Westinghouse Electric Poland Sp.z.o.oKrakówTED
Non-Safety Related Plant Security Computer Equipment (Commodity Code JS03) for Poland AP1000® Project
Description: The JS03 system consists of Plant Security Computer Equipment that supports the integrated Plant Security System. JS03 is classified as Non-Safety Related, Non-Seismic, and AP1000 Safety Class E. The system provides a centralized platform to support plant physical protection functions, including monitoring intrusion detection...
Access Control, Video Surveillance, Hazard Detection Systems
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Westinghouse Electric Poland Sp.z.o.o
- Published:
- July 21, 2026
- Deadline:
- August 13, 2026
- Topic:
- Access Control
Tender description
Show full descriptionCollapse description
Description: The JS03 system consists of Plant Security Computer Equipment that supports the integrated Plant Security System. JS03 is classified as Non-Safety Related, Non-Seismic, and AP1000 Safety Class E. The system provides a centralized platform to support plant physical protection functions, including monitoring intrusion detection, access control, video surveillance, alarm processing, and security data management. The system is designed to support security personnel in detecting, assessing, and responding to potential security events and in controlling access to protected areas. The system consists of interconnected computer hardware and associated equipment configured to provide reliable and continuous operation, including servers, operator workstations, monitors, printers, and network equipment located in security-related areas such as alarm stations and security computer rooms. JS03 has associated miscellaneous equipment such as system servers and host computers; operator and administrative workstations with monitors; alarm station consoles and video display systems; printers for reporting and logging; network switches and communication equipment; as well as interface devices supporting access control systems, video surveillance systems, and other plant security subsystems. 1. Experienced manufacturers / Fabricators capable of fabricating and furnishing safety related, ASME code material, experience with pressure boundary type equipment and requirements, and experience with electronic wiring and structural type fabrications (described below), must (i) contact (email and/or phone call) the Westinghouse Contact Person identified in section 1 to express interest and request an AP1000 supplier qualification questionnaire, and (ii) upon receipt, complete the AP1000 supplier qualification questionnaire with sufficient detail for Westinghouse evaluation and return it via email to the Westinghouse contact person. If there are any questions or clarifications needed, please reach out to the contact person listed above. 2. The qualification criteria shall be included in the AP1000 supplier qualification questionnaire, examples thereof include demonstration of: (i) demonstrated experience in furnishing similar scope integrated security computer systems for power generation or high-security industrial facilities, including computer-based platforms supporting intrusion detection, access control, video monitoring, alarm processing, and data management functions; experience in the design, integration, configuration, and testing of systems consisting of servers, workstations, network infrastructure, and operator interfaces; and capability to supply reliable, redundant, and continuously available systems supporting security monitoring and control functions; (ii) meeting the quality requirements for such equipment in a nuclear power plant, including having a quality program complying with NQA-1 and 10 CFR 50 Appendix B; (iii) certification of compliance with all applicable governmental policies, requirements, laws and regulations, applicable international treaties or agreements, and other regulatory requirements; (iv) financial standing (solvency) and (v) verification of capabilities. 3. Upon evaluation of your response to the AP1000 supplier qualification questionnaire, Westinghouse will determine if your company meets, or does not meet the qualification requirements and we will provide feedback. Submission of the AP1000 supplier qualification questionnaire does not automatically qualify your company to be supplier for the project. 4. Each qualified Supplier will be required to execute a Proprietary Information Agreement (PIA) / (Non-Disclosure Agreement (NDA)). 5. Companies meeting the qualification criteria and who have executed the PIA will be invited to submit a proposal. 6. The Request for Proposal (RFP) shall include the information about award criteria, scope of work, specifications, drawings, datasheets, terms and condition, and schedule data. 7. The Request for Proposal (RFP) document will be for unit one (1) of the three (3) unit project. 8. The scope of work for the subject RFP will include: • Overall project management, planning, scheduling, and reporting. • Procurement of material. • Material receipt • Preparation of necessary fabrication drawings and procedures (welding, coating, wiring diagrams etc.), work packages (travelers), manufacturing and assembly plans, quality and inspection plan(s), transportation plan, testing plan, weld documentation, personnel and process qualifications, and schedule. • Preparation of the necessary documentation to support site installation, including any special instructions or requirements for unloading, hauling, and storage. • Fabrication based on the existing Westinghouse fleet design (not based on specific fabricator preferences). • CE Marking of equipment • Cleaning, marking, painting, packaging. • Non-Destructive Examination (NDE) and other Testing requirements as required by Fabrication Specification. 9. The RFP document will require furnishing of a Parent Company Guarantee if the prequalified Supplier is an affiliate of Parent Company. 10. Proposal may be requested in EURO, PLN (Polish Zloty), and/or USD . Furthermore, the proposals may be requested in a combination of Fixed Price (not subject to any price adjustment) and Firm Price (subject to adjustment per mutually agreed upon indices). 11. The final supplier evaluation and selection criteria will include price, compliance with technical, quality, and commercial requirements, experience in furnishing similar equipment, past performance, and compliance with the terms and conditions of purchase. 12. Any companies that do not meet mandatory compliance requirements in section 3 will be excluded.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Publisher
