illwerke vkw AGBregenzTED
Power-to-Gas-Anlage, Errichtung und Service
Rahmenvereinbarung betreffend die Erbringung von Generalunternehmerleistungen für die Errichtung einer Power-to-Gas-Anlage samt Serviceleistungen.
Heating & Air Conditioning, Pipeline Construction, Industrial Construction, Process Piping
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- illwerke vkw AG
- Published:
- June 09, 2026
- Deadline:
- Not specified
- Topic:
- Heating & Air Conditioning
Tender description
Rahmenvereinbarung betreffend die Erbringung von Generalunternehmerleistungen für die Errichtung einer Power-to-Gas-Anlage samt Serviceleistungen.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock6 details capturedPublication number · Procedure reference · Buyer reference · Procedure type · +2 more
Performance locations
Unlock2 details capturedPerformance locations
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
6Anlagenbau - Power to Heat
LINZ STROM GAS WÄRME GmbHLinzDeadline: Jul 16Errichtung einer Power to Heat Anlage mit einer elektrischen Leistung von 2 x 30MWPlanung und Errichtung einer Power-to-Heat Anlage - Los 5 Elektro-, Leit- und Messtechnik
Stadtwerke Leipzig GmbHLeipzigDeadline: Jul 10Im Los 5 werden Planung und Errichtung der Elektro‑, Leit‑ und Messtechnik für eine Power‑to‑Heat‑Anlage ausgeschrieben. Dazu gehört die Energieversorgung des Elektrodenkessels inklusive Eigenbedarf, die Stromversorgung aller elektrotechnischen Anlagen sowie weiterer verfahrenstechnischer Einheiten. Außerdem sind sämtliche Anpassungen im Bestand zu berücksichtigen, da der Auftraggeber kritische Infrastruktur betreibt.Planung und Errichtung einer Power-to-Heat Anlage - Los 8 - Generatorausleitung
Stadtwerke Leipzig GmbHLeipzigDeadline: Jul 10Schaffung eines neuen Verbraucherabganges in der bestehenden 10,5 kV Generatorausleitung unweit des Maschinentransformators, mit Errichtung eines neuen Synchronisierschalters, eines Abgangsleistungsschalters als Schutzschalter für einen neuen Elektrodenkessel sowie einer Kurzschlussbegrenzungseinheit. Anpassung der bestehenden Synchronisierfunktionen und gesamten Schutztechnik. Inklusive aller Anpassungen im Bestand.THE PROVISION OF SERVICES BY ACCREDITED ENTITIES, IN ORDER TO PERFORM ENGINE POWER VERIFICATIONS, ON FORTY FIVE (45) FISHING VESSELS (CYPRUS) (TENDER NO.: 44/2025).
Department of Fisheries and Marine ResearchΛευκωσίαProvision of services by accredited entities to perform engine power verifications on 45 fishing vessels in Cyprus.Gas Storage Denmark: Onshore Intervention Services related to wells on natural gas storage LOT 1-3: 2027-2034
Gas Storage Denmark A/SFredericiaDeadline: Jun 15Expected consumption: 4.360.000 EUR. Maximum value: 6.530.000 EUR if the contractual expansions of 2 x 25 % of the value are both activated. The overall purpose of the Framework Agreement is for Supplier to support Gas Storage Denmark (GSD) in the planning and execution of GSD's Reservoir logging and well diagnostics covering Pulsed neutron, Production Logging operations and data interpretation. Other E-line work such as Re-Perforating, Calliper of Tubing, Ultrasonic measurement, running Camera and leak detection can be expected in connection with yearly requirements for Pulsed neutron logging. GSD requires the Supplier to provide Integrated Wireline Trucks - accompanied, if possible - by a trailer fitted with all additional required equipment for the Works. This is to minimize additional trucks and personnel on the well site and to assure that transfer of equipment between wells can be conducted with minimum use of additional trucks and crane assistance. For more information see Appendix 2: Scope of Works LOT 1 (doc. no. 25/18898-1) and 2A: Technical and Functional Requirements LOT 1 (doc. no. 25/18898-2). The Contracting Authority wants to ensure robustness for Gas Storage Denmark regarding services of importance. For that reason, the Scope of Works for LOT 1 and LOT 2 are overlapping with specific tools that are required for investigation of the condition of the wells. The reasoning is that it should be possible for GSD to conduct additional investigations – and therefore minimize mobilizations – when already conducting services under the respective lot. Consequently, the Contracting Authority will not award LOT 1 and LOT 2 to the same Supplier. Tenders can be submitted for all lots, but the tenderers who have applied and been prequalified to both LOT 1 and LOT 2 are required to indicate an order of priority in the case they will have the most economically advantageous tender based on the best price-quality ratio for both LOT 1 and for LOT 2. In this case the applicant will be awarded the 1st priority lot but will be excluded from the evaluation of the 2nd priority lot. The priority is to be submitted by filling out the attached template: Template 4: Priority between LOT 1 and LOT 2 (doc. no. 25/12155-45) in connection with the submission of the initial tender – and only by tenderers who have applied and been prequalified to both LOT 1 and LOT 2. Considering the above-described limitations - subsequent contracts under the framework agreement will be awarded directly to the supplier who submitted the most economically advantageous tender, see section 4.1. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.Provision of services to support economic modelling of climate change and energy policies: Modelling of non-CO2 greenhouse gases, air pollutants, and LULUCF offsets
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsDeadline: Jul 01The European Green Deal is the roadmap for making the EU’s economy sustainable. It is a set of policy initiatives with the overarching aim of making Europe climate neutral by 2050. The "Economics of Climate Change, Energy and Transport" Unit (JRC.C.6) of the Joint Research Centre supports the European Commission’s European Green Deal by performing economics-based research in several areas related to energy and climate change. This work includes the development of a reference toolset of economic models and the completion of associated research activities to improve the models' reliability and robustness. The JRC.C.6 Unit is based in Seville, Spain. JRC.C.6 is seeking to strengthen its socio-economic research and modelling capabilities by expanding its coverage of modelling areas and by updating and improving its existing models and toolsets. The unit JRC.C.6 maintains, develops and applies a number of quantitative tools to analyse the impact of different policies on the energy demand and supply sectors, as well as tools for macro-economic modelling. This toolset comprises the EU and global partial equilibrium models POTEnCIA and POLES including their corresponding databases (notably JRC-IDEES), and the global general equilibrium model JRC-GEM-E3. All these tools are able to provide model output in terms of CO2 emissions. The comprehensive modelling of climate change mitigation scenarios requires additional information as regards non-CO2 greenhouse gas emissions as well as on emissions and sinks related to land use, land use change and forestry offsets (LULUCF). Besides, climate action can have important co[1]benefits in terms of reduced emissions of air pollutants and of improved air quality. This Framework Contract aims at supporting the operation of the abovementioned set of models by providing the JRC with data, methods and results relevant for the analysis of non-CO2 greenhouse gas emissions, emissions of air pollutants (including air quality impacts), and LULUCF
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- No specific submission deadline is currently stated for this notice.
- Who is the contracting authority?
- The contracting authority is illwerke vkw AG.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.