European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsTED
Supply and maintenance of Radiation Portal Monitoring System
The JRC Karlsruhe plans to purchase a stationary spectroscopy-based radiation portal monitor (SRPM) for the detection and identification of radioactive materials in road vehicles such as cars, vans and small cargo trucks. The SRPM shall be installed within the European Nuclear Security Training Centre at JRC Karlsruhe.
No credit card · Instant access
Content at a glance
The JRC Karlsruhe plans to purchase a stationary spectroscopy-based radiation portal monitor (SRPM) for the detection and identification of radioactive materials in road vehicles such as cars, vans and small cargo trucks. The SRPM shall be installed within the European Nuclear Security Training Centre at JRC Karlsruhe.
- Tender type:
- Tender
- Contracting authority:
- European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs
- Published:
- June 14, 2026
- Deadline:
- July 25, 2026
Tender description
The JRC Karlsruhe plans to purchase a stationary spectroscopy-based radiation portal monitor (SRPM) for the detection and identification of radioactive materials in road vehicles such as cars, vans and small cargo trucks. The SRPM shall be installed within the European Nuclear Security Training Centre at JRC Karlsruhe.
Further details
After registration, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
Documents and attachments
49 files recorded- PDF Notice (BUL)
- PDF Notice (SPA)
- PDF Notice (CES)
- PDF Notice (DAN)
- PDF Notice (DEU)
- PDF Notice (EST)
Related tenders
10- Nordisk Sikkerhet ASBærums VerkDeadline: Jun 15
Supply of a special purpose vehicle for radiation monitoring and post- detection activities
Supply of a modern special purpose vehicle for radiation monitoring and post-detection activities for the State Border Guard Service of Ukraine, to be used in the northern border area near the Chornobyl Nuclear Power Plant and the Chornobyl Exclusion Zone. - European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsDeadline: Jul 25
Supply and Maintenance of Non-Destructive Assay System for Radioactive Waste Measurement
NDA system needed for the measurements of radioactive waste and waste for clearance. Characterization of waste leaving the nuclear controlled areas is a legal obligation. The currently used system is at end of life and for complying with the legal requirements an new system needs to be installed. - Education Procurement Service (EPS)Limerick
LA3468F - UCD - CFT for a Single Supplier Framework Agreement for the Supply, Delivery, Installation, Commissioning and Calibration of a Head Space Gas Chromatograph Instrument
The Medical Bureau of Road Safety (MBRS), University College Dublin, request tenders for the Supply, Delivery, Installation and Commissioning of a Headspace Gas Chromatograph with Flame Ionisation Detection Instrument used for the identification and quantitation of ethanol in biological specimen under Road Traffic Act legislation. The framework budget may be used to purchase three (3) Headspace Gas Chromatograph with Flame Ionisation Detection Instruments over the lifetime of the framework. - Bus Eireann/Irish BusDublinDeadline: Mar 31
Annual Readvertisement of Qualification System for the Purchase and or Leasing of Buses and Coaches for Bus Éireann/Irish Bus - (Annual Readvertisement 3/8 - Amended)
Bus Éireann intends to procure low emission coaches and schools buses, and where possible zero-emission coaches with low environmental impact in compliance with the latest EURO VI Regulation. The vehicles will comply, as appropriate, with the EPA’s guidelines on road transport vehicles and the European Communities (Clean and Energy Efficient Road Transport Vehicles) (Amendment) Regulations 2021. To be considered for inclusion on a Qualification Panel(s), applicants must complete the Pre-Qualification Questionnaire (PQQ) providing relevant details in relation to the criteria set out below for assessment. It is envisaged that this qualification system will be used to either purchase and or lease during the five-year term of the Qualification System. Economic operators apply once to qualify onto the panel by providing details of their financial and technical capacity against predefined published Selection Criteria within a PQQ. The Qualification Panel for the Purchase and or Lease of Buses and Coaches will be broken down in to sub categories called Lot 1 – Purchase of Buses and Coaches Expressway, and Lot 2 – Lease of Buses and Coaches Expressway, Lot 3 - Purchase of School Buses and Coaches, Lot 4 - Lease of School Buses and Coaches, Lot 5 - Purchase of single or double deck city bus type vehicles and Lot 6 - Lease of single or double deck city bus type vehicles. Economic operators can apply for the Lot(s) that best reflect their commercial operations. Economic operators must complete a PQQ for the Lot(s) that they wish to qualify to. Only economic operators who satisfy the selection criteria of each individual Lot will qualify on to that Lot. After the initial advertisement, the panel must be advertised annually for the duration of the panel (5 years) to continually inform the market place of its existence. Economic Operators can apply to qualify on to the panel, throughout the duration of the panel. Economic Operators who are already qualified to the panel can also amend their application at any interval should their financial or technical capacity or capability change. Qualifying onto a panel does not guarantee any work and/or contracts to a supplier. There is no obligation to use the Qualification Panel and contracts can be advertised on an individual basis using the Negotiated Procedure. (Annual Readvertisement 3/8 - Amended) - University College Dublin ( UCD )DublinDeadline: Aug 25
