Ardrahan NS Board of ManagementArdrahanTED
Construction of two new classrooms and office at Ardrahan NS. Extend playground hard surface area and upgrade the existing wastewater treatment system
To construct an extension to the existing National School. 2. Demolish existing storage sheds and extend playground hard surface area and 3. upgrade the existing wastewater treatment system
Pflasterarbeiten, Nichtwohnungsbau
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Ardrahan NS Board of Management
- Veröffentlicht:
- 05. August 2026
- Frist:
- 24. August 2026
- Thema:
- Pflasterarbeiten
Ausschreibungsbeschreibung
To construct an extension to the existing National School. 2. Demolish existing storage sheds and extend playground hard surface area and 3. upgrade the existing wastewater treatment system
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
6 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
4Construction of two new classrooms and office at Ardrahan NS. Demolition of two existing storage sheds and extend playground hard surface area and upgrade the existing wastewater treatment system
Ardrahan NS Board of ManagementArdrahanFrist: 24. Aug.To construct an extension to the existing National School. 2. Demolish existing storage sheds and extend playground hard surface area and 3. upgrade the existing wastewater treatment systemInstallation of New Floodlighting System (pitch 2) and Upgrade of Existing Floodlighting System (pitch 1)
Raheens GAANaasFrist: 09. JuliThe Works comprise: A. The complete upgrade of the existing floodlighting installation serving Pitch No. 1 through removal of existing equipment and replacement with modern LED floodlighting system. B. The complete design, supply, installation, commissioning, testing and certification of a new floodlighting installation to Pitch No. 2. The successful Contractor shall provide complete turnkey operational floodlighting systems including all associated electrical works, control systems, civil works, trenching, ducting, cabling, equipment pillars, switchgear, testing, certification and commissioning.HCS 0319 - Construction of 30no. social housing units and all associated site development works at Cois Abhainn (Phase 3), St. Johnston, Co. Donegal
Donegal County Council_1193LiffordThe works comprise of the construction of 30no. two storey social housing units consisting of 4no. 1 bedroom apartments, 4no. 2 bedroom apartments, 8no. 2 bedroom houses, 12no. 3 bedroom houses, 2no. 4 bedroom houses. The associated site works and services consist of the following non exhaustive list: site clearance and excavation works, ESB diversions, new access roads, resurfacing of existing roads, retaining walls, footpaths, on site surface water attenuation, underground static water storage tanks, carparking, construction of new foul and surface water connections to include upgrade of existing foul wastewater pumping station with a new rising main and installation of watermain booster pump.Tender for Project Shine for the Design, Supply and Install of Fire Suppression and Fire Abatement system at MEDITE Europe DAC ‘26
Medite Europe DACClonmelFrist: 09. JuliMEDITE Europe DAC is investing in new plant and equipment under the title Project Shine. Project Shine involves the installation of the following: • Wet fuel handling systems. • Dry Fuel handling systems. • 56MW Biomass Energy Plant. • MDF Core + face dryers. • Services + utilities to the above, mainly: o Electrical distribution MCC’s o Compressed air o Water treatment systems o Fire detection + suppression o Natural Gas o Steam Project Shine has commenced the construction phase of Project Shine and proposals are sought for the supply of Fire Protection and Suppression to the various plant, equipment and buildings. The scope involves designing the fire protection systems to deliver the required volumes and density in order to comply with relevant standards. Medite DAC complies with NFPA standards and all equipment/pipework/valves/fittings etc are all FM approved. Existing Setup MEDITE’S existing fire mains schematic can be seen in Appendix 3. The system is designed to and complies with NFPA standards. The system comprises of: • 1 no. 1,500 GPM/125 PSI Mather + Pratt electric pump. • 1 no. 1,500 GPM/125 PSI Mather + Pratt diesel pump. • 200mm diameter ring main. • Various PIV, AV’s and fire hydrants. • The system is configured as a dry system. Scope of work The Scope of Work is to design, supply + install fire suppression/protection to the following areas: 1) Wet Fuel Equipment (estimated availability date Jun’27): o Wet Fuel from yard system o On-site Chipping System o Chipped Truck Delivery System o 51.270 Reject conveyor head + tail deluge (push button from control room) o 51.310 Tube conveyor feeding existing line #2 energy plant head + tail deluge (push button from control room) o 51.250 Tube conveyor feeding energy plant walking floor head + tail deluge (push button from control room) 2) Dry Fuel System (estimated availability date Jun’27): o 1 no. Edge Trim Silo: o 1 no. Dust Silo o Supply to each spark extinguisher spray nozzle (where runs are external the ne
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 24. August 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Ardrahan NS Board of Management.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.