EnerginetFredericiaTED
Supplier Qualification System (“SQS”) – Contractors for gas receiving terminal projects
Energinet intends to establish a Supplier Qualification System (“SQS”) for the procurement of Contractors for gas receiving terminal projects. The SQS is intended for the procurement of Contractors for gas receiving terminal projects such as the Baltic Pipe project, as well as for other projects on the Danish transmission system. The scop...
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Energinet
- Published:
- August 26, 2026
- Deadline:
- Not specified
Tender description
Show full descriptionCollapse description
Energinet intends to establish a Supplier Qualification System (“SQS”) for the procurement of Contractors for gas receiving terminal projects. The SQS is intended for the procurement of Contractors for gas receiving terminal projects such as the Baltic Pipe project, as well as for other projects on the Danish transmission system. The scope of the SQS is the supply of Contractors for gas receiving terminal projects which in-terested companies have to document competences, experiences and references within. The SQS consists of one main category. Category 1) Contractors for gas receiving terminal projects, For further details on the scope of the SQS please refer to the document – Guide to SQS – on EU-Supply.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
5 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock6 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0000
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
10Supplier Qualification System for EPCM consultant for the Danish hydrogen backbone
Energinet Systemansvar A/SFredericiaThe Danish Hydrogen Backbone project (DHB) is a comprehensive effort to establish a hydrogen infrastructure in Denmark, connecting planned large-scale hydrogen production in Denmark, produced from renewable energy sources such as wind and solar, with the German and European hydrogen markets. The project is part of the European hydrogen infrastructure and significantly contributes to the EU's goals of climate neutrality and reduction of greenhouse gas emissions. The full backbone is planned to extend all the way from underground storage in the northern part of Denmark (Lille Torup) to the German border (Frøslev), but a political decision has been made to initially focus on building the southern part of the system (DHB1), and thereby having this part operational by the end of 2030. The purpose of establishing the SQS is to be able to tender for full-service consultancies (EPCM suppliers), who can support Energinet in building the DHB. The EPCM supplier will function as a strategic partner to Energinet and will be required to deliver on wide area of Engineering, Procurement and Construction-Management activities, while simultaneously engaging in the overall project-management organization in Energinet. The EPCM supplier is expected to be responsible for the areas of: a) design (this includes producing and developing the detailed design); (b) procurement of necessary materials and equipment; (c) management and administration of the construction contracts. DHB1 includes the conversion of 88 km 30” methane pipeline (one out of two parallel pipelines) and the establishment of 45 km 36” hydrogen pipeline including L/V-stations and PLR-stations, along with metering and regulation stations on the mainline as well as branch off connection stations for hydrogen producers and consumers. The decision to initially build only DHB1 reflects a pragmatic approach for developing a scalable hydrogen infrastructure that can be expanded as market demand and production capacity grow. The first call for tender on the SQS will include an EPCM contract for DHB1 and potentially options for additional parts of the full DHB. Further EPCM contracts are expected to be tendered under the SQS, when political decisions for the remaining parts of the DHB are sin place.Invitation to Tender for Building (Mechanical and Electrical) Consultancy Services for an Emergency Works Project for the replacement of the gas systems including entire pipework, gas cocks and suppli
Kildare and Wicklow Education and Training BoardNaasDeadline: Sep 20On behalf of the Kildare and Wicklow Education and Training Board (the Contracting Authority for this project), you are hereby invited to tender for Mechanical and Electrical Consultancy Services for the above. The project consists of the replacement of the gas systems including entire pipework, gas cocks and supplies to fume cupboards in science labs at Confey College, Leixlip, Co. Kildare. Please see Emergency Works Report attached for further information."Invitation to Tender for Building (Mechanical and Electrical) Consultancy Services for an Emergency Works Project for replacing the gas operated water generator system in Coláiste Chraobh Abhann, C