Unlock6 details capturedPublisher · Address · Contact
Related tenders
9Open procedure for the conclusion of a single framework contract on the supply of security equipment to the benefit of CFSP Entities
European Commission, DG GROW - Internal Market, Industry, Entrepreneurship and SMEsBrusselsDeadline: Sep 11FPI.6 is responsible for concluding centralized framework contracts (FWCs), for the coverage of CFSP Entities' (CSDP Operations, EU Special Representatives, KSC) needs in a variety of supplies and services. In light of this, FPI.6 intends to launch an open procedure, with the aim of concluding a 4-year single framework contract, for the supply of security equipment to CFSP Entities through specific contracts/orders that they will be able to place under the FWC.Procurement of signal-blocking equipment
Norwegian Ministry of Foreign AffairsOsloDeadline: Aug 28Procurement of equipment that prevents unauthorised audio recordings from mobile telephones, laptops or other recording equipment during meetings and calls by using active noise reduction. We would like a type of box that shall be in the meeting rooms and that mobile telephones, laptops or other recording equipment can be folded in. The box should prevent embedded Microphones can make meaningful sound recordings, for example, by generating disturbing sound or noise that makes recording even if the device is compromised. The equipment shall be robust, user friendly and suitable for repeated use in the Contracting Authority ́s ordinary working day. The contract shall also include the accompanying services for sub-contract 1 that are necessary for safe and stable use of the equipment throughout the entire contract period. This includes service, maintenance, repairs and any replacement of equipment, so that the functionality and security level are maintained over time. The maximum roof is set at NOK 5 million. See annex 1 in document 2.2 Sub-Contract 1 - Annex for further details.Framework agreement for the procurement and installation of equipment connected to the existing Lenel OnGuardS2 access control system.
Bodø KommuneBODØDeadline: Aug 17The aim of this procurement is to enter into parallel framework agreements for the delivery of software, equipment, as well as maintenance and assistance services for the municipality ́s access control system (in this document referred to as AAK). The contracts are for expansions and changes to the existing Lenel OnGuradS2 system and tenderers must therefore have access to equipment, have Lenel OnGuradS2 certified technicians as well as be certified VAR (Value Added Reseller). Bodø municipality shall always have a robust, flexible, well-functioning and future oriented access control system.Market survey on alarm services for city officers
Oslo kommune v/ BymiljøetatenOsloDeadline: Aug 23Introduction The Agency for Urban Environment invites the supplier market to a market dialogue regarding the provision of alarm services and the accompanying to uncover 1) the supplier market and potential tenderers, and 2) systems offered to cover the need for alarm functions for the company's urban city service officers. The objective of the market dialogue is to obtain information on the market's systems, technological possibilities, service models and best practice before any competition notice. The dialogue shall contribute to ensuring that a future procurement is designed in a way that safeguards the company's needs, at the same time as facilitating competition and innovation. This market dialogue is not a competition and a contract will not be signed as a result of this enquiry alone. About the Entity The Agency for Urban Environment needs alarm services that support city officers on foot, on bicycles and in vehicles. The service shall contribute to: * Effective handling of alarms and events * Quick notification and coordination of city officers * Documentation and traceability * Increased security for employees, visitors and values · Efficient interaction either between the alarm centre and operative resources or internally between operative resources. The organisation would like to gain better insight into available systems and future development trends within alarm management. Background The entity is considering to procure alarm services that can include: * Reception and management of technical alarms * Assault alarms/safety alarms * Notification to city officers and other stand-by resources * Logging and reporting * Notification to security guards and other stand-by resources * Integrations with existing security and access systems The company would like information on how such services are currently provided in the market. Contract models * Which pricing models are used? * How are alarm reception, call-outs and additional services priced? * Which contract forms are recommended? Provisional needs description The organisation would like a description of which systems can be offered in general, but will present a provisional description of requirements where the points below will be focused. Descriptions of other offered systems are also encouraged to include. · Mobility in alarm units/systems that can be offered. This includes a description of the weight, design and fasteners. · Robustness and weather resistance. Describe how the proposed systems will tolerate Nordic conditions with a focus on humidity/rain/water and cold conditions. The company also requests certifications, industry standards that can be requested for proposed systems. · Operational duration for the battery for proposed systems as well as time spent on charging. · Coverage area. Describe what degree of coverage can be expected from proposed systems. For this point, the company emphasises that the need is full coverage throughout Oslo - also in outer parts of Oslo and between high-level buildings in the centre of Oslo. · User friendliness and simplicity in use. The organisation will focus on simplicity when needed to trigger alarms and simplicity when receiving the alarm. Describe what happens when there is a need to trigger the alarm and what is being communicated to the person who receives the alarm for proposed systems. · Report functionality. Describe the possibility for reporting alarms with the accompanying information