The Rotunda HospitalDublin 1TED
Rotunda Hospital Dublin – BMS / BEMS Upgrade Works
Die Rotunda Hospital schreibt die Planung, Lieferung, Installation und Inbetriebnahme von BMS/BEMS-Upgrade-Arbeiten in einer akuten Krankenhausumgebung aus. Umfasst Aufrüstung der bestehenden BMS-Infrastruktur, Integration mit bestehenden Anlagen, Grafik, Steuerung, Alarme, Trendprotokollierung, Inbetriebnahme, Schulung und Lebenszyklus-S...
Electrical Installation, Building Automation
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- The Rotunda Hospital
- Published:
- July 01, 2026
- Deadline:
- July 27, 2026
- Topic:
- Electrical Installation
- Object:
- Krankenhaus / Klinik
Object classification
- Krankenhaus / KlinikPrimary
Tender description
Die Rotunda Hospital schreibt die Planung, Lieferung, Installation und Inbetriebnahme von BMS/BEMS-Upgrade-Arbeiten in einer akuten Krankenhausumgebung aus. Umfasst Aufrüstung der bestehenden BMS-Infrastruktur, Integration mit bestehenden Anlagen, Grafik, Steuerung, Alarme, Trendprotokollierung, Inbetriebnahme, Schulung und Lebenszyklus-Support. Tenderer müssen Phaseneinteilung, Koordination, Arbeiten außerhalb der Geschäftszeiten und Maßnahmen zur Vermeidung von Unterbrechungen des Krankenhausbetriebs berücksichtigen.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock4 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10Fire Remediation Works at Belarmine, Dublin 18
Clúid Housing AssociationDublinDeadline: Aug 07The project involves the execution of fire remediation works to an existing 53-unit residential development located at Belarmine Ave, Stepaside, Dublin 18, on behalf of the client, Clúid Housing. The objective of the works is to address identified fire safety deficiencies in order to bring the building into compliance with current fire protection and life safety standards outlined in TGD Part B (Fire Safety) of the Building Regulations and other relevant codes such as IS 3218:2913 for fire alarm systems. The development consists of occupied apartment units located above a ground floor level containing commercial units, which are excluded from the scope of this contract. The scope of the remediation works includes, but is not limited to: • Installation of fire-stopping systems at service penetrations and wall/floor junctions. • Replacement or upgrade of fire-rated doors, closers, and seals to comply with TGD-B. • Retrofitting of cavity barriers around gas flues and at every floor level. • Building a bin store in the basement with a ventilation system. • Fire alarm cable rerouting and improvements to service risers and shafts. • Sealing of socket/switch boxes within fire-rated partitions. • General improvement of compartmentation and passive fire protection measures. All works will be undertaken within a live residential environment, requiring a high level of coordination to minimise disruption to residents.Upgrade Works zu Clubhouse Facilities – SAUL Theme 1
Newry Mourne and Down District CouncilNewryDeadline: Jul 25Auftragnehmer werden für die SAUL Theme 1 – Upgrade Works to Clubhouse Facilities (PP1018) nach NEC‑4 ECSC‑Kurzvertrag gesucht. Die Arbeiten erfolgen in besetzten Räumen, Laufzeit 6 Wochen, Beginn nicht vor Mitte August 2026. Kostenrahmen ca. £84.420 (zzgl. MwSt.). Angebote bis 12 Uhr 22. Juli 2026 einzureichen. Projekt wird von PEACEPLUS (SEUPB) unterstützt.IDA Cork 10No. Sites Public Lighting Upgrade Works
IDA IrelandDublinDemontage und Rekonstruktion von Beleuchtungspfosten und Leuchten, Ersatz von Rohren und Kabeln, Ersatz und Installation neuer Verteilerequipments sowie Wiederherstellungsarbeiten und alle zugehörigen Baumaßnahmen an 10 Standorten in Co. Cork.Energy Upgrade Works at Áras an Chontae, Castlebar and Westport Leisure Park, Westport.
