Waterford City and County Council_103683WaterfordTED
WCCC26 343 Stock Condition Surveys
Carrying out stock condition surveys for approximately 6500 local authority houses over the next 5 years in occupied and vacant properties using the ADDJUST Software.
Surveying
No credit card · Instant access
Content at a glance
Carrying out stock condition surveys for approximately 6500 local authority houses over the next 5 years in occupied and vacant properties using the ADDJUST Software.
- Tender type:
- Tender
- Contracting authority:
- Waterford City and County Council_103683
- Published:
- July 05, 2026
- Deadline:
- August 05, 2026
- Topic:
- Surveying
Tender description
Carrying out stock condition surveys for approximately 6500 local authority houses over the next 5 years in occupied and vacant properties using the ADDJUST Software.
Further details
After registration, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
Documents and attachments
49 files recorded- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Related tenders
10- Sligo County CouncilSligoDeadline: Jul 24
SCC 2026 – 0077 Stock Condition Surveys for Sligo County Council
Stock Condition Surveys for properties for Sligo County Council - Offaly County Council_448TullamoreDeadline: Jun 26
2026 Offaly County Council Housing Maintenance: Pre-let Repair Term Maintenance and Refurbishment Works on Council owned housing stock using the Multi Party Framework Agreement
Offaly County Council establishes a multi-party Framework Agreement for term maintenance and refurbishment on council housing stock. Approximately 35 properties (mainly vacant) over 1 year: 30% major works (EWI, re-plumb, rewire, windows/doors, heat pump, kitchen, bathroom, fencing, painting), 70% standard works (boiler service, window/door servicing, kitchen/bathroom repairs, attic insulation, electrical checks, alarms, immersion, internal doors, painting, fencing, waste removal). Framework of 12 participants plus 5 reserves, ranked by lowest price, awarded via Option C (application of framework rates). Process begins with property inspection. - Offaly County Council_448TullamoreDeadline: Jun 30
2026 Offaly County Council Housing Maintenance: Pre-let Repair Term Maintenance and Refurbishment Works on Council owned housing stock using the Multi Party Framework Agreement
Offaly County Council intend to establish a Framework Agreement for use with a Term Maintenance and Refurbishment Works Contract (TMRC) to carry out pre-let repairs and refurbishment works on council owned stock. The properties will be mainly vacant but some will be occupied during the works. It is expected that works will be carried out on approximately 35 houses over the intended 1 year term of the contract. Approximately 30 per cent of the properties will require major works e.g. EWI (Solid Walls), re-plumb, rewire, replace windows and doors, Heat pump, close up chimney etc., new bathroom, kitchen and internal doors, replace boundary fencing, paint internally, all other standard servicing and replacement for items for pre-lets, etc. The other 70 per cent will require standard works e.g. service or replace existing gas/oil boiler, replace external teak doors, service windows, kitchen, bathroom (replace taps, handles, seals, etc), extend tiling around bath, top up attic insulation, electrical checks and minor repairs/additions, fit new alarms, fit new immersion and cylinder, service/replace iron monetary on internal doors, paint internally, tidy up externally, replace/repair boundary fences if needed, remove waste and contents etc. It is proposed to establish a multi-participant framework list of qualified participant contractors who can be called upon to carry out Task Orders under the terms of the TMRC. A list of 12 participants and 5 reserve participants will be established, participants will be ranked on lowest price and must qualify under the requirements of the Suitability Assessment Questionnaire. All items listed in Volume C Pricing Document must be priced. It is intended to award works using Option C (Application of framework rates) of the Agreement for the majority of the properties requiring works. The process will proceed as follows: When a pre-let becomes available to repair, Offaly County Council staff shall visit the property to inspect it, take measurements and prepare a works list by selecting the appropriate items from the pricing document. The council will, without consulting the participants (contractors), apply the framework rates tendered in each framework participants pricing document to the quantities and having extended the rates and quantities and summed them, determine the lowest comparative price. A task order will be offered to the framework participant with the lowest comparative cost. Alternatively, Offaly County Council may hold a mini tender competition under Option A (Mini-competition with all participants) of the Agreement among framework participant contractors who have met the mandatory criteria. The participants will be asked to price the list of works for the property via e-tenders quick quote system. The participant will be deemed to have thoroughly review all information supplied with the task order / mini competition tender and have acquainted themselves with the nature, scope, and extent of all proposed work before responding to the Task Order / mini competition in accordance with the conditions of contract. All participant contractors will have to be first approved by Offaly County Council Health Safety Officer to perform the duties of PSCS before being appointed. This is a pass/fail requirement for this contract. - Oslobygg KFOsloDeadline: Jul 15
Market survey - Condition based operational monitoring of technical installations in nurseries.