RFT to Establish a Single Supplier Contract for the Supply, Delivery, Installation, Commissioning and Maintenance of Wire Arc Additive Manufacturing System for UCD
The School of Mechanical and Materials Engineering at University College Dublin wish to purchase a Wire Arc Additive Manufacturing System. The equipment is funded primarily by the I Form research centre, which focuses on the digitalisation of advanced manufacturing, with Additive Manufacturing (AM) as one of its exemplars. WAAM is an AM process that will complement our research in this area, focusing on modelling, digital twinning and sustainability. - Carra KitchensCastlebarDeadline: Aug 12
Award of a Contract for Supply, Delivery, Installation, Commissioning, Training and Software Licensing of a CNC Router Line, Dust Extraction System and Associated CAD/CAM Software Licence
Carra Kitchens is investing in advanced CNC manufacturing equipment, dust extraction infrastructure and supporting software in order to diversify and future-proof the business. The investment will support two new strands of activity: a shared-access "CNC Job Shop" offering local makers, tradespeople and small businesses access to advanced digital fabrication, and a new 3D Parametric Wall Art and Commercial Furniture offering targeting the commercial and architectural markets. The investment will also increase the precision, capacity and efficiency of Carra Kitchens' existing bespoke kitchen manufacturing business. This project will allow Carra Kitchens to: • Establish a CNC Job Shop, providing local makers, tradespeople, students and small businesses with access to advanced CNC manufacturing and digital fabrication; • Enter the commercial and architectural furniture and wall art market, opening up new geographic and sectoral markets beyond Mayo; • Increase production capacity, precision and efficiency in its existing bespoke kitchen manufacturing operations; • Create additional employment in a rural location; and • Reduce material waste through digital, precision-based cutting, nesting and production planning. The purchase is subject to successful LEADER funding approval. - Skagen HavnSkagen
Purchase of a high-voltage shore connection (HVSC) including an onshore power system (OPS) and a cable management system (CMS) for the supply of electrical power to cruise ships in Port of Skagen.
On shore power for cruise ships shall be established at the cruise quay Krydstogtkajen in Port of Skagen, 9990 Skagen, Denmark. For this purpose, the Contractor shall deliver a high-voltage shore connection (HVSC) including an onshore power system (OPS) and a cable management system (CMS). The HVSC shall be able to deliver up till 16 MVA of high-voltage onshore power to at least one cruise ship at a time. The Deliverables include a complete converter station and a complete cable management solution from the OPS on to the quay front. The converter station shall be a container-based solution, where all components are to be placed inside containers, except coolers that shall be placed on the ground outside the building, which the Purchaser will build around the containers. The Contractor shall be responsible for groundwork for the CMS. The Contractor shall deliver all necessary documentation and perform training of the personnel who shall operate the HVSC upon Delivery. The HVSC shall be operational by 1st of November 2027. Definitions: High-voltage Shore Connection (HVSC): includes the Onshore Power System (OPS), the Cable Management System (CMS) and the high voltage cable distribution system from the OPS to the quay front. Onshore Power System (OPS): includes all the components necessary to transform, convert and monitor the power on shore, including, but not limited to, transformers, converters, switch gear, breakers and control, monitoring, interlocking and power management systems. Cable Management System (CMS): includes all work, cables and equipment needed from the OPS to the quay front for delivering power to the ships. This includes HV shore distribution systems (from the OPS), shore-to-ship connection and interface equipment and other items necessary for delivering power to the cruise ships. Maintenance: All maintenance necessary for the proper functioning of the HVSC shall be performed by the Contractor during the warranty period. The length of the warranty - Forschungszentrum Jülich GmbH -Team Infrastruktur-JülichDeadline: Aug 05
JARVIS Eine zentrale Plattform für KI Inferenz • Acquisition of AI inference IT equipment including hardware and mandatory software. • Rack infrastructure, including power distribution units (PDU) and cooling distribution units (CDU) optimized for the offered IT equipment. • Delivery and installation services. • Hardware and software maintenance and support services for five (5) years.
