Laois County CouncilPortlaoiseTED
Mountmellick Flood Relief Scheme - Site Investigation
The proposed Flood Relief Scheme (FRS) works include the construction of 1191m of flood defence walls and 5366m of embankments. The proposed Mountmellick FRS works are in County Laois in Mountmellick town. The works are proposed along watercourses including the River Owenass, Rover Pound, Clontygar Stream and Carroon Stream, which can be ...
Geotechnical Surveys
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Laois County Council
- Published:
- August 05, 2026
- Deadline:
- September 09, 2026
- Topic:
- Geotechnical Surveys
Tender description
Show full descriptionCollapse description
The proposed Flood Relief Scheme (FRS) works include the construction of 1191m of flood defence walls and 5366m of embankments. The proposed Mountmellick FRS works are in County Laois in Mountmellick town. The works are proposed along watercourses including the River Owenass, Rover Pound, Clontygar Stream and Carroon Stream, which can be accessed from the national road N80 and regional road R422, and in the surrounding areas. The NIAH dataset revealed three Sites and Monuments (SMR) features located at 75m (graveyard), 95m (Church) and 170m (Historic town) from the proposed FRS structures. Works will occur on a mix of public and private land with landowners’ permission. Access to this land is predominantly available from landowners. The Mountmellick FRS is a proposed Flood Relief scheme covering Mountmellick town to address and mitigate flood risk from the nearby rivers and streams. The purpose of the site investigation work outlined in this Contract is to establish the following; • To reduce the risk of unforeseen ground conditions that could negatively impact the design of the scheme. This will be achieved by undertaking a sequence of exploratory holes using a variety of SI techniques (including boreholes, trial pits, slit trenches, dynamic probing, window sampling, peat probing and soil infiltration testing). • To acquire ground and groundwater information in areas not covered by historical ground investigations and other published sources. •To provide an initial assessment of the hydrogeological and geo-environmental characteristics along the proposed route. •To install instrumentation necessary to capture the long-term behaviour and seasonal variations experienced at key areas across the site. •To ascertain locations of underground workings (if any).
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
8Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
Tipperary County CouncilClonmel, NenaghDeadline: Aug 19The OPW, working with Tipperary County Council, identified Nenagh as an Area for Further Assessment in the Shannon CFRAM Study. A flood relief scheme is to be developed. Tipperary County Council intends to commission a Consultant to progress Engineering and Environmental elements of the Tender Specification. The objective is the identification, design and submission for planning consent of a Flood Relief Scheme to alleviate flood risk in Nenagh, complete detailed design, and procure, manage and oversee construction.Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
Tipperary County CouncilClonmel, NenaghDeadline: Sep 02Background - The OPW, working in partnership with Tipperary County Council and other Local Authorities, commissioned and have completed the Shannon Upper and Lower River Basin Catchment Flood Risk Assessment and Management (CFRAM) Study. The Shannon Upper and Lower River Basin (‘Shannon’) CFRAM Study Area included Nenagh as an Area for Further Assessment (AFA) and identified that a flood relief scheme for the community would be appropriate to be further developed for implementation. To advance and implement a flood relief scheme for Nenagh, Tipperary County Council, supported by a Steering Group, intends to commission a Contract to develop and assist with the implementation of the Scheme. This Contract will be procured using one Consulting firm (hereafter referred to as “the Consultant”) to progress both the Engineering and Environmental elements of the Tender Specification. Project Objectives - The objective of this project is the identification, design and submission for planning consent of a Flood Relief Scheme, that is technically, socially, environmentally and economically acceptable, to alleviate the risk of flooding in the community of Nenagh to a determined Standard of Protection, to complete the detailed design, and to procure, manage and oversee the construction of that Scheme. The tasks that are to be carried out by the Consultant to fulfil this objective are described in detail within the Tender Specification.Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
Tipperary County CouncilClonmel, NenaghDeadline: Sep 02Background - The OPW, working in partnership with Tipperary County Council and other Local Authorities, commissioned and have completed the Shannon Upper and Lower River Basin Catchment Flood Risk Assessment and Management (CFRAM) Study. The Shannon Upper and Lower River Basin (‘Shannon’) CFRAM Study Area included Nenagh as an Area for Further Assessment (AFA) and identified that a flood relief scheme for the community would be appropriate to be further developed for implementation. To advance and implement a flood relief scheme for Nenagh, Tipperary County Council, supported by a Steering Group, intends to commission a Contract to develop and assist with the implementation of the Scheme. This Contract will be procured using one Consulting firm (hereafter referred to as “the Consultant”) to progress both the Engineering and Environmental elements of the Tender Specification. Project Objectives - The objective of this project is the identification, design and submission for planning consent of a Flood Relief Scheme, that is technically, socially, environmentally and economically acceptable, to alleviate the risk of flooding in the community of Nenagh to a determined Standard of Protection, to complete the detailed design, and to procure, manage and oversee the construction of that Scheme. The tasks that are to be carried out by the Consultant to fulfil this objective are described in detail within the Tender Specification.Rahan Flood Relief Scheme — Engineering and Environmental Consultancy Services
