Gas Storage Denmark A/SFredericiaTED
Gas Storage Denmark: Onshore Intervention Services related to wells on natural gas storage LOT 1-3: 2027-2034
Expected consumption: 4.360.000 EUR. Maximum value: 6.530.000 EUR if the contractual expansions of 2 x 25 % of the value are both activated. The overall purpose of the Framework Agreement is for Supplier to support Gas Storage Denmark (GSD) in the planning and execution of GSD's Reservoir logging and well diagnostics covering Pulsed neutr...
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Gas Storage Denmark A/S
- Published:
- May 20, 2026
- Deadline:
- June 15, 2026
Tender description
Show full descriptionCollapse description
Expected consumption: 4.360.000 EUR. Maximum value: 6.530.000 EUR if the contractual expansions of 2 x 25 % of the value are both activated. The overall purpose of the Framework Agreement is for Supplier to support Gas Storage Denmark (GSD) in the planning and execution of GSD's Reservoir logging and well diagnostics covering Pulsed neutron, Production Logging operations and data interpretation. Other E-line work such as Re-Perforating, Calliper of Tubing, Ultrasonic measurement, running Camera and leak detection can be expected in connection with yearly requirements for Pulsed neutron logging. GSD requires the Supplier to provide Integrated Wireline Trucks - accompanied, if possible - by a trailer fitted with all additional required equipment for the Works. This is to minimize additional trucks and personnel on the well site and to assure that transfer of equipment between wells can be conducted with minimum use of additional trucks and crane assistance. For more information see Appendix 2: Scope of Works LOT 1 (doc. no. 25/18898-1) and 2A: Technical and Functional Requirements LOT 1 (doc. no. 25/18898-2). The Contracting Authority wants to ensure robustness for Gas Storage Denmark regarding services of importance. For that reason, the Scope of Works for LOT 1 and LOT 2 are overlapping with specific tools that are required for investigation of the condition of the wells. The reasoning is that it should be possible for GSD to conduct additional investigations – and therefore minimize mobilizations – when already conducting services under the respective lot. Consequently, the Contracting Authority will not award LOT 1 and LOT 2 to the same Supplier. Tenders can be submitted for all lots, but the tenderers who have applied and been prequalified to both LOT 1 and LOT 2 are required to indicate an order of priority in the case they will have the most economically advantageous tender based on the best price-quality ratio for both LOT 1 and for LOT 2. In this case the applicant will be awarded the 1st priority lot but will be excluded from the evaluation of the 2nd priority lot. The priority is to be submitted by filling out the attached template: Template 4: Priority between LOT 1 and LOT 2 (doc. no. 25/12155-45) in connection with the submission of the initial tender – and only by tenderers who have applied and been prequalified to both LOT 1 and LOT 2. Considering the above-described limitations - subsequent contracts under the framework agreement will be awarded directly to the supplier who submitted the most economically advantageous tender, see section 4.1. For further details regarding the purchase, reference is made to the tender documents. Orientation Teams Meeting: A Microsoft Teams Orientation meeting regarding the application – including elaborations on chosen highlighted topics in the Tender Conditions will be conducted accordingly to the time schedule in section 1.2. Invitations to the meeting will be forwarded upon request via Comdia. Be aware that no technical questions will be answered at the meeting as this is purely an information meeting regarding the tender process. Site visit: As part of the preparation of applications for prequalification, it will be possible for applicants to visit Gas Storage Denmark’s two Sites in the time span indicated in the time schedule in section 1.2. Request to be forwarded via Comdia as soon as possible.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock3 details capturedLots LOT-0001 · Lots LOT-0002 · Lots LOT-0003
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock3 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
9Framework agreement trade services - Plumbing (New notice)