Kildare and Wicklow Education and Training BoardNaasDeadline: Aug 23On behalf of the Kildare and Wicklow Edcuation and Training Board (the Contracting Authority for this project) you are hereby invited to tender for Mechanical and Electrical Consultancy Services (including buying in of additional services for other disciplines as required) for the above project. The project consists of replacing the gas operated water generator system in Coláiste Chraobh Abhann, Creowen, Kilcoole, Co. Wicklow. Please see Emergency Works Report attached for further information.26/027 - Professional Services Qualification System for the Strategic Gas Emergency Reserve
Gas Networks IrelandCorkDeadline: May 05Gas Networks Ireland (GNI) is establishing a Qualification System for the provision of professional advisory and support services to assist GNI in delivering the Strategic Gas Emergency Reserve (SGER). Applicants may apply for qualification in the following lots: Lot 1: Commercial advisory services for the procurement and contract management of Liquefied Natural Gas (LNG) and other gas commodities, Lot 2: Commercial operations and regulation advisory and support services, Lot 3: Marine advisory and support services, Lot 4: Project and programme management advisory and support services, Lot 5: Financial advisory and support services, Lot 6: Insurance advisory and support services, and Lot 7: Specialist advisory and support services. Applicants may apply for and qualify in one or more Lots.26/034 - A Qualification System for the provision of Engineering, Procurement, Construction, Operation and Maintenance Services for the Strategic Gas Emergency Reserve
Gas Networks IrelandCorkDeadline: Jul 25Gas Networks Ireland (GNI) is establishing a Qualification System for the provision of Engineering, Procurement, Construction (EPC) works and services (Lot 1) and Operation and Maintenance (O&M) services (Lot 2) for the Strategic Gas Emergency Reserve (SGER). Lot 1 is for the engineering, procurement, and construction works and services to complete infrastructure assets including but not limited the jetty, trestle, topside structures, pipelines, above ground installation (AGI), integration with FSRU, onshore terminal systems, related ancillary and enabling utilities to site and the management of nominated subcontractor(s). Lot 2 is for operation and maintenance services in relation to jetty, trestle, topside structures, pipelines, integration with FSRU, onshore terminal systems that may be required from time to time to facilitate the operation of the SGER. The Lot 2 contractor will be novated to the Lot 1 contractor for the duration of the EPC period, commissioning and defects correction period, with a subsequent three-year operation and maintenance period commencing from completion of commissioning. A further O&M period of up to five years is anticipated following completion of the initial period. Applicants may apply for and qualify in one or more Lots. GNI has immediate requirements which may be tendered in the near future, through an Initial Competition. Applicants who are interested in participating in the Initial Competition must submit their QSQ responses through the eTenders system by 12.00hrs (Irish time) 18th September 2026, unless amended.PEACEPLUS - Distillery Street Open Space
Belfast City CouncilBelfastDeadline: Aug 28**NOTE this is not an above threshold exercise but is a notice to highlight this tender is live on eSourcing NI** The contract is for the provision of Distillery Street Open Space The contract is for the provision of the Distillery Street Open Space project, comprising the construction and completion of a new public open space and associated site works. The works are expected to include, but are not limited to, site preparation and enabling works, earthworks and grading, hard and soft landscaping, planting, paving, street furniture, lighting, drainage, utility coordination, accessibility measures and other associated infrastructure necessary to deliver a high quality public open space. The project is located within a live urban environment and will require careful planning, programming and stakeholder management to minimise disruption to surrounding residents, businesses and ongoing development activities. The works will be undertaken in accordance with all relevant statutory requirements, health and safety legislation, environmental obligations and project-specific quality standards. The Contractor will be responsible for delivering the works in accordance with the contract documents and programme, achieving all required milestones and handover requirements, and ensuring that the completed open space is fit for purpose and meets the Employer's objectives for quality, sustainability and community benefit.Dublin City Council - Contract for Dodder Greenway Milltown Road - Dodder Walk to Dundrum Road Active Travel Scheme
