Kildare County Council_385NaasTED
Construction of a Social Housing Proposal at Ardrew Halting Site, Athy, Co. Kildare
Construction of 5 Nr. Group Houses, Replacement of Caretaker Unit, Refurbishment and Alteration of 4 Nr. Dayhouses to form 2 Nr. Dayhouses and associated siteworks including Attenuation Tank and Landscaping. Phased delivery.
Kanalbau, Wohnungsbau
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
Construction of 5 Nr. Group Houses, Replacement of Caretaker Unit, Refurbishment and Alteration of 4 Nr. Dayhouses to form 2 Nr. Dayhouses and associated siteworks including Attenuation Tank and Landscaping. Phased delivery.
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Kildare County Council_385
- Veröffentlicht:
- 17. Juni 2026
- Frist:
- 31. Juli 2026
- Thema:
- Kanalbau
- Bauobjekt:
- Mehrfamilienhaus / Wohnblock
Bauobjekt-Klassifikation
- Mehrfamilienhaus / WohnblockHauptobjekt
Ausschreibungsbeschreibung
Construction of 5 Nr. Group Houses, Replacement of Caretaker Unit, Refurbishment and Alteration of 4 Nr. Dayhouses to form 2 Nr. Dayhouses and associated siteworks including Attenuation Tank and Landscaping. Phased delivery.
Weiterführende Details
Nach Registrierung stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
Dokumente und Anhänge
49 Dateien erfasst- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Ähnliche Bekanntmachungen
10- Louth County Council_381Dundalk
Construction of Infill housing at Rathmullen Park, Drogheda, Co. Louth
Procurement of Construction Contractor to construct 4 No. Infill houses, and all associated car parking and site works. - Louth and Meath Education and Training Board 1384NavanFrist: 17. Aug.
22.019 Invitation to Tender for the Construction of a New Two-Storey Tertiary Education Building Extension at Drogheda Institute of Further Education for LMETB
The project involves the Construction of a new two-storey multi-purpose tertiary education building extension to the North-East of the existing Drogheda Institute of Further Education school building, phased construction over two phases including all associated services, drainage, landscaping and siteworks as detailed in Volume A Works Requirements. - Sligo County CouncilSligoFrist: 26. Juni
EoI - Suitability Assessment for Design and Build Works Contractors for the construction of 12 no. Social Housing units together with all associated site works at Grange, Co.Sligo.
The construction of 12 no. 1 and 2 storey dwellings comprising of 4 two-bedroom apartments, 1 two bedroom house, 6 three-bedroom houses, and 1 four-bedroom house together with all associated site works at Harte’s Court (Cúirt Uí Airt), Grange Townland, Grange, Co.Sligo, for Sligo County Council. - Doon Community Housing AssociationLimerickFrist: 05. Juni
Renovation, Conversion and extension of Existing Terraced Property to Provide Three Accessible Community Group Home Residential Units at Doon, Co. Limerick
Comprehensive refurbishment, renovation and partial demolition of an existing stone terraced dwelling in Doon, Co. Limerick, to create three independent, fully accessible community group home residential units. Includes demolition of rear extensions, construction of new accessible rear extensions, all civil, structural, architectural, MEP works, kitchen/bathroom fit-outs, finishes, boundary treatment, access improvements, landscaping. Existing building stripped to shell, stone facade retained and restored. All units comply with Part M of Technical Guidance Documents and feature LD1 minimum automatic fire alarm system. Total existing floor area: 317 sq.m across three units. - Cork County CouncilCorkFrist: 31. Aug.
Expression of Interest for a Development Partner for Design Construction Delivery Sale of mixed tenure development including associated siteworks at Beechgrove, Clonakilty for CCC.
Cork County Council wish to appoint a Development Partner with a view to progressing a mixed tenure development at Beechgrove, Clonakilty for CCC. Delivery will include c.35 residential units. The appointed Developer shall assume full responsibility for the delivery of the project from current part 8 design to completion, including design development, provision of all associated infrastructure, and construction of all residential units. The Developer shall secure all statutory approvals, certifications, and compliance sign-offs. The Developer shall deliver completed Social and Affordable Housing units to Cork County Council in accordance with agreed specifications and programme. The Developer shall fully fund the delivery of the Affordable Housing units and associated site infrastructure. Affordable Housing units shall be marketed and sold at pre-determined prices to purchasers nominated by Cork County Council. The Developer shall enter into building agreements with purchasers nominated by Cork County Council. Social Housing units shall be funded by Cork County Council through staged payments at agreed project milestones. - Cork County CouncilCorkFrist: 26. Juni
Establishment of a Multi-Party Framework Agreement for Design and Build Works Contractors for the Delivery of Large-Scale Social Housing Projects (Project Value Over €5m) for Cork County Council
Cork County Council is establishing a Multi-Party Framework Agreement for Works Contractors, including multi disciplinary Design Team Services, for the delivery of social housing projects using Modern Methods of Construction (MMC) with an estimated project value in excess of €5 million and no upper limit. Modern Methods of Construction (MMC) Specialist(s) - including but not limited to Volumetric Housing Units; Panelised (Timber Frame, Light Gauge Steel Frame, Precast Concrete Panels and Structurally-Insulated Panels); Insulated Concrete formwork. The framework will have an overall estimated value of €250 million, and it is intended that seven contractors will be appointed. The framework is for Contractor-Designed projects, with PW-CF2 to be used as the form of public works contract. The following consultancy services will also be required as part of the Contractor’s Design Team: • Designer – Architectural Services (Contractor Design Specialist), including PSDP • Designer – Civil