Electricity Supply Board ( ESB )DublinTED
TR1453 Milltown EPC Solar Farm
TR1453 Milltown EPC Solar Farm
Solar Installation
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Electricity Supply Board ( ESB )
- Published:
- June 07, 2026
- Deadline:
- Not specified
- Topic:
- Solar Installation
- Object:
- Photovoltaikanlage (PV)
Object classification
- Photovoltaikanlage (PV)Primary
Tender description
TR1453 Milltown EPC Solar Farm
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock2 details capturedBidders and contractors · Address
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10FCC/372/23 - Single Party Framework for the design, installation, operation and maintenance of rooftop Solar PV within Fingal County Council's Administrative Area with an Initial for three (3) Public
Fingal County Council_371DublinSingle Party Framework for the design, installation, operation and maintenance of rooftop Solar PV within Fingal County Council's Administrative Area with an Initial for three (3) Public BuildingsNeubau eines Studentenwohnheims mit KITA in Regensburg- CANDIS Academia - Errichtung einer PV-Anlage
Ferdinand Schmack jun. GmbHRegensburgDeadline: Jul 17Errichtung einer PV-Anlage auf dem fertigen Flachdach mit einer entstehenden Anlagenleistung von 122 kWp inklusive eines erweiterbaren Batteriespeichers mit einer Kapazität von mind. 60 kW sowie der dazugehörigen Wechselrichter. Die Unterkonstruktion wurde bereits vom Systemhersteller MW SOLAR by SOPREMA errichtet. Dabei handelt es sich um eine Ost -72° / West 117° Ausrichtung.Solar PV System MRH Portlaoise and CNU Abbeyleix, Co. Laois
Health Service Executive (HSE)KildareDeadline: Jul 21Planung, Installation und Inbetriebnahme von Dach-Photovoltaikanlagen an zwei Standorten - MRH Portlaoise und CNU Abbeyleix, Co. Laois, sowie Machbarkeitsstudie für Carport und überdachte Fußgängerwege am Standort MRH Portlaoise.Århusjordet housing estate - Area 1 - Fyresdal municipality
Fyresdal kommuneFyresdalDeadline: Sep 04Fyresdal municipality constructs 26 residential units at Århusjordet, extension of Folkestadbyen, including garage (carport), outdoor parking, green areas. Prior contracts cover roads, water, sewage, electrical to site border. Buildings have wooden supporting system. Option for standard railings. Project divided into three areas; this procurement is Area 1: three residential buildings (types 04, 06, 07), garage, central heating, buried sanitation, solar panel facility. Turnkey contract per NS 8407. Residences ready for moving by 30.09.2028.Cunningham House Redevelopment at Trinity Hall, Dartry, Dublin 6
Trinity College Dublin the University of Dublin_336DublinDeadline: Jun 29The redevelopment of Cunningham House will consist of an extension to existing purpose-built student accommodation at Trinity Hall with an overall gross floor area of approximately 10,982sqm providing a total of 358 no. purpose-built student bed spaces together with complementary and ancillary uses. The project works will comprise of the demolition of Cunningham House, the Sports Hall (including existing part basement), the eastern section of the historic rear boundary wall and associated single storey ancillary sheds and the provision of 4 no. new connected blocks arranged in a quadrangle form: Block A ranges in height from four to eight storeys; Block B is four storeys in height; Block C is three storeys in height while the Forum Block is single storey in height (partially double height space). The project scope will include: • 358 no. purpose-built student bed spaces • 4 no. staff apartments • 2 no. study spaces/classrooms • A replacement multi-use Sports Hall, together with the adjoining Forum amenity space • Outdoor amenity spaces within the central courtyard together with enhanced public realm and landscaping works • 188 no. bicycle parking spaces within the application site • Single storey security hut at the main vehicular entrance • Works to Oldham House (a Protected Structure) to include works necessary for the demolition and replacement of late 20th century Sports Hall (directly abutting Oldham House). • Provision of a screen wall to the south of Greenane House (a Protected Structure). • All associated and ancillary landscaping works; site lighting; refuse storage; boundary treatments; plant; solar photovoltaic panels; water, wastewater and surface water works; upgrade works to existing electrical substation and all other site and development works.Rudolph-Chaudoire-Pavillon - Errichtung einer Photovoltaikanlage
Technische Universität DortmundDeadline: Jun 10Errichtung einer Photovoltaikanlage auf dem Flachdach des Rudolf-Chaudoire-Pavillons in Dortmund. Die Anlage soll auf einer ca. 5-10 cm dicken Kiesschicht und einer Bitumenbahnen-Dachabdichtung mit Mineralfaserdämmstoff installiert werden. Die Unterkonstruktion für die Module muss sicherstellen, dass die Dachhaut nicht durchdrungen wird.Kaserne Seedorf, Neubau Hallenschießanlage (HSA), Errichtung Photovoltikanlage
Bundesrepublik Deutschland vertreten durch das Staatliche Baumanagement NiedersachsenCuxhavenDeadline: Aug 2526A20103: Kaserne Seedorf, Neubau Hallenschießanlage (HSA), Errichtung Photovoltaikanlage: Demontage 72 Munitionsbehälter, Abbruch von Fundament 108 Stck. Lieferung und Einbau 108 Stck. neue Fundament, Umpflasterung Munitionsbehälter Errichtung einer Photovoltaikanlage mit 182kWp, 455 monokristalline Photovoltaikmodule inkl. Montagesystem für PV-Module. Alle zu verwendenden Holzprodukte müssen nachweislich aus nachhaltiger Waldbewirtschaftung kommen.Erweiterung GBG (Planung und Bau im Paket)
Stadt Kaarst - Die BürgermeisterinKaarstSchlüsselfertige Erweiterung (Planung und Bau im Paket) des Georg Büchner Gymnasiums in Kaarst inkl. Planungsleistungen LPH 1-9. Grund: Umstellung von G8 auf G9 erfordert mehr Schulraum. 2-geschossiger Anbau an der Rückseite des Schulgebäudes, angeschlossen über einen 2-geschossigen Verbindungsgang. Im OG: 8 Klassenräume.Graz, Sandg. 40 PV-Anlage 99 65 kWp-BRG Sandgasse 40 PKS 4144
Bunddar, die nicht als authentische Bekanntmachung bzw. Bekanntgabe angesehen werden kann.Forschungsneubau Material-u.Energie. GC-ElMaR, JLU Gießen
Landesbetrieb Bau und Immobilien Hessen Niederlassung Mitte Zentrale VergabeBad NauheimDeadline: Jul 31Vorinformation zum Forschungsneubau GC-ElMaR der JLU Gießen. Einzelne Fachlose werden ausgeschrieben: Maler-/Innenputz-, Trockenbau-, Estrich-, Bodenbelags-, Fliesen-, Tischler-Festeinbauten, Blendschutz, Baureinigung, Sanitär-/Heizungs-/Kälte-/Raumlufttechnik, Dämmung, Gebäudeautomation, Laborbau, Elektroinstallation (Starkstrom, NEA, Blitzschutz, PV, Schwachstrom, Brandmelde-/BOS-Anlagen, Doppelboden), Aufzug, Außenanlagen, Tiefbau. Tiefbauarbeiten: 4. Quartal 2025; restliche: 4. Quartal 2025 bis 4. Quartal 2026.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Electricity Supply Board ( ESB ).
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.