Office of Public Works (OPW)TrimTED
Civil and Structural Consultancy Services for Visitor Centre at Casino Marino, Malahide Road, Dublin 3
The Commissioners of Public Works in Ireland are seeking Civil and Structural Consultancy Services for the Visitor Centre at Casino Marino, Malahide Road, Dublin 3
Tragwerksplanung, Tiefbauplanung
Ohne Kreditkarte · Sofortiger Zugang
Inhalt auf einen Blick
- Ausschreibungstyp:
- Ausschreibung
- Auftraggeber:
- Office of Public Works (OPW)
- Veröffentlicht:
- 15. Juli 2026
- Frist:
- 18. August 2026
- Thema:
- Tragwerksplanung
Ausschreibungsbeschreibung
The Commissioners of Public Works in Ireland are seeking Civil and Structural Consultancy Services for the Visitor Centre at Casino Marino, Malahide Road, Dublin 3
Weiterführende Details
Mit dem kostenlosen Zugang stehen Unterlagen, Fristen und Hinweise zur Einreichung strukturiert bereit.
- Kernanforderungen der Ausschreibung priorisiert aufbereitet
- Fristen, Eignungskriterien und Unterlagen in einem Ablauf
- Hinweise zur strukturierten Angebotsvorbereitung
- Passende Folgeausschreibungen automatisch entdecken
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Alle Vergabedetails
Auftraggeber, Lose, Beteiligte, Orte, Unterlagen und Verfahrensdaten sind bereits erfasst. Öffnen Sie einen Bereich, um die vollständigen Angaben im Workspace zu sehen.
7 Datenbereiche verfügbar
30 Tage kostenlos · keine Kreditkarte · jederzeit kündbar
Unterlagen
Freischalten50 Angaben erfasstUnterlagen · Dokumentenpaket
Auftraggeber
Freischalten3 Angaben erfasstAuftraggeber · Anschrift · Kontakt
Lose
Freischalten1 Angabe erfasstLose LOT-0001
Verfahrensdaten
Freischalten5 Angaben erfasstBekanntmachungsnummer · Verfahrensreferenz · Verfahrensart · Auftragsart · +1 weitere
Ausführungsorte
Freischalten3 Angaben erfasstAusführungsorte
Bieter und Auftragnehmer
Freischalten3 Angaben erfasstBieter und Auftragnehmer · Anschrift · Kontakt
Veröffentlichungsstelle
Freischalten3 Angaben erfasstVeröffentlichungsstelle · Anschrift · Kontakt
Ähnliche Bekanntmachungen
10Civil and Structural Consultancy Services for the Office Fit Out, Project Opera, Bank Place, Limerick
Office of Public Works (OPW)TrimFrist: 20. Aug.The Commissioners of Public Works in Ireland are seeking Civil and Structural Consultancy Services for the Office Fit Out, Project Opera, Bank Place, LimerickProject Management led Integrated Multi-Disciplinary Design Team Consultancy Services for Road Infrastructure and associated services at IDA Ballina
IDA IrelandDublinThe Project Management led Integrated Multi-Disciplinary Design Team Consultancy Services should consist of suitably qualified and experienced resources including a Project Manager, Civil and Road Engineers, Quantity Surveyor, PSDP, Planner, Landscape Architect and any specialist advisors to provide design, planning and implementation of all subsequent contracts for the provision of the project. The team will be required for all 5 stages of the project, Initial Design, Detailed Design and Planning, Procurement of a Suitable Works Contractor, Construction and Handover.Civil and Structural Engineering Consultancy Services (Design) and PSDP Consultancy for Monaghan Blackwater Sluices Access Design
Office of Public Works (OPW)TrimFrist: 17. Aug.To design improved access infrastructure to 22no sluices (non-return valves) located within the Monaghan Blackwater Arterial Drainage Flood Relief Scheme in Co. MonaghanContract for the provision of Quality Assurance Consultancy Services for Dublin City Council's Mixed Use Development at Emmet Road, Inchicore, Dublin 8
Dublin City CouncilDublinThe Quality Assurance (QA) Consultant will represent the Client throughout the construction phase. The role includes reviewing technical documents and providing feedback, checking the design to ensure it meets project standards, monitoring the quality of works on site, ensuring contractor works comply with the building regulations, any technical documents and overseeing testing and commissioning to confirm everything is working correctly and safely. . Please note that this project is subject to funding. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 7487705Tender for Architect-Led Integrated Design Team Consultancy Services to carry out Energy Retrofit and Sustainability Upgrade Works at Waterford Training Centre, Cork Road, Waterford.