Mayo County Council_1127CastlebarDeadline: Jul 28The Works comprise energy retrofit measures to four no. buildings in the ownership of Mayo County Council, located across two sites within County Mayo. The Áras an Chontae Campus, Castlebar, comprises three no. buildings: the Architects Office / RTC, the Annex Building, and the Áras Headquarters. Westport Leisure Park comprises one no. standalone building in Westport. All buildings are to receive energy retrofit works as part of the Energy Efficiency and Decarbonisation Pathfinder Programme.MetroLink, Dublin – M120 Heavy Civils Enabling Works Framework Agreement
Transport Infrastructure Ireland (TII)DublinDeadline: Jul 24The M120 Heavy Civils Enabling Works Framework Agreement (the M120 Framework) will provide civil engineering works for the MetroLink programme. The scope of works for the M120 Framework will comprise a combination of the following: Site set up and hoarding installation; Logistics and welfare management; Utilities diversions and works; Site clearance and removal of materials; Surveys and/or ground investigations; Bulk earth and rock excavation works; Construction and outfitting works; Building construction and fit-out; Construction of single or multi-span viaducts, overbridges, under bridges and walkways over or under live carriageways and waterways, retaining walls and guide walls, diaphragm walls, secant piling and contiguous piling, rock bolts, anchors, capping beams, shotcrete works, mesh works, sealing of fissures etc., underground and above ground reinforced concrete structures and associated temporary works/propping/other reinforcement works; Monitoring of settlement and ground movement and associated remedial works; De-watering and water treatment/disposal management; Site waste management; Mechanical , electrical and plumbing works as required, perform the roles of PSDP and PSCS; Structural, civil, and engineering design; Any other related works. The procurement of the M120 Framework (the Competition) will be conducted under the European Union (Award of Contracts by Utility Undertakings) Regulations 2016 (as amended) (SI 286/2016), and will be managed by TII, acting as the contracting authority, who will be the sole point of contact for applicants. The M120 Framework will be a multi-party Framework Agreement (per Regulation 50 of the Utilities Regulations) consisting of two (2) value based lots. The competition will be structured as a two-stage process with Stage 1 the Selection Stage and Stage 2 the Tender Stage. A maximum of three (3) tenderers will be appointed to each lot. Applicants may apply for one (1) lot only. A tenderer appointed to either lot under the M120 Framework is not precluded from participating in other MetroLink projects or contract packages. The lots are as follows: Lot 1 - Heavy Civils Enabling Works for Call-off Contracts with an estimated value of €50 million or more (excluding VAT) and those determined by the Contracting Authority to be complex call-off contracts of any value which may require specific technical or specialist resources. Lot 1 will tunnel portals, single or multi span viaducts, and other contract packages. Lot 2 - Heavy Civils Enabling Works for Call-off contracts with an estimated value less than €50 million (excluding VAT) except those to be included in Lot 1. Lot 2 will consist of call-off contracts for elements of civils works, which may include retaining walls, other foundation/support works. Conduct of the Competition Stage 1: The Selection Stage will commence with the publication of a Pre-Qualification Questionnaire (PQQ) by TII. This will assess applicants based on defined selection criteria for each lot, such as their financial and economic standing, technical capability, and relevant experience. Provided that there is a sufficient number of applicants for each lot, five (5) applicants for each of the two (2) lots will be shortlisted. If less than five (5) applicants meet the minimum requirements for a lot, TII reserves the right to proceed with those applicants to the second stage of the procurement for that lot. The PQQ process to establish both lots will run concurrently. Stage 2: The Tender Stage for the award of the framework and first call-off contracts will commence with TII issuing the Invitation to Negotiate (ITN) to each tenderer for that lot. Following the submission and evaluation of ITN tenders, TII reserves the right to engage in further negotiations with tenderers. Following the negotiation phase, TII may request the submission of Best and Final Offers (BAFOs). The three (3) highest ranked tenderers under each lot will be appointed to the M120 Framework and will be eligible to compete for future call-off contracts. The 4th and 5th ranked tenderers under each lot will be reserve tenderers. If during the term of the M120 Framework a framework contractor no longer meets the financial and economic standing requirements