Vinje KommuneVinjeTED
Sketch project - Foot and cycle path from Harkjellstaul to Raulandsgrend
Vinje municipality invites prequalified tenderers in the municipality ́s dynamic procurement scheme for engineering design services to provide tenderers for a sketch project and route assessment for the vidareføring of foot and cycle paths from Harkjellstaul to Kråmvikvegen in Rauland, including planning of new lakes and unloadings along ...
Civil Engineering Design
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Vinje Kommune
- Published:
- August 03, 2026
- Deadline:
- Not specified
- Topic:
- Civil Engineering Design
Tender description
Show full descriptionCollapse description
Vinje municipality invites prequalified tenderers in the municipality ́s dynamic procurement scheme for engineering design services to provide tenderers for a sketch project and route assessment for the vidareføring of foot and cycle paths from Harkjellstaul to Kråmvikvegen in Rauland, including planning of new lakes and unloadings along the same stretch. The assignment includes the preparation of route assessments with the accompanying planning and profile reviews and cost estimates. Tenderers shall submit a joint report that assesses alternatively and adds a licence for further detailed engineering design services. The contract will be signed as a fixed-price contract based on NS 8401 Qualification requirements beyond the DIO companies. Tenderers shall have documented experience from engineering design services for foot and cycle paths and/or road science sketch projects in similar terrain, including work on routes, terrain adaptation, sharpening/filling and assessment of traffic roads. Tenderers shall, in addition, have experience from engineering design services for water and sewage hire installations in connection to roads or foot and cycle paths, including assessments of location, djupner, crossings and coordination with other infrastructure. Tenderers shall have: * relevant competence in road and transport disciplines (foot and cycle paths), including experience with the use of the Norwegian Public Roads Administration ́s handbooks and geometric engineering design. * relevant water and sewage professional competence with experience from dimensioning and principle appraisal of main areas for lakes and sewage. * experience with terrain models and development of plan/profile thinking in modern engineering design tools. * experience from engineering design services or concept works in hilly terrain and an area with local buildings.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10BME EEA 2026-06 Framework agreement for the operation and maintenance of Small pudding foot and cycle bridges.
Bergen kommune - Bergen VannBERGENThe contract is for the operation and maintenance of the foot and cycle bridge "Småpudden". Smallpudden bridge is a flap bridge over Damsgårdssundet in Bergen, which can be opened for boat traffic. This is an important route for foot and cycle and it is important that it works at all times. The interaction between the function such as the Foot and Cycle Path and opening for boat traffic must be taken care of.E10 Evenes airport crossing
Statens vegvesenMossThe project E10 Evenes Airport Crossing comprises engineering design services for and the construction of new and safe access to Evenes airport for vehicles and soft road users. The contract includes: - Engineering design services - Construction of a detour road - Demolition of the existing Nautå bridge. - Construction of the upgraded E10, arm to the airport, partly raising the road in the current horizontal line, partly new construction of the road. - Two bridge constructions over the Nautå River T-junctions. - One-lane roundabout - Foot/cycle path along Flyplassveien - Access road to a new pump station and parking area. - System for handling surface water from roads, electrical installations and landscapes. - On behalf of the Fie (Joint Infrastructure Evenes): Engineering design services for and the construction of necessary municipal water and sewage pipelines. - Construction of a access screen for the Norwegian Defence and an option for an extension of thisDK9505 Nord-troms 2027-2032
Statens vegvesenMossDeadline: Aug 05The assignment comprises operational and maintenance assignments, with function responsibility for some of the assignments, on national roads and national foot/cycle paths as well as selected county roads with the accompanying side facilities, side areas, equipment and installations, in Storfjord, Kåfjord, Nordreisa, Kvænangen, Alta and Kautokeino municipalities in accordance with the road list given in chapter. D2-V1 and D2-S20. The contract will be valid from 01.09.2027 to and including 31.08.2032 for all the assignments that have been described. The road network included in the assignment (including metrated arms, ramps, junction parts and side-system parts, but not including annexes or oncoming roadways) consists of: 561,551 km road in total whereof 481,411 km national road 18,432 km county road 61,709 km national foot and cycle path The work will be settled with a round sum for round sum processes, in accordance with quantities and unit prices for other processes and as maths works in accordance with hourly rates for crews and machines. By agreement, the parties can extend the contract to also apply for a period of further 12, 24 or 36 months, cf. chapter C3, point 21 (cf. C4, point 10). The builder has the option to extend the contract for 12 months, from and including 1 September in the year. the contract had been agreed to terminate (i.e. either at the end of the original contract period, or at the end of extended contract period in accordance with the previous section), up to and including 31 August the following year.Betriebs- und Unterhaltsarbeiten an Nationalstraßen, Kreisstraßen und Wegen in Storfjord, Kåfjord, Nordreisa, Kvænangen, Alta und Kautokeino (2027-2032)
Statens vegvesenMossDeadline: Aug 05The assignment comprises operational and maintenance assignments, with function responsibility for some of the assignments, on national roads and national foot/cycle paths as well as selected county roads with the accompanying side facilities, side areas, equipment and installations, in Storfjord, Kåfjord, Nordreisa, Kvænangen, Alta and Kautokeino municipalities in accordance with the road list given in chapter. D2-V1 and D2-S20. The contract will be valid from 01.09.2027 to and including 31.08.2032 for all the assignments that have been described. The road network included in the assignment (including metrated arms, ramps, junction parts and side-system parts, but not including annexes or oncoming roadways) consists of: 561,551 km road in total whereof 481,411 km national road 18,432 km county road 61,709 km national foot and cycle path The work will be settled with a round sum for round sum processes, in accordance with quantities and unit prices for other processes and as maths works in accordance with hourly rates for crews and machines. By agreement, the parties can extend the contract to also apply for a period of further 12, 24 or 36 months, cf. chapter C3, point 21 (cf. C4, point 10). The builder has the option to extend the contract for 12 months, from and including 1 September in the year. the contract had been agreed to terminate (i.e. either at the end of the original contract period, or at the end of extended contract period in accordance with the previous section), up to and including 31 August the following year.Framework agreement for planning and engineering design services in Vestfold county.