Offaly County Council_448TullamoreDeadline: Sep 18Offaly County Council invites tenders for engineering and environmental consultancy services for the Rahan Flood Relief Scheme at Tullybeg, Rahan, County Offaly, on the River Clodiagh. The Scheme comprises approximately 430 metres of reinforced concrete flood defence wall along the right bank of the River Clodiagh, with embankment at the tie-in points, protecting residential properties and the wastewater treatment plant to the 1 percent AEP fluvial standard. The commission covers Stage (ii) statutory consent and detailed design, Stage (iv) construction-stage services and Stage (v) handover and defects period, under the Capital Works Management Framework. The construction works will be delivered by Office of Public Works direct labour; procurement of a works contractor is not included in this commission. The services include detailed design, hydrological and hydraulic modelling, ground investigation specification and interpretation, review and validation of the completed EIA and Appropriate Assessment screening, statutory consent documentation for approval under Part 8, works package preparation for direct labour delivery, Project Supervisor Design Process duties, construction-stage technical support and design authority, and handover documentation. The Scheme is funded by the Office of Public Works.Connection of Three Group Water Schemes in Donegal to the Public Water Supply - Site Investigations
Donegal County Council_1193LiffordGround investigation and services identification for proposed 15km of watermain to be laid along public roads and private laneways across three group water schemes in Doengal: 1) Maghera GWS - 7.6km 2) Meenatole GWS - 4.4km 3) Lurganboyce GWS - 3.0km Scope of works includes seismic refraction, slit trenches, rotary core boreholes, sampling, in-situ testing, and laboratory testing.View CfT Workspace
Sligo County CouncilDeadline: Aug 06The purpose of the Site Investigation Contract is to provide extensive site investigation works to inform the proposed detailed design activities for the N4 Active Travel Scheme – Collooney to CastlebaldwinMulti-Operator Framework Agreement for the provision of Site Investigation Services
The Land Development AgencyDublinDeadline: Jul 30BACKGROUND: -- The purpose of this Prior Information Notice (PIN) is to inform prospective candidates of the potential opportunity relating to The Land Development Agency (LDA), for the Site Investigations Framework. The LDA was established in September 2018 and is a key Irish Government land management initiative. The Government has committed to providing the LDA with equity capital of up to €8.75 billion to facilitate large scale delivery of housing. Our core objectives are to: • Coordinate appropriate State lands throughout the country for regeneration and development, opening up key sites for housing delivery. • Driving strategic land assembly, working with both public and private sector land owners; • Contributing towards the delivery of affordable housing; and • Become a leading influencer of housing and land management, through research and innovation DESCRIPTION OF THE FRAMEWORK: -- The framework is intended to cover site investigations works related to Geotechnical and Geoenvironmental specialties. The framework will be utilised to engage contractors to undertake intrusive site investigation works specified by the project engineer. Examples of the intrusive investigations include; • Trial Pits to 3m • Boreholes to 15m • Rotary Cores to 20m • Geotechnical Lab tests • Geoenvironmental Lab Tests The framework will be utilised for LDA Projects throughout Ireland. The sites will vary in size and complexity. Projects will be focused on residential use, with a variety of high-density developments and low-density developments. The development sites may be Greenfields or brownfields sites. The framework members will be expected to undertake the intrusive site investigations works on site and produce the accompanying reporting. They will be expected to have suitably qualified and experienced resources in Geotechnical and Environmental disciplines. Examples of the required reporting include; • Geotechnical o Factual Ground Investigation Report o Interpretative Ground Investigation Report • Geoenvironmental o Waste Classification Report o Geoenvironmental Soil Classification Drawings o GQRA It is anticipated that the framework will have a duration of four (4) years with an estimated value of four (4) million euros total. This figure is indicative only, as there is no guaranteed expenditure under the Framework Agreement. DESCRIPTION OF THE PROCUREMENT: -- The framework is intended to be established through a one-stage Open Procedure in accordance with Directive 2014/24/EU, with up to six economic operators appointed. Additional details will be provided in the tender documentation at the time of publication. MARKET ENGAGEMENT EVENT: -- The Contracting Authority invites interested parties to attend a Market Engagement Webinar on 03 July 2026 at 10:00am. To register, please follow the link below and complete the registration process. https://us06web.zoom.us/webinar/register/WN_hJTb0A5CTyKPSrk9ol8cpA For any queries or issues, please contact [email protected] PROPOSED DATES FOR ISSUE OF DOCUMENTATION: -- It is anticipated that the tender documentation will be issued in in early-mid July 2026Churchtown Landfill Site - Ground Investigation
Donegal County Council_1193LiffordDeadline: Jul 01Churchtown Landfill Site occupies an area footprint of approximately 9.7 hectares and it is located within the townland of Churchtown, near Lifford, Co. Donegal. The scope of the works required under this ground investigation will include the following: •One (1) rotary groundwater borehole to a maximum depth of 15m bgl, •Four (4) rotary leachate monitoring wells in waste to a target depth of 5-10m bgl. •Two (2) shallow groundwater wells along southern boundary between the waste body and the River Finn (drilled using a window sampling terrier drill rig)by hand-held window sampling techniques) to a target depth of 5 - 10m bgl, •Installation of groundwater/leachate monitoring standpipes in all boreholes;rotary borehole •Decommission one (1) borehole GW1. •Monitoring standpipes are to be developed a minimum of 5 times the well volume and until the fines are removed. •Purge all wells and undertake permeability testing within each well to assess well functionality; •In-situ testing (Hydraulic conductivity testing) in all completed groundwater monitoring wells; •Establish ground level and location of exploratory holes
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 09. September 2026.
- Who is the contracting authority?
- The contracting authority is Laois County Council.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.