1. Introduction OsloBygg KF is considering to procure a digital service for condition based operational monitoring of technical installations in nurseries. The objective of the market survey is to gain better insight into the market and input from suppliers on what systems are available, what can be delivered and how such services can normally be introduced. The market survey is not a competition and the contracting authority is not requesting tenders at this point in time. Participation in the market survey gives no rights or advantages in any later procurement. 2. Provisional need The contracting authority would like input on digital systems that can monitor technical components in nurseries by using sensors, audio analysis, vibration analysis or other relevant measurement parameters. The analysis shall be carried out by KI or ML and it shall automatically alarm in the event of deviations and errors. The system is particularly relevant for: * ventilation aggregates * engines * Fans * Pumps * other relevant technical components The aim of any system is to uncover abnormal operations, errors or wear at an early stage, so that the contracting authority can carry out more targeted and preventive maintenance. The system ought to be able to contribute to better operational security, reduced energy consumption, fewer operational deviations and a better overview of the condition of the technical installations. 3. Input from the market The contracting authority would like general input from suppliers on: * what systems and technologies are available in the market * the types of technical installations and components that can be monitored * if the systems can be used on existing installations without comprehensive reconstruction * how notification, reporting and visualisation normally works * whether the systems can be integrated with MOM systems. * what gains and effects suppliers believe such solutions could provide - Oslo Universitetssykehus HF (hovedenhet)OSLO
77450 UL KLM PAT, automated histology instrument
Hand over of used laboratory equipment - VENTANA HE 600Oslo University Hospital HF (OUS) intends to enter into a contract for the procurement/hand over of two (2) used laboratory instruments, type VENTANA HE 600 from Stavanger University Hospital HF (SUS). The instruments are approx. 5 years old. Based on the technical condition and the manufacturer ́s assessment, the expected lifetime of the residue will be approx. 5 years. The equipment will be used at OUS for as long as the equipment functions for intended use. The hand over occurs between two public health authorities and concerns concrete, individually identified instruments. Oslo Universitetssykehus HF will require: consumables (reagents and the accompanying consumption) and service and maintenance agreements for the instruments ́ remaining lifetime. It is planned to enter into a framework agreement for consumption as well as service agreements with supplier Roche Diagnostics Norway AS. The agreements will have an expected duration of five years, based on the equipment ́s expected lifetime. The contracting authority reserves the right, however, to extend the contract beyond this, as long as the equipment in question is still in use at the laboratory and there is a need for the accompanying services. - Dublin City CouncilDublinDeadline: Jun 12
DCC - Expression of Interest for Multi-Party Framework Agreement for Works Contractors on foot of an initial call-off contract for Pearse House
The Contracting Authority seeks to establish a multi-party framework agreement for Works Contractors to carry out investigations, repairs, retrofit, renewal and adaptive reuse of Dublin City Council properties as housing. A project pipeline includes refurbishment of c. 750 homes: multi-unit flat blocks (4-5 storey), protected structures and own-door properties, plus precinct improvements. Works include compliance with Building Control and Safety regulations, clearing, hazardous material removal, demolitions, alterations, and substructures. Initial call-off contract is for Pearse House. - Norsk Helsenett SFTRONDHEIM
Dynamic purchasing system within Administrative consultancy services (Analysis and evaluation and Project management and support)
About the schemeHere, the following administrative (non-IKT) DPS schemes are registered. The scheme includes the following areas: Analysis and evaluationProject management and supportThis DPS scheme will replace the current scheme (doffin-id 2021-378460) for the above mentioned sub areas, from and including 3.6.2025 Extent and valueMaximal value for the DPS scheme ́s combined is estimated to NOK NOK 6.2025. NOK 200,000,000 excluding VAT (5 years). The maximum value is based on historical figures as well as an expected increase over the next 5 years in the future. The maximum value within each sub area will be stated in the notice for each sub area. The DPS scheme will take effect 3 June 2025 and will last until 3 June 2030. The contracting authority reserves the right to terminate the DPS scheme at a earlier date. The contracting authority shall announce the change in the DPS scheme ́s length if the scheme is terminated. - Oslobygg KFOsloDeadline: Aug 27
Market survey (second call) - Condition based operational monitoring of technical installations in nurseries.