in the PQQ or does not submit a tender in response to a call-off tender for three or more call-off contracts in a row then TII reserves the right to terminate the framework agreement with that contractor and appoint one of the reserve tenderers to the M120 Framework. Furthermore, the highest ranked tenderer under each lot will be awarded the first call-off contracts under each lot: Lot 1 award of the contract for the Dublin Airport station box (see 5.1 Lot: LOT0001); Lot 2 award of the contract for excavation and pile removal works near to Tara Street station (see 5.1 LOT 0002). Future call off contracts will be awarded by way of mini-competition following the issue of the call-off tender document to the framework members. Detailed information regarding the award criteria for the future / subsequent call-off contracts after the first call-off contracts will be communicated to tenderers appointed to each lot of the M120 Framework as they arise based on TII’s requirements. The M120 Framework may also be used by Iarnród Eireann - Irish Rail to procure call-off contracts for heavy civil engineering works at or adjacent to Glasnevin station (including, without limitation, retaining wall construction, ground stabilisation, utility diversions, interface works with the MetroLink alignment, and preparatory or enabling works necessary to facilitate the integration of MetroLink with the existing Irish Rail network at that location), provided that the works in question fall within one or more of the categories of work set out in the scope of works for the M120 Framework. Refer to the PQQ documents for further information.TUS International Arena Sports Lighting and Controls Upgrade Works
Technological University of the Shannon: Midlands Midwest (TUSMM)LimerickModernisierung der Sportbeleuchtung und Steuerung in der TUS International Arena.IDA Dangan Infrastructure Upgrade Works
IDA IrelandDublinThe scheme includes the upgrade of the civil infrastructure within the IDA Dangan BTP in GalwayElectrical work for Namsos Hospital
SYKEHUSINNKJØP HFVADSØDeadline: Aug 26Ziel ist der Abschluss von Rahmenvereinbarungen für Elektroarbeiten inkl. zugehörigem Material, um den Bedarf der Auftraggeberin an Betrieb, Instandhaltung und Weiterentwicklung der Gebäude zu decken. Die Leistungen umfassen unvorhergesehene und geplante Instandhaltungsaufgaben sowie Projekte. Das Namsos‑Krankenhaus umfasst ca. 33.000 m², ergänzt durch mehrere kleinere Gebäudekomplexe in der Umgebung. Anfragen werden vom 16.07.2026 bis einschließlich 09.07.2026 nicht beantwortet.Contract for Building Works at Port Centre for Dublin Port Company
Dublin Port Company_411DublinThe work will include the appointment of a contractor to carry out: - Fire Cert and associated works. - DAC and associated works. - New alterations to the ground floor, reception, and mezzanine. - Essential repair works to the fifth floor to improve insulation and resolve water ingress issues. - Upgrade the fifth floor by removing and raising the existing roof, replacing the external façade with a new louvred façade allowing the floor plate to extend out to the perimeter - Upgrade building fabric and services to meet 2050 energy targets. - Alterations to lower ground floor to include new shared facilities, larger meeting room, changing facilities, etc - Office internal fit-out and new partitions and ceilings are to be upgraded. - MEP works: - Update Fire Alarm - Install Fire Fighting Lift - Install Smoke Extract System - Update Fire Fighting Services Generator - Update Services Local to Core - Ventilation, Water, Lighting - Upgrade M and E services to each floor plate to suit the new building envelope façade design. - Upgrade to M and E central plant (i.e. central heat pump etc.) - Upgrade sub-metering to tenant zones is required. - Provision of PV array to assure compliance with CAP 2030-2050 - External works.Works Contract for Proposed Modular Expansions and Internal Refurbishment Works to Emergency Department at Beaumont Hospital
Beaumont Hospital_403DublinDeadline: Aug 24Beaumont Hospital intends to appoint a suitably-qualified and experienced works contractor to undertake modular expansion work and internal refurbishment works to the Emergency Department at Beaumont Hospital. Full further information regarding the project is contained in the Invitation to Tender documentation, available to download from www.etenders.gov.ie. As described by Volume C of the Invitation to Tender document, tenderers are required to provide costs for all phases of the envisaged works; for the avoidance of doubt, however, the Hospital reserves the right to award a contract for any combination of phases, depending upon final funding availability.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 27. Juli 2026.
- Who is the contracting authority?
- The contracting authority is The Rotunda Hospital.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.