Dublin City CouncilDublinDeadline: Aug 27Dublin City Council aims to enhance the quality of life for its residents by developing an integrated Active Travel Network. This comprehensive network is designed to foster connections among individuals via pedestrian pathways, segregated cycle provision, and other environmentally friendly transportation alternatives. The enhancement of accessibility and interconnectivity for people walking, wheeling and cycling within this network is anticipated to play a pivotal role in mitigating carbon emissions originating from transport activities. The council’s objective is to augment the existing 40km network into a seamlessly connected 314km network spanning the entire city. The Dodder Greenway Milltown Road - Dodder walk to Dundrum Road Active Travel Scheme is one of the projects identified under this initiative. The Dodder Greenway Milltown Road - Dodder walk to Dundrum Road Active Travel Scheme extends along Milltown Road between Dodder walk and Dundrum Road for a length of 1.2km. The Scheme includes the provision of segregated cycle facilities, improved pedestrian facilities (footpath and junction upgrades), ducting, resurfacing etc. the scheme also includes the upgrade of two signal-controlled junctions to improve pedestrian and cyclist facilities, the two junctions are: Milltown Rd and Churchtown Rd junction and Milltown Rd and Dundrum Rd junction. The Scheme comprises: - Re-configuration of existing carriageway for inclusion of cycle provision - Site Clearance - Pavement works - Kerbs and Footways - Traffic Islands - Public lighting - Traffic signs and road markings - Drainage works - Traffic signals and Ducting - Utilities upgrades - Landscaping and Urban Realm Works - Bus Shelters (foundation only) - Bike Stands - Temporary Traffic Management Please note that this project is subject to funding. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 8702210Abriss eines Funkmastes in der SM Nauen
Landesbetrieb Straßenwesen Brandenburg, DS WünsorfZossen OT WünsdorfDeadline: Sep 20Demontage Stahlgittermast und Fundament sowie Entsorgung und Verfüllung der Grube Demontage des Stahlgittermastes aus dem Jahre 1993 mit einer Höhe von ca. 30 m, bestehend aus 4 Sektionen. Die Länge und Breite des Hauptfundamentes beträgt 2,70 m mit einer Tiefe von 2,00 m, darauf sitzt ein dreieckiges Sockelfundament mit einem Schenkelmaß von 1,50 m und einer Erdüberdeckung von 0,20 m. Das Fundament ist laut Zeichnung aus Stahlbeton B 25. Nach der Demontage aller Teile muss die Grube mit Erdreich aufgefüllt werden und der Umgebung höhenmäßig angepasst werden.Errichtung einer Photovoltaik-Dachanlage mit Energiespeichersystem Rathaus
Gemeinde WaldfeuchtWaldfeuchtHauptmassen: Installation einer PV-Anlage auf dem Dach des Rathauses mit Speicher PV Leistung 11,61 kWp Speicher 14,00 kWhUnterkunft zur Vorübergehenden Unterbringung von Flüchtlingen , Einbau von Edelstahlküchen
Landeshauptstadt MünchenDeadline: Jul 31Unterkunft zur Vorübergehenden Unterbringung von Flüchtlingen , Einbau von Edelstahlküchen Lieferung und Montage Küchentechnik in Edelstahl 1 Stck. Arbeitstisch mit Spülbecken, Einbau-Kochfeldern und Backöfen zur Aufstellung auf bauseitigem Fußboden Ausführung: Abmessungen 3.270 x 600 x 900 mm 1 Stck. Arbeitstisch mit Spülbecken, Einbau-Kochfeld und Backofen zur Aufstellung auf bauseitigem Fußboden Ausführung: Abmessungen 3.120 x 600 x 900 mm Ausführung: sämtliche Bauteile aus CrNi 1.4301 1 Stck. Arbeitstisch mit Spülbecken, Einbau-Kochfeldern und Backöfen zur Aufstellung auf bauseitigem Fußboden Ausführung: Aufstellung in L-Form, Stöße vollflächig verschweißt 1 Stck. Arbeitstisch mit Spülbecken, Einbau-Kochfeldern und Backöfen zur Aufstellung auf bauseitigem Fußboden Ausführung: Aufstellung in L-Form, Stöße vollflächig verschweißt 1 Stck. Arbeitstisch mit Spülbecken, Einbau-Kochfeldern und Backöfen zur Aufstellung auf bauseitigem Fußboden Ausführung: Abmessungen 3.230 x 600 x 900 mm Ausführung: sämtliche Bauteile aus CrNi 1.4301 und verschliffen Abmessungen Schenkel 1: 3.100 x 600 x 900 mm Abmessungen Schenkel 2: 1.530 x 600 x 900 mm Ausführung: sämtliche Bauteile aus CrNi 1.4301 und verschliffen Abmessungen Schenkel 1: 2.450 x 600 x 900 mm Abmessungen Schenkel 2: 2.280 x 600 x 900 mm Ausführung: sämtliche Bauteile aus CrNi 1.4301 1 Stck. Arbeitstisch mit Spülbecken, Einbau-Kochfeldern und Backöfen zur Aufstellung auf bauseitigem Fußboden Ausführung: Abmessungen 2.800 x 600 x 900 mm Ausführung: sämtliche Bauteile aus CrNi 1.4301 1Stck. Arbeitstisch mit Spülbecken, Einbau-Kochfeldern und Backöfen zur Aufstellung auf bauseitigem Fußboden Ausführung: Abmessungen 2.800 x 600 x 900 mm Ausführung: sämtliche Bauteile aus CrNi 1.4301 1Stck. Arbeitstisch mit Spülbecken, Einbau-Kochfeldern und Backöfen zur Aufstellung auf bauseitigem Fußboden Ausführung: Aufstellung in L-Form, Stöße vollflächig verschweißt und verschliffen Abmessungen Schenkel 1: 3.000 x 600 x 900 mm Abmessungen Schenkel 2: 3.430 x 600 x 900 mm Ausführung: sämtliche Bauteile aus CrNi 1.4301 1Stck. Arbeitstisch mit Spülbecken, Einbau-Kochfeldern und Backöfen zur Aufstellung auf bauseitigem Fußboden Ausführung: Abmessungen 4.040 x 600 x 900 mm eine Seite des Arbeitstisches abgeschrägt Ausführung: sämtliche Bauteile aus CrNi 1.4301 Scherenbühne zur Einbringung der langen Elemente ist 1., 2. und 3.OG
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Energinet.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.