1. Introduction OsloBygg KF is considering to procure a digital service for condition based operational monitoring of technical installations in nurseries. The objective of the market survey is to gain better insight into the market and input from suppliers on what systems are available, what can be delivered and how such services can normally be introduced. The market survey is not a competition and the contracting authority is not requesting tenders at this point in time. Participation in the market survey gives no rights or advantages in any later procurement. 2. Provisional need The contracting authority would like input on digital systems that can monitor technical components in nurseries by using sensors, audio analysis, vibration analysis or other relevant measurement parameters. The analysis shall be carried out by KI or ML and it shall automatically alarm in the event of deviations and errors. The system is particularly relevant for: * ventilation aggregates * engines * Fans * Pumps * other relevant technical components The aim of any system is to uncover abnormal operations, errors or wear at an early stage, so that the contracting authority can carry out more targeted and preventive maintenance. The system ought to be able to contribute to better operational security, reduced energy consumption, fewer operational deviations and a better overview of the condition of the technical installations. 3. Input from the market The contracting authority would like general input from suppliers on: * what systems and technologies are available in the market * the types of technical installations and components that can be monitored * if the systems can be used on existing installations without comprehensive reconstruction * how notification, reporting and visualisation normally works * whether the systems can be integrated with MOM systems. * what gains and effects suppliers believe such solutions could provide - Sandnes kommuneSandnes
New websites and publication system for Sandnes kommune.
The contracting authority needs to enter into a new contract for the delivery of websites for sandnes.kommune.no. The delivery shall include operation and maintenance of the system, as well as options for further development. The choice of websites and supplier thereof is a strategically important choice for Sandnes kommune and it will be decisive to achieve the aim sandnes kommune has set out to be an efficient and attractive workplace for the employees and be able to offer the municipality ́s inhabitants good and facilitated information on the municipality ́s services as well as user friendly and future orientated internet self-service systems. The contracting authority is uncertain about the extent of the procurement, but estimates that the total contract value for the contract over a period of four years, including options and any further development, can be in the range of NOK 1,800,000 excluding VAT and NOK 4,000,000 excluding VAT. This is an estimate and it shall not carry any obligations for the Contracting Authority or rights for the Tenderer. Subject to changes due to changed financial framework conditions, organisational changes and municipal activity. For a more detailed description see "Annex 1 - Requirement Specification" and "Annex 2 - Price Form". - Fredrikstad kommuneFREDRIKSTAD
Intention notice - temporary agreement on municipal engineering trade system.
Fredrikstad and Hvaler municipalities (henceforth referred to as the contracting authority) intend to enter into a temporary agreement with Norkart AS for a transition to Norkart KOMTEK ́s cloud based system (SaaS) for the operation and further use of trade systems within municipal engineering (VAR), property taxes and fixing fees. The contracting authority has used KOMTEK software delivered by Norkart AS over several years. The system is central in the municipalities ́ task solving and has integrations with several other trade systems. The operation of the system has until now been handled by the contracting authority ́s own ICT department. This means that the current system must, in practice, be continued through a transition to the tenderer ́s cloud system, as local operations will no longer be a real alternative. The contract will be an ongoing contract with Norkart AS for the operation of KOMTEK as the cloud system. The contract will follow the existing contract structure and will mainly continue the same modules, functionality and data basis as in the current system. The contracting authority deems it appropriate to carry out a transition from local operations to a cloud based system as part of a natural technological development. The transition is planned for execution so that the existing functionality is continued, with limited and planned interruptions to operations. Significant changes or expansions in functionality are not planned as a part of the transition. KOMTEK is one of the central solutions in the contracting authority ́s system portfolio and the system has extensive integrations with other systems as well as a significant historical data basis. Any replacement of the system will require comprehensive migration of data, establishment of new integrations and significant changes in work processes, and will therefore involve significant risk and resource use. The contracting authority has therefore assessed that the procurement for technical reasons can only be carried out with the existing supplier. The contracting authority intends to hold a tender contest for new software by 31.12.27 The Contracting Authority has made a decision on an intention notice pursuant to PPR § 13-4 letter b (2).
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 05. August 2026.
- Who is the contracting authority?
- The contracting authority is Waterford City and County Council_103683.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.