Within the context of the installation and operation of the “JU Pioneer for Innovative and Transformative Exascale Research” (JUPITER) supercomputer and the “JUPITER AI Factory” (JAIF), the Jülich Supercomputing Centre (JSC) at Forschungszentrum Jülich (FZJ) envisions to extend the existing Exascale infrastructure, which targets massive scale HPC simulation and Artificial Intelligence (AI) training, with experimental hardware and software focusing on AI inference workloads. The “JUPITER Advanced Research Vehicle for Inference Services” (JARVIS) is tightly integrated with JUPITER and will allow to experiment with hardware and software for AI inference, to support the competitiveness of current and future AI workloads in Europe and to support sovereignty. With this procurement, JSC targets to purchase a heterogeneous system that must be integrated into an existing cloud infrastructure. The system shall provide multiple different purpose optimized components, e.g. • addressing the loading and querying of frontier AI models in a large tightly coupled compute pod with high-speed low-latency interconnect, • providing resources ensuring Confidential Computing (CC), • using an Ethernet compatible interconnect between the different nodes/partitions of the system, • fostering European technology and supply chains, wherever possible[ET1.1]. The system acts as a pilot to experiment with hardware as well as software and operational modes to offer customers an interface to AI inference as well as other AI workloads. - Forschungszentrum Jülich GmbH -Team Infrastruktur-Jülich
JARVIS Eine zentrale Plattform für KI Inferenz • Acquisition of AI inference IT equipment including hardware and mandatory software. • Rack infrastructure, including power distribution units (PDU) and cooling distribution units (CDU) optimized for the offered IT equipment. • Delivery and installation services. • Hardware and software maintenance and support services for five (5) years.
Within the context of the installation and operation of the “JU Pioneer for Innovative and Transformative Exascale Research” (JUPITER) supercomputer and the “JUPITER AI Factory” (JAIF), the Jülich Supercomputing Centre (JSC) at Forschungszentrum Jülich (FZJ) envisions to extend the existing Exascale infrastructure, which targets massive scale HPC simulation and Artificial Intelligence (AI) training, with experimental hardware and software focusing on AI inference workloads. The “JUPITER Advanced Research Vehicle for Inference Services” (JARVIS) is tightly integrated with JUPITER and will allow to experiment with hardware and software for AI inference, to support the competitiveness of current and future AI workloads in Europe and to support sovereignty. With this procurement, JSC targets to purchase a heterogeneous system that must be integrated into an existing cloud infrastructure. The system shall provide multiple different purpose optimized components, e.g. • addressing the loading and querying of frontier AI models in a large tightly coupled compute pod with high-speed low-latency interconnect, • providing resources ensuring Confidential Computing (CC), • using an Ethernet compatible interconnect between the different nodes/partitions of the system, • fostering European technology and supply chains, wherever possible[ET1.1]. The system acts as a pilot to experiment with hardware as well as software and operational modes to offer customers an interface to AI inference as well as other AI workloads. - Danish Ministry of Defence Acquisition and Logistics OrganisationBallerupDeadline: Aug 18
Chartering of additional ARK sealift capacity.