and how this is presented and can be analysed. · Privacy and information security. o How are privacy and information security safeguarded? o What certifications and standards are complied with? o How are data storage and access control handled? Emphasis is put on the fact that the needs description is provisional and can be changed after the completed market dialogue. Implementation of market dialogue The market dialogue is planned to be carried out in the following stages: Step 1 - Written input Tenderers will submit written responses to the questions in this document. Step 2 Summary The organisation will use the input for further needs clarification and any competition design. Practical information Deadline for input 19.08.2026 - 12:00 Submission: Answers shall be sent electronically through Artifik. All questions shall be sent electronically through Artifik. Confidentiality and the public. Received answers will be processed in accordance with the current regulations. Tenderers are requested to clearly mark any information that is seen as business secrets or other confidential information. The company reserves the right to publish general and anonymised summaries of the market dialogue. Reservations Participation in the market dialogue does not give any rights in connection with any later competition. The company will not be bound to hold a procurement as a result of this market dialogue. All costs connected to participation are to be borne by each tenderer. We look forward to receiving input and thank you for your interest.Direct Award- Contract for Upgrade Security Access System Civic Offices and City Hall
Dublin City CouncilDublinDublin City Council has directly awarded a contract to Chubb Ireland for the upgrade of the security access system for Civic Offices and City Hall at a value of €197,978.13 for a period of 12 months. This contract was awarded via the negotiated procedure without prior publication which is permitted by Directive 2014/24/EU Article 32.2 (c) which states that the negotiated procedure without prior publication may be used for public works contracts, public supply contracts and public service contracts in so far as is strictly necessary where, for reasons of extreme urgency brought about by events unforeseeable by the contracting authority, the time limits for the open or restricted procedures or competitive procedures with negotiation cannot be complied with. The circumstances invoked to justify extreme urgency shall not in any event be attributable to the contracting authority.Procurement - Locks, fittings and access control with the accompanying goods and services, 2026
Ålesund kommuneÅlesundDeadline: Aug 27The aim of the contracts is to cover the customer ́s need for locks, fittings and access control with the accompanying goods and services in accordance with the requirement specifications. Tenderers must be able to deliver, assemble and maintain most types of locks and fittings, as well as produce and deliver keys etc. Tenderers must also be able to deliver, assemble and maintain goods and services connected to the lock and access control system (e.g. iLOQ and ARX including licences), as well as door automation, door closers and door pumps. The customer has a large and varied building stock and therefore needs a wide range of such goods and services. Assignments in this agreement will mainly consist of the delivery and installation of locks and fittings for doors, establishment and installation of a lock system and access control, service assignments and consultancy services. Tenderers must be able to handle both planned/ordinary assignments and urgent assignments (critical or non-critical) that require a short response time. This procurement is divided into two (geographical) sub-contracts (1. Northern and second. Søre). For each of the sub-contracts, the customer would like to enter into framework agreements with several tenderers (parallel framework agreements), provided that there are a sufficient number of qualified tenderers.RFQ for purchase of equipment for law enforcement
UNDPJordanDeadline: Aug 31Interested suppliers must submit their offer directly in the system as instructed in the solicitation document, following the instructions in the available user guide. In case you have never registered before, you can register a profile using the registration link shared via the procurement notice and following the instructions in guides available in the UNDP website: https://www.undp.org/procurement/business/resources-for-bidders. Do not create a new profile if you already have one. Use the forgotten password feature in case you do not remember the password or the username from previous registration. Search for the specific tender using search filters and subscribe to the tender in order to get notifications in case of amendments of the tender document. If you need support with the online system, you can contact the contact details of this tender as indicated in the solicitation document. UNDP OFFICE KOSOVO PROCUREMENT UNITAnmietung Videotürme inkl. Betrieb Leitstelle
Oldenburgisch-Ostfriesischer WasserverbandBrakeAnmietung von Videotürmen zur Überwachung von Liegenschaften des OOWV inkl. des Betriebs einer LeitstelleBB 2015-09 ZsG-BB/D.03.05 B WinGuard
ZfP Calw - Klinikum Nordschwarzwald, Abt. Bau & TechnikCalw-HirsauDeadline: Sep 17Das WinGuard-System ist eine herstellerunabhängige Gefahrenmanagementplattform zur zentralen Überwachung und Steuerung sicherheitsrelevanter und gebäudetechnischer Anlagen. Es ermöglicht die Integration unterschiedlicher Systeme wie Brandmelde-, Einbruchmelde-, Videoüberwachungs- und Zutrittskontrollanlagen in einer einheitlichen Bedienoberfläche.Durch die Bündelung aller Meldungen und Zustände unterstützt WinGuard das Bedienpersonal bei der schnellen Bewertung von Ereignissen sowie bei der Einleitung geeigneter Maßnahmen. Zudem gewährleistet das System eine lückenlose Dokumentation aller Vorgänge und trägt so zu einem effizienten und sicheren Gebäudebetrieb bei. In das GMS sind über Schnittstellenkopplung ca. 6000 Datenpunkte zu integrieren. Mitunter sind folgende Gewerke aufzuschalten: - BMA - Lichtruf - Personennotruf - Fluchttürsteuerung - Gebäudeautomation
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 13. August 2026.
- Who is the contracting authority?
- The contracting authority is Westinghouse Electric Poland Sp.z.o.o.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.