Waterford and Wexford Education and Training Board_110494WexfordFrist: 23. JuliArchitecten-geführtes integriertes Planungsteam für Beratungsleistungen zur Durchführung von Energie-Sanierungs- und Nachhaltigkeits-Upgrade-Arbeiten am Ausbildungszentrum Waterford, Cork Road, Waterford.Contract for The provision of Mechanical and Electrical Technical Advisory Services for Dublin City Council's Mixed Use Development at Emmet Road, Inchicore, Dublin 8
Dublin City CouncilDublinMechanical and Electrical Technical Advisor acting on behalf of the Client to review technical submissions and issue comments, carry out construction design due diligence and review quality on site and review testing and commissioning on behalf of the Client. Please note that this project is subject to funding. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 7480855Tender no.12/2026: Provision of Engineering Services for Front End Engineering Design (FEED), for the Expansion of Vasilikos Port (see description below)
Cyprus Ports AuthorityΛευκωσίαFrist: 31. JuliProvision of Engineering Services for Front End Engineering Design (FEED), Detailed Design of Phase A and Supervision of Phase A Construction Works for the Expansion of Vasilikos PortLandkreis Heidenheim - Generalsanierung des Berufsschulzentrums in der Heckentalstraße; HLS
UnknownOther or Not SpecifiedFrist: 24. Aug.Wiederaufbau mit Neugestaltung "Waagplatz"
Verbandsgemeinde AltenahrAltenahrFrist: 01. Sept.Gegenstand dieser Ausschreibung sind Leistungen aus dem Leistungsbild: ?Objektplanung Freianlagen (§39 HOAI) ?Objektplanung Ingenieurbauwerke (§43 HOAI) ?Objektplanung Verkehrsanlagen (§47 HOAI) Auf Basis der Entwurfsplanung (Lph 3) erfolgt die Fördermittelbeantragung durch die Auftraggeberschaft. Erst nach Bewilligung des Fördergebers kann die weitere Bearbeitung erfolgen. Zuzüglich Besonderer Leistungen Einzelheiten gem. LeistungsbeschreibungGeneralplaner SIA 32-53 für Kompensationsanlage im UW Mühleberg
Swissgrid AG - Engineering & ConstructionAarauDas 380-/220-kV-Unterwerk Mühleberg befindet sich in der Gemeinde Mühleberg im Kanton Bern. Das erwähnte Unterwerk wurde 2012 in Betrieb genommen und befindet sich hinsichtlich Gebäude, Schaltanlagen, Transformator und Nebenanlagen in einem guten Zustand. Ziel des Projektes ist die Einrichtung einer Kompensationsdrossel, auch Variable Shunt Reactor (VSR) genannt, inklusive der erforderlichen Infrastruktur. Gleichzeitig wird die komplette Sekundärtechnik, Telekommunikations- und Nebenanlagen für die 380-kV und 220-kV-Anlagen erneuert. Im Jahr 2025 wurde deshalb ein Vorprojekt (SIA 31) für dieses Projekt mit verschiedenen Varianten ausgearbeitet. Der Variantenentscheid wurde im Jahr 2026 gefällt. Mit dieser Ausschreibung soll nun zur Planung und Koordination dieses Projektes der Generalplaner für die SIA-Phasen 32 - 53 beschafft werden, wobei die SIA-Phasen 51 – 53 als Option vergeben werden. Nebst dem fachspezifischen Leistungsumfang in seinem Zuständigkeitsbereich, übernimmt der Generalplaner auch die übergeordnete Aufsicht und Koordination aller involvierten Fachbereiche inkl. zugehöriger Schnittstellen als Gesamtleiter im Sinne der SIA 103 war. Die nachfolgenden Teilbereiche sind vom Generalplaner selbst zu organisieren: * Führung und Koordination aller involvierten Fachbereiche inkl. Schnittstellen * Engineering und Planung im Teilprojekt - Primärtechnik * Engineering und Planung im Teilprojekt - Kompensationsdrossel (VSR) * Engineering und Planung im Teilprojekt - Eigebedarf * Engineering und Planung im Teilprojekt - Gebäudetechnik * Engineering und Planung im Teilprojekt - Hoch- und Tiefbau * Projektierung und Planung im Teilprojekt - Geologie * Projektierung und Planung im Teilprojekt - Umwelt * Bauleitung Die nachfolgenden Teilbereiche werden dem Generalplaner beigestellt: * Auftraggeberseitige Gesamtkoordination der BIM-Modelle * Auftraggeberseitiges Engineering und Planung im Teilprojekt - Substation Automation System (SAS) * Dritter zum Engineering und Planung im Teilprojekt - Physische Sicherheit (Elektrotechnik) Für detaillierte Informationen konsultieren Sie bitte die Dokumente C100 und C101 der Ausschreibungsunterlagen.
Häufige Fragen zu dieser Ausschreibung
- Wie kann ich mich auf diese Ausschreibung bewerben?
- Erstellen Sie ein kostenloses Konto auf Auftrag One. Danach sehen Sie alle Unterlagen, Fristen und Hinweise zur Einreichung in einem strukturierten Ablauf.
- Bis wann läuft die Angebotsfrist?
- Die Angebotsfrist endet am 18. August 2026.
- Wer ist der Auftraggeber?
- Der Auftraggeber ist Office of Public Works (OPW).
- Welche Unterlagen sind für den Start relevant?
- In der Regel benötigen Sie Leistungsbeschreibung, Eignungsnachweise, Fristenhinweise und ggf. Formblätter. Auf Auftrag One werden diese Punkte priorisiert dargestellt.