The Danish Defence is putting the acquisition of Chartering of additional sealift capacity (Vessels) up for tender through a Framework Contract based on mini-competition. JMTO ARK is the contracting party of the Danish-German ARK Project (ARK Cooperation) which gives access to strategic sealift. This includes RORO vessels with special ARK features at time charter. The ARK Cooperation includes close coordination with Movement Coordination Centre Europe (MCCE) and 30 other nations joining this Cooperation. The objective of this Framework Agreement is to improve the ARK Project's access to additional sealift capacities including swift access to the civilian shipping market for chartering of primarily additional RORO vessels and occasionally other specific vessels and sea-based platforms and the opportunity to achieve market surveys and information. The Framework Agreement is intended to be used for transportation of varying cargo in terms of items, size and shapes. This includes, but is not limited to, transportation for both national and international military purposes and support of the need for transportation of military equipment and other commodities for sustainment or in support of own or allied military operations, missions, training exercises, humanitarian disaster relief, routine transports and other tasks such as the use of sea-based platforms for various tasks. The chartering method will primarily be based on "TIME CHARTER" or "VOYAGE CHARTER". Secondary chartering methods will be "TRIP TIME CHARTER", "CONTRACT OF AFFREIGHTMENT" and "BAREBOAT/ DEMISE CHARTER". JMTO wants to prequalify suppliers who will assume the role of primary contracting party towards JMTO for all deliveries under the Framework Agreement. The supplier shall bear full contractual responsibility for all services delivered, including chartering of vessels. The supplier may utilise subcontractors (including ship owners/operators) for the performance of the services, but shall remain solely responsible towards JMTO. The supllier must have experience within the civilian RORO market including experience with chartering of RORO vessels and must be able to source and provide sealift options world-wide on request, as well as arrangement of charter agreements primarily within the RORO segment supplemented with the supplier's staff's ability to support chartering of at least one, and preferably two or more, other vessel types (e.g. ROPAX, Ferry, MPP, PCTC, CONT, Heavy lift, Supply vessel and tankers). The supplier shall act as the single contracting party towards JMTO for all charter agreements entered into under the Framework Agreement. This entails that the supplier shall find, offer, contract, deliver and receive payments as charter hire for the vessels. The history of transports conducted by JMTO ARK includes: > Transportation of heavy tracked vehicles, trucks and similar equipment from the continent to the area east of Suez along with sea containers with dangerous goods. > Transportation of containers with chemicals from Syria and Libya to destruction sites at the continent/Northern Europe. > Transportation of vehicles and containers from Eastern Africa to Western Africa in support of the UN Campaign to fight the outbreak of Ebola in this region. > Transportation of heavy tracked vehicles, trucks, small vehicles and con-tainers from Denmark and Allied Nations to and from various exercises and operations, including transports from continent to USA, The Falkland Islands, Western Africa, Mediterranean, East of Suez, Northern Norway, Australia, India, Alaska and Greenland. > Larger exercises and deployments are typically performed during a short period of time which require multiple vessels for the same and short period. The typical duration of Time Charters for this Contract varies from 1 week to 7 months. However, this shall not exclude the possibility to arrange longer charter periods and for some occasions more vessels have been chartered for the same event. JMTO expects that the geographical area of operating will be within the continent-area but can be extended to worldwide operations. Mandatory requirements for the supplier under the Framework Agreement: > The Contractor shall be able to provide RORO vessels at TIME CHARTER and VOYAGE CHARTER. > The Contractor shall be able to provide other types of vessels than RORO at TIME CHARTER and VOYAGE CHARTER. > The supplier shall act as the single contracting party towards JMTO for all charter agreements, assuming full contractual responsibility for the delivery of the chartered vessel. > The supplier shall be accessible 24/7/365 (via switch-board). > The supplier shall be able to provide vessels flagged in NATO and EU countries. > The supplier shall have at least two employees with operational responsibility capable of conducting charter agreements. > The supplier shall have an office in a NATO country at the European Continent. > The supplier's key employees involved in the Framework Agreement shall be eligible to obtain a NATO security clearance, and the process for obtaining such clearance shall be initiated no later than 60 days following contract signature. Tasks requiring security clearance may not be assigned to a supplier that has not obtained the required security clearances. Desired features for the chartering supplier: > Regular issuance of reports describing the shipping market for RORO vessels. > Regular issuance of reports describing the shipping market. > Experience with maritime transport of military equipment including sailing in risk areas (war areas). >Ad hoc delivery (purchase) of report/market analysis for specific shipping segment (s).
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 25. Juli 2026.
- Who is the contracting authority?
- The contracting authority is European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEs.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.