New: market reports on German public procurement Read the report

Norconsult Norge ASSANDVIKATED

New hospital Bråvolltunet

The contracting authority, Ullensvang municipality, invites tenderers to a competition for a contract in the project new Hospital Bråvolltunet. Bråvolltunet sjukeheim lies in Kinsarvik in Ullensvang municipality and was built in 1987. In this project there will be an extension over three floors that shall house 18 new hospital sites, a ga...

Submission deadline: October 28, 2026Type: Tender

Heating & Air Conditioning, Electrical Installation, Pipeline Construction, Sewer Construction, Non-Residential Building

Unlock documents for free

No credit card · Instant access

Content at a glance

Tender type:
Tender
Contracting authority:
Norconsult Norge AS
Published:
August 31, 2026
Deadline:
October 28, 2026
Topic:
Heating & Air Conditioning
Object:
Pflegeheim / Seniorenheim

Object classification

  • Pflegeheim / SeniorenheimPrimary

Tender description

Show full description

The contracting authority, Ullensvang municipality, invites tenderers to a competition for a contract in the project new Hospital Bråvolltunet. Bråvolltunet sjukeheim lies in Kinsarvik in Ullensvang municipality and was built in 1987. In this project there will be an extension over three floors that shall house 18 new hospital sites, a gardero bar, a memorial room and storage. Parts of the existing Sjukeheim hospital shall be altered with a new monitor department with 6 places. In addition, new facilities will be established in the basement between anna heimeteneste and physiotherapy. See part II - the contract documentation for further information on the project, contract division and the contract work. The contract ́s start date is 30.11.2026, with the expected completion dated 30.11.2029. (engineering design phase 4 months, start-up addition April -27, estimated construction time extension 18 months + renovation 12 months + 2 months slack = 36 months). Flaum protection measures and water and sewage works are also included as a part of the project. It is important to note that this part of the project has been detailed engineered and shall be dealt with as an execution contract. For this part of the contract, works at the construction site can start as soon as nautical permits are in place, and the host need for the season added it, tentatively January 2027. NS 8407 applies as contractual provisions with the corrections that are in part II of the contract documentation, point B.2 Special contract provisions and B.3 Seriousness requirements.

Further details

With free access, documents, deadlines and submission notes are available in a structured format.

  • Core requirements of the tender prioritized and prepared
  • Deadlines, eligibility criteria and documents in one workflow
  • Guidance for structured bid preparation
  • Automatically discover matching follow-up tenders
Unlock 30 days free

30 days free · no credit card · cancel anytime

All procurement details

Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.

7 data areas available

Unlock 30 days free

30 days free · no credit card · cancel anytime

Related tenders

7

Frequently asked questions about this tender

How can I apply for this tender?
Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
What is the submission deadline?
The submission deadline is 28. Oktober 2026.
Who is the contracting authority?
The contracting authority is Norconsult Norge AS.
Which documents are needed to get started?
Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.
1,200+ companies10,000+ active tendersGDPR-compliant platform

Next step

Get full access to this tender

Access all documents for "New hospital Bråvolltunet" from Norconsult Norge AS and keep track of deadlines and submission guidelines.

Deadline tracked until October 28, 2026No credit card required