Waste Heat Datacenter Westpoort – Lot 1 Heat pump
This tender concerns Vattenfall`s project to realize a Heat Pump Station that will extract waste heat from a datacenter, increase the temperature of the waste heat with a Heat Pump System and inject the produced heat in the existing district heating grid of Westpoort Warmte. The scope of Lot 1 Heat pump is the development, realization and...
Pumps, Valves & Fittings, Process Technology, Cooling Systems
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Vattenfall N.V
- Published:
- June 07, 2026
- Deadline:
- Not specified
- Topic:
- Pumps
Tender description
This tender concerns Vattenfall`s project to realize a Heat Pump Station that will extract waste heat from a datacenter, increase the temperature of the waste heat with a Heat Pump System and inject the produced heat in the existing district heating grid of Westpoort Warmte. The scope of Lot 1 Heat pump is the development, realization and maintenance of a Heat Pump Installation. It concerns an industrial heat pump solution that should be able to heat up district heating water of 55-65°C (condenser inlet) to 95-120°C (condenser outlet, 120°C must be reached at times!), utilizing a 35-25°C waste heat source (evaporator in- and outlet), with a total heat output of 25 MWth.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock3 details capturedPerformance locations
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
8mobile heating and ventilation system plastic halls, fluid based heat pump Akkasæter region North
ForsvarsbyggOSLODeadline: Aug 07The Norwegian Defence Estates Agency invites tenderers to an open tender contest for the delivery of a mobile heating and ventilation system for plastic halls based on fluid based heat pump technology.mobile heating and ventilation system plastic halls, air-air heat pump Akkasæter region North
ForsvarsbyggOSLODeadline: Jul 15The Norwegian Defence Estates Agency invites tenderers to an open tender contest for the delivery of a mobile heating and ventilation system for plastic halls based on air-air heat pump technology.Schools Energy Pathfinder 2025 - Heat Pump Programme Bundle 1 (KWETB Kildare)
Kildare and Wicklow Education and Training BoardNaasDeadline: Jun 18Mechanical and Electrical M and E plantroom upgrade enabling works including all associated builders works and site works to facilitate heat pump installation at six (6) school site locations in County KildareSchools Energy Pathfinder 2025 – Heat Pump Programme - Bundle 3 (LOETB)
Laois and Offaly Education and Training BoardPortlaoiseDeadline: Jun 09Mechanical and electrical (M&E) plantroom upgrade enabling works, including builder’s works and site works, to facilitate heat pump installation at five school sites: four in County Offaly and one in County Laois.Decarbonisation of Heating Systems at Fota House: Bivalent Air-to-Water Heat Pump Installation
Irish Heritage TrustDublinDeadline: Jul 03Supply, install, and commission a bivalent low-carbon heating system at Fota House, Co. Cork. Includes 3×50kW R290 air-to-water monoblock heat pumps, integration with existing natural gas boilers for peak/backup, 1000L buffer tank, pumps, valves, filters, BMS integration, MID energy meters, and targeted refurbishment of underground radiant coils.Schools Energy Pathfinder 2025 – Heat Pump Programme - Bundle 4 (WWETB)
Waterford and Wexford Education and Training Board_110494WexfordDeadline: Jun 29Electrical (M and E) plantroom upgrade enabling works including all associated builder’s works and site works to facilitate heat pump installation at seven (7) school site locations (6 schools in County Wexford; 1 school in County Waterford).Heat accumulation plant in Lisbjerg Energy Park - Design and build contract 1, New VAK (Accumulation tanks incl. stair towers, walkway, handrails, pipes, valves, electricity and SRO, nitrogen and compressed air systems, instrumentation and safety equipment)
Kredsløb Transmission A/SBrabrandThe project pertains to the turnkey contract for designing and constructing 2 pcs. heat accumulation tanks (hereinafter VAK) each with a usable volume of 50,000 m3, to be located in Energy Park Lisbjerg for Kredsløb Transmission A/S. The turnkey contract encompasses complete, fully operational VAK including design, supply, installation, and connection, as well as testing and commissioning with auxiliary equipment according to the complete tender material. The entire construction project comprises multiple contracts, but these tender conditions solely apply to the turnkey contract for 2 pcs. VAK. Referring to Article 65 of the Utilities Directive, it is stated that the turnkey contract in this tender will not be subdivided into (additional) subcontracts, as the Contracting Authority has determined that, due to the nature of the project, and the financial, liability and execution considerations, it is most suitably addressed under one turnkey contract. Further details of the project are provided in the tender material. No remuneration will be granted for participation in this tender process.Supply, Installation and maintenance of a PEM Electrolyser for Hydrogen Production at JRC Ispra
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsDeadline: Jul 25The procurement entails the design, manufacturing, delivery, installation, and commissioning of a Proton Exchange Membrane (PEM) electrolysis system for hydrogen production at the JRC Ispra site. The core of the system is a 50 Nm3/h electrolyser (which must be upgradable to 100 Nm3/h) that delivers hydrogen at an outlet pressure of 30 barg. The main equipment will be delivered in a containerized/skid version divided into three specific areas: a control panel area with the AC/DC converter, a water purification unit, and an ATEX-classified area containing the stacks and gas purification treatment. In addition to the containerized unit, the scope of supply includes several external components: - An MV/LV transformer - A thermal management system (dry cooler) - A low-pressure hydrogen storage system consisting of a cylinder rack at 30 bar with a total volume of 5 m3 - A gas blender installed on the outlet piping after the storage Finally, the procurement includes a comprehensive service package covering the Factory Acceptance Test (FAT), Site Acceptance Test (SAT), ATEX verification, staff training, two years of spare parts, and a 3-year maintenance contract. Reason for Purchasing The primary objective of this procurement is to produce green hydrogen by harnessing the renewable energy generated from the JRC Ispra site's internal photovoltaic (PV) plant. Currently, the site has a 1.35 MWp PV installation, which is planned to be expanded to 2 MWp and eventually 3 MWp in the future. Instead of using battery systems, the JRC intends to use the excess energy from this PV plant to power the electrolyser for self-consumption. The hydrogen produced will then be blended into the natural gas pipeline (up to a 10% volume blend) to feed the site's co-generators. A dedicated technical sizing analysis concluded that a modular 2x250 kW electrolyser is the optimal choice, as it offers the best compromise between the available PV power, the number of operating hours, and the demand from
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Vattenfall N.V.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.