Vestfold fylkeskommuneTØNSBERGDeadline: Aug 31Vestfold county, c/o the transport sector, will enter into parallel framework agreements with 3-5 tenderers for the provision of planning and engineering design services, mainly for the county road.Framework agreement for planning and engineering design services in Vestfold county.
Vestfold fylkeskommuneTØNSBERGDeadline: Sep 14Vestfold county, c/o the transport sector, will enter into parallel framework agreements with 3-5 tenderers for the provision of planning and engineering design services, mainly for the county road.Winter maintenance on municipal roads and open spaces in Flesberg municipality - Lot 4 Lyngdal
Flesberg kommuneLampelandDeadline: Aug 10The contract is for the procurement of services for the maintenance of winter maintenance of municipal roads, pavements, foot/cycle paths and places in accordance with the attached area map. See annex 1, the Assignment Description, for further details. There are 1 freestanding area that a tender will be submitted for: Lot 4: Lyngdal including gravel roads. The contract period is 2 years. There is a unilateral option for Flesberg municipality for a further 1 year at a time for a 3 year extension of the contracts. I.e. a maximum of 5 years.Winter maintenance on municipal roads and open spaces in Flesberg municipality - Lot 4 Lyngdal
Flesberg kommuneLampelandThe contract is for the procurement of services for the maintenance of winter maintenance of municipal roads, pavements, foot/cycle paths and places in accordance with the attached area map. See annex 1, the Assignment Description, for further details. There are 1 freestanding area that a tender will be submitted for: Lot 4: Lyngdal including gravel roads. The contract period is 2 years. There is a unilateral option for Flesberg municipality for a further 1 year at a time for a 3 year extension of the contracts. I.e. a maximum of 5 years.Celbridge Hazelhatch Mobility Corridor (Phase 5 to 7)
Kildare County Council_385NaasDeadline: Aug 25Detailed Design, Construction Administration and Project Handover of all scheme works, as approved or modified by An Coimisiún Pleanála. Approximately 2.0 km of new single carriageway mobility corridor extending from the R403 Clane Road to the R405 Hazelhatch Road, incorporating high quality active travel provision throughout. A new 66m long clear span bridge crossing of the River Liffey, designed in accordance with relevant Eurocodes and OPW requirements, with no in stream works required. Segregated footpaths and cycle facilities provided along the full length of the route, including: 2.0m wide one way cycle tracks and 2.0 m wide footpaths on both sides of the carriageway for the majority of the corridor; and a 3.0 m wide two way cycle track and footpath on constrained sections approaching Hazelhatch and Celbridge Train Station. New and upgraded junctions including signalised junctions at the R403 Clane Road, Newtown Road and R405 Hazelhatch Road, together with a priority junction at Simmonstown Manor Road and improvements to the Loughlinstown Road roundabout. Public lighting, drainage and SuDS infrastructure, including roadside drainage systems and attenuation features designed to limit discharge to greenfield run off rates and improve existing flood risk conditions. Landscaping, planting and biodiversity measures, including native species woodland and hedgerow planting, tree planting and integration of sustainable drainage features, delivering a net biodiversity gain along the corridor. Utility diversions, protections and accommodation works, including foul and surface water drainage infrastructure, watermains, ESB, Gas Networks and telecommunications assets, as required to facilitate delivery of the scheme. The Consultant shall undertake an Infrastructure Review in conjunction with Kildare County Council, relevant utility providers and other key stakeholders. All environmental mitigation, monitoring and reporting required under the Appropriate Assessment process, Natura Impact Statement, Flood Risk Assessment, and associated environmental and technical assessments accompanying the Section 177AE application. Please ensure you ASSOCIATE your company with this competition in order to seek and receive clarifications. Tenderers must upload their submissions in a zipped file format.Winter maintenance on municipal roads and squares in Flesberg kommune - Area 3 Flesberg village
Flesberg kommuneLampelandDeadline: Aug 10Winter maintenance services for municipal roads, pavements, foot/cycle paths and places in Flesberg village (Area 3). Contract period: 5 years, with unilateral option for up to 5 additional years (max 10 years). Details in annex 1.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is Vinje Kommune.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.