤63 mm)
Stedin Netbeheer B.V.RotterdamFrist: 29. JuliThe participating Dutch Distribution System Operators (DSOs) Stedin, Alliander and Enexis intend to conduct a joint procurement procedure for the supply of mechanical fittings and shut-off valves for gas distribution networks. The scope includes the supply of mechanical couplings, transition fittings, ancillary components (including support inserts where applicable) and mechanically connected shut-off valves suitable for polyethylene (PE) gas pipelines with nominal diameters up to and including 63 mm. The products are intended for use in low- and medium-pressure gas distribution networks and must comply with applicable technical standards, certification requirements and quality requirements for gas infrastructure applications. Through this market consultation, the contracting entities aim to obtain information regarding available products, market developments, sustainability opportunities, innovation potential, security of supply, technical developments (including suitability for future energy carriers where applicable) and possible procurement strategies. No contract will be awarded as a result of this market consultation. Information obtained may be used in preparation of a future procurement procedure.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Für diese Bekanntmachung ist aktuell keine konkrete Angebotsfrist angegeben.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Vantaan Energia Oy.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.