Raheens GAANaasTED
Installation of New Floodlighting System (pitch 2) and Upgrade of Existing Floodlighting System (pitch 1)
The Works comprise: A. The complete upgrade of the existing floodlighting installation serving Pitch No. 1 through removal of existing equipment and replacement with modern LED floodlighting system. B. The complete design, supply, installation, commissioning, testing and certification of a new floodlighting installation to Pitch No. 2. Th...
Erdarbeiten, Elektroinstallation, Leitungsbau
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Raheens GAA
- Veröffentlicht:
- 24. Juni 2026
- Frist:
- 09. Juli 2026
- Thema:
- Erdarbeiten
- Bauobjekt:
- Außensportplatz
Bauobjekt-Klassifikation
- AußensportplatzHauptobjekt
Ausschreibungsbeschreibung
The Works comprise: A. The complete upgrade of the existing floodlighting installation serving Pitch No. 1 through removal of existing equipment and replacement with modern LED floodlighting system. B. The complete design, supply, installation, commissioning, testing and certification of a new floodlighting installation to Pitch No. 2. The successful Contractor shall provide complete turnkey operational floodlighting systems including all associated electrical works, control systems, civil works, trenching, ducting, cabling, equipment pillars, switchgear, testing, certification and commissioning.
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten49 Angaben erfasstUnterlagen
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten3 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
8Installation of New Biomass Heating System at Aura Leisure Centre, Letterkenny
Donegal County Council_1193LiffordFrist: 17. Aug.Installation of 500kW Biomass Boiler at Aura Leisure Centre including associated mechanical and electrical works to operate and connect to existing heating system and construction of a flue pipe. Storage, loading and thermal storage systems to be installed as part of the works. DCC are novating the design responsibility of the Contract to the main contractor who can propose either an alteration and refurbishment of the existing Biomass system which has been out of use since 2014 due to a basement system which was flooded or a new stand alone system. Alterations to the existing boiler house for the main building is also to be included in the scope of works and this is outlined in the technical specification including a new pressurisation system to be installed.CT3036/2025 - Tender for the Supply, Installation, Testing and Commissioning of the HVAC System of Environmental Performance Standards for the Outpatient Unit at Gozo General Hospital
Department of ContractsFlorianaCT3036/2025 - Tender for the Supply, Installation, Testing and Commissioning of the HVAC System of Environmental Performance Standards for the Outpatient Unit at Gozo General HospitalConstruction of two new classrooms and office at Ardrahan NS. Demolition of two existing storage sheds and extend playground hard surface area and upgrade the existing wastewater treatment system
Ardrahan NS Board of ManagementArdrahanFrist: 24. Aug.To construct an extension to the existing National School. 2. Demolish existing storage sheds and extend playground hard surface area and 3. upgrade the existing wastewater treatment systemCT3016/2026 - TENDER FOR THE SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF ANAESTHESIA MACHINE MRI PROOF COMPLETE WITH AN ANAESTHESIA INFORMATION SYSTEM AND A COMPLETE VITAL SIGNS MONITORING SYSTEM FOR GOZO GENERAL HOSPITAL
Department of ContractsFlorianaFrist: 09. JuliCT3016/2026 - TENDER FOR THE SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF ANAESTHESIA MACHINE MRI PROOF COMPLETE WITH AN ANAESTHESIA INFORMATION SYSTEM AND A COMPLETE VITAL SIGNS MONITORING SYSTEM FOR GOZO GENERAL HOSPITALLighting Upgrade Works - IDA Business and Technology Park, Letterkenny, Co. Donegal
IDA IrelandDublinDecommissioning and removal of existing lighting fixtures and columns as per drawings. Installation and commissioning of new lighting fixtures and columns and associated civils works at the IDA Business and Technology Park Letterkenny, Co. DonegalA pre market consultation for the supply, installation and commissioning of a Laboratory Information Management System
University College Dublin ( UCD )DublinFrist: 05. Aug.A pre market consultation for the supply, installation and commissioning of a Laboratory Information Management SystemPQQ for the Design, Supply, Installation and Commissioning of a Flue Gas Abatement System at Medite Europe DAC
Medite Europe DACClonmelFrist: 26. JuniMEDITE Europe DAC is invites expressions of interest from experienced and qualified companies for the design, supply, installation and commissioning of a flue gas abatement system and associated ancillaries for a biomass boiler installation. A system will be required to treat the boiler flue gas stream and reduce particulate emissions in order to support safe, reliable and compliant plant operation. The proposed solution shall be suitable for the defined operating conditions, including flue gas flow, temperature, moisture content and dust loading, and shall be capable of integration with the existing boiler, draft system, stack and plant control infrastructure. The scope is expected to include, as applicable, the main abatement equipment, inlet and outlet ductwork interfaces, support steelwork, access platforms, insulation, ash collection and discharge arrangements, instrumentation, controls, electrical integration, and all associated ancillaries necessary for a complete and operable system. The system should be designed to achieve the required emissions performance while maintaining acceptable pressure drop, operability, maintainability and safe access for inspection and maintenance. The proposed equipment must be of proven industrial technology and conform to best practice design principles and all relevant European legislation and standards, including CE marking where applicable. The successful contractor shall be expected to undertake detailed engineering, equipment manufacture and supply, delivery to site, erection, testing, commissioning, performance verification, operator training and handover of the complete system, together with the provision of all relevant drawings, manuals and technical documentation. It is anticipated that this pre-qualification process will be followed by technical proposal evaluation and a subsequent detailed tendering stage for the selected bidders.Integration of distribution locations from the water supply system of Prilep City into the existing SCADA system and GIS system (PUE "Water Supply and Sewage")
Prilep MunicipalityPrilepFrist: 30. JuniIntegration of distribution locations from the Prilep City water supply system into the existing SCADA and GIS systems.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 09. Juli 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Raheens GAA.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.