OFA IKSVegårsheiDeadline: Jul 10The objective of the framework agreement is to cover Vegårshei municipality ́s need for ongoing maintenance and operation of the municipality ́s properties within plumbing work. The works will include a number of assignments of varying sizes and scope, including major renovations, replacement of old equipment and installations, repairs and maintenance assignments on existing equipment and installations, as well as work on new buildings. Other services that naturally come under the discipline of HVAC can be provided if there is a need in the contract period. Materials needed for the different operations will be included in the work. Although the procurement comprises some material, it is emphasised that this contract does not provide any exclusiveity for the delivery of such material, and that the Contracting Authority is not otherwise obliged to procure materials from the service provider.EPC instalación de un flujo reverso e inyección de biometano en el gasoducto La Robla-Guardo
ENAGAS TRANSPORTE S.A.U.MadridDeadline: May 06EPC-Projekt für zwei Anlagen: 1. Engineering, Beschaffung von Kompressoren/Rohrleitungen sowie Bau und Inbetriebnahme einer Anlage zur Verdichtung von Erdgas von 45-59 bar auf 72 bar (Transportnetz). 2. Lieferung und Installation einer kompakten Messstation zur Einspeisung von Biomethan in ein 45-bar-Netz. Standort: Gasleitung La Robla-Guardo.Retrofit des Brandmeldesystems auf der Offshore-Konverterplattform HelWin beta
TenneT Offshore 9. Beteiligungsgesellschaft mbHBayreuthAustausch des bestehenden Brandmeldesystems auf der Offshore-Konverterplattform HelWin beta. Lieferumfang: Umbau, Austausch der Brandmeldezentrale inkl. Neukonfiguration der Schnittstellen, Neuplanung und Installation der Melder und Loops inkl. Rauchansaugsystem. Design und Umsetzung nach Stand der Technik gemäß DNV-ST-0145, EN 54, DIN VDE 0833-1/-2, DIN14675, VDI 6010-2 und VdS 3435. AN stellt Personal, Ausrüstung, Material sowie On-/Offshore-Unterstützung, Koordination und Ingenieurleistungen. Zuschlagskriterien: Technisches Konzept und Verfügbarkeit (35%), Vertragsbedingungen (25%), Preis (35%), HSE (5%). Vertrag vom Zuschlag (voraussichtlich Ende Q1/2026) bis zur Abnahme des letzten mangelfreien Leistungspaketes.Dogger Bank South (East) Limited
The Crown EstateLondonConcession contract for award of seabed rights to develop, construct, and operate an offshore wind farm. After modification, the contract remains of the same nature.Vergabe von Meeresgrundrechten für die Entwicklung, den Bau und den Betrieb eines Offshore-Windparks
The Crown EstateLondonKonzessionsvertrag zur Vergabe von Meeresbodenrechten für die Entwicklung, den Bau und den Betrieb eines Offshore-Windparks (Outer Dowsing). Der Vertrag behält nach der Modifikation seinen ursprünglichen Charakter.User surveys for Havtil Norwegian Ocean Industry Authority
HavindustritilsynetSTAVANGERDeadline: Aug 10The aim of the project is to carry out regular user surveys for Havtil Norwegian Ocean Industry Authority, using QuestBack or similar tools. Contract period: 01.04.2026 - 31.03.2028 with an option for an extension for 1 year + 1 year.Request for Tender for Metocean Surveys for Lí Ban within the South Coast DMAP
Department of the Environment Climate and CommunicationsDublinThe Minister for the Climate, Energy and the Environment (DCEE) invites interested parties to submit responses to this request for tender for a metocean survey campaign to support DCEE in acquiring high quality metocean data to support ORESS auctions. For the avoidance of doubt, this would include surveys in the for Lí Ban area within South Coast Designated Maritime Area Plan (SC-DMAP).AP04_0022_Directional_Drilling_DrillBits_Sidetracks
WärmeWerk Wörth GmbHDeadline: Jun 15Der Auftraggeber plant das Abteufen einer Dublette für Tiefe Geothermie mit Tiefen von ca. 5000 m MD. Die angeboten Leistungen umfassen Richtbohrservices, Lieferung von Bohrmeiseln und Material für eventuelle Sidetracks.Kernbohrung Oligozän - Landkreis Helmstedt
Landesamt für Bergbau, Energie und GeologieHannoverDeadline: Jul 10Kernbohrung Oligozän - Landkreis Helmstedt
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 15. Juni 2026.
- Who is the contracting authority?
- The contracting authority is Gas Storage Denmark A/S.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.