and Structural Engineering Services (Contractor Design Specialist) • Designer – Mechanical and Electrical Services (Contractor Design Specialist) The initial project comprises the construction of 45 No. social housing units on a Design and Build basis using Modern Methods of Construction (MMC) at Broomfield West (Phase B), Midleton, Co. Cork. The accommodation comprises: • 10 No. 1-bed apartments • 8 No. 2-bed apartments • 3 No. two-storey 4-bed semi-detached houses • 8 No. 2-bed terrace houses • 16 No. 3-bed terrace houses The works will also include associated mechanical and electrical services installations, together with associated site development and external works. A set of Part 8 Planning Drawings accompanies this Suitability Assessment Questionnaire for illustration purposes. There is no guarantee of any subsequent contracts under the framework. However, any additional projects arising during the term of the framework will be awarded by way of mini-competition, with tenders assessed on the basis of cost and quality. Additional information regarding the scope of the framework and the initial contract will be provided at Stage 2 of the process. For the avoidance of doubt, the delivery period for any contract awarded under the framework may extend beyond the expiry date of the framework agreement. - Trinity College Dublin the University of Dublin_336DublinFrist: 29. Juni
Cunningham House Redevelopment at Trinity Hall, Dartry, Dublin 6
The redevelopment of Cunningham House will consist of an extension to existing purpose-built student accommodation at Trinity Hall with an overall gross floor area of approximately 10,982sqm providing a total of 358 no. purpose-built student bed spaces together with complementary and ancillary uses. The project works will comprise of the demolition of Cunningham House, the Sports Hall (including existing part basement), the eastern section of the historic rear boundary wall and associated single storey ancillary sheds and the provision of 4 no. new connected blocks arranged in a quadrangle form: Block A ranges in height from four to eight storeys; Block B is four storeys in height; Block C is three storeys in height while the Forum Block is single storey in height (partially double height space). The project scope will include: • 358 no. purpose-built student bed spaces • 4 no. staff apartments • 2 no. study spaces/classrooms • A replacement multi-use Sports Hall, together with the adjoining Forum amenity space • Outdoor amenity spaces within the central courtyard together with enhanced public realm and landscaping works • 188 no. bicycle parking spaces within the application site • Single storey security hut at the main vehicular entrance • Works to Oldham House (a Protected Structure) to include works necessary for the demolition and replacement of late 20th century Sports Hall (directly abutting Oldham House). • Provision of a screen wall to the south of Greenane House (a Protected Structure). • All associated and ancillary landscaping works; site lighting; refuse storage; boundary treatments; plant; solar photovoltaic panels; water, wastewater and surface water works; upgrade works to existing electrical substation and all other site and development works. - Atlantic Technological UniversityLetterkenny
RFT 06/25DL - RFT for a Project Manager Led Controls Team for the design, construction and fit out of a Veterinary Facility at Atlantic Technological University (ATU), Letterkenny, Co. Donegal
Atlantic Technological University (ATU) seeks a project manager-led controls team for the design, construction, and fit out of a veterinary facility in Letterkenny, Co. Donegal. The team will work closely with a separately appointed Integrated Design Team to ensure programme and budget delivery. Refer to Project Information Memorandum (PIM), QC2-Part 1 and 2, and Standard Conditions of Engagement. Full details in attached documents. - INNLANDET FYLKESKOMMUNEHAMAR
Construction of a new boarding authority at Solør sixth form college.
Innlandet county shall construct a boarding authority at Solør Sixth Form College. Nordhagamoen 220, 2435 Braskereidfoss. The boarding authority shall be established on a separate site where Solør Sixth Form College is currently located. The project mainly comprises the establishment of a boarding authority with 50 cabins with associated areas, as well as outdoor work, including, among other things, driving and walking areas, moving and re-establishing the football pitch. The building is planned to be constructed in 2 floors with 2 wings. The area that binds the wings together is administrative/common areas. The building shall be designed in such a way that it is adaptable and that, over time, other uses can be adapted and they can increase or reduce the area in the horizontal direction (addition). The new buildings are approx. 1,450 m2 GFA. The project will be executed as a turnkey contract in one construction stage. - INNLANDET FYLKESKOMMUNEHAMARFrist: 03. Juli
Construction of a new boarding authority at Solør sixth form college.
Innlandet county shall construct a boarding authority at Solør Sixth Form College. Nordhagamoen 220, 2435 Braskereidfoss. The boarding authority shall be established on a separate site where Solør Sixth Form College is currently located. The project mainly comprises the establishment of a boarding authority with 50 cabins with associated areas, as well as outdoor work, including, among other things, driving and walking areas, moving and re-establishing the football pitch. The building is planned to be constructed in 2 floors with 2 wings. The area that binds the wings together is administrative/common areas. The building shall be designed in such a way that it is adaptable and that, over time, other uses can be adapted and they can increase or reduce the area in the horizontal direction (addition). The new buildings are approx. 1,450 m2 GFA. The project will be executed as a turnkey contract in one construction stage.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 31. Juli 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Kildare County Council_385.
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.