Tipperary County CouncilClonmel, NenaghTED
Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
Background - The OPW, working in partnership with Tipperary County Council and other Local Authorities, commissioned and have completed the Shannon Upper and Lower River Basin Catchment Flood Risk Assessment and Management (CFRAM) Study. The Shannon Upper and Lower River Basin (‘Shannon’) CFRAM Study Area included Nenagh as an Area for Fu...
Civil Engineering Design, Environmental Assessment, Water Resource Management, Traffic Planning, Construction Project Management
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Tipperary County Council
- Published:
- July 13, 2026
- Deadline:
- September 02, 2026
- Topic:
- Civil Engineering Design
Tender description
Show full descriptionCollapse description
Background - The OPW, working in partnership with Tipperary County Council and other Local Authorities, commissioned and have completed the Shannon Upper and Lower River Basin Catchment Flood Risk Assessment and Management (CFRAM) Study. The Shannon Upper and Lower River Basin (‘Shannon’) CFRAM Study Area included Nenagh as an Area for Further Assessment (AFA) and identified that a flood relief scheme for the community would be appropriate to be further developed for implementation. To advance and implement a flood relief scheme for Nenagh, Tipperary County Council, supported by a Steering Group, intends to commission a Contract to develop and assist with the implementation of the Scheme. This Contract will be procured using one Consulting firm (hereafter referred to as “the Consultant”) to progress both the Engineering and Environmental elements of the Tender Specification. Project Objectives - The objective of this project is the identification, design and submission for planning consent of a Flood Relief Scheme, that is technically, socially, environmentally and economically acceptable, to alleviate the risk of flooding in the community of Nenagh to a determined Standard of Protection, to complete the detailed design, and to procure, manage and oversee the construction of that Scheme. The tasks that are to be carried out by the Consultant to fulfil this objective are described in detail within the Tender Specification.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
8Rahan Flood Relief Scheme — Engineering and Environmental Consultancy Services
Offaly County Council_448TullamoreDeadline: Sep 18Offaly County Council invites tenders for engineering and environmental consultancy services for the Rahan Flood Relief Scheme at Tullybeg, Rahan, County Offaly, on the River Clodiagh. The Scheme comprises approximately 430 metres of reinforced concrete flood defence wall along the right bank of the River Clodiagh, with embankment at the tie-in points, protecting residential properties and the wastewater treatment plant to the 1 percent AEP fluvial standard. The commission covers Stage (ii) statutory consent and detailed design, Stage (iv) construction-stage services and Stage (v) handover and defects period, under the Capital Works Management Framework. The construction works will be delivered by Office of Public Works direct labour; procurement of a works contractor is not included in this commission. The services include detailed design, hydrological and hydraulic modelling, ground investigation specification and interpretation, review and validation of the completed EIA and Appropriate Assessment screening, statutory consent documentation for approval under Part 8, works package preparation for direct labour delivery, Project Supervisor Design Process duties, construction-stage technical support and design authority, and handover documentation. The Scheme is funded by the Office of Public Works.Valuation Services for the Carrick On Shannon Flood Relief Scheme
Leitrim County Council_2136LeitrimDeadline: Aug 28Valuation services required in respect of land and property to be acquired for the Carrick On Shannon Flood Relief SchemeConsultant and Project Archaeologist Services for the Office of Public Works Flood Risk Management Division
Office of Public Works (OPW)TrimDeadline: Sep 21The Office of Public Works (OPW), is procuring consultant and project archaeologist services for its Flood Risk Management division to serve the needs of flood relief schemes’ project teams and arterial drainage maintenance teams nationwide. Project archaeologist services may also be utilised by local authorities across Ireland working in partnership with the OPW, for the purposes of developing and delivering flood relief schemes in their local areas, where they are the relevant project’s Sponsoring Agency and Contracting Authority.Engineering Technical Consultancy Services for the Thurles Inner Relief Road
Tipperary County CouncilClonmel, NenaghDeadline: Aug 27Tipperary County Council requires technical consultancy services to be provided by a multi-disciplinary Team for the progression of the Thurles Inner Relief Road. This comprises review of existing documents and completion of outstanding deliverables for Stages 3 and 4, and preparation of all deliverables through Stages 5 to 7 inclusive of the Infrastructure Guidelines, published by the the Department of Public Expenditure, NDP Delivery and Reform and the Technical Appraisal Framework published by the Department of Transport. The Scope is more fully described in the Brief of Services included in the Tender Documents.Civil and Structural Engineering Consultancy Services (Design) and PSDP Consultancy for Monaghan Blackwater Sluices Access Design
Office of Public Works (OPW)TrimDeadline: Aug 17To design improved access infrastructure to 22no sluices (non-return valves) located within the Monaghan Blackwater Arterial Drainage Flood Relief Scheme in Co. MonaghanFramework for Engineering and Environmental Consultancy Services
Inland Fisheries IrelandDublinDeadline: Sep 11IFI’s NBMP is establishing a multi-operator Framework Agreement(s) for the procurement of Engineering and Environmental Consultancy Services. The Framework Agreement(s) will establish the terms governing contracts to be awarded during the specified time period, with regards to price and capability to provide the service required. The Framework(s) will be for Engineering Consultancy and Design Services as outlined below; • Lot 1 – Civil/Structural/Hydraulic Engineering Services • Lot 2 – Environmental/Ecological Services • Lot 3 – Integrated Consultancy Services (less than 350K) • Lot 4 – Integrated Consultancy Services (more than €350K)Establishment of a Multi-Party Framework for Consultancy Services for Flood Risk Assessments (SFRAs) to inform Limerick City and County Council Plans with an Initial Contract
Limerick City and County Council_103432Limerick.Deadline: Sep 04Establishment of a Multi-Party Framework for the Provision of consultancy services for the preparation of a of Strategic Flood Risk Assessments (SFRAs) to inform Limerick City and County Plans. The Framework will be established in foot of an initial contract for the Strategic Flood Risk Assessment (SFRA) at an appropriate scale to inform proposed Variation no.4 to the Limerick Development Plan 2022-2028 (as varied).Framework agreement for consultancy engineering services
Sunnhordland Innkjøpsforum v/Bømlo kommuneBremnesSunnhordland Innkjøpsforum, on behalf of Bømlo, Stord, Fitjar, Kvinnherad and Tysnes municipalities, invites tenderers to a competition for a framework agreement for consulting engineering services. The agreement shall ensure flexible and predictable access to the necessary competence for planning, engineering design services and follow-up of building and construction projects. The framework agreement includes the entire project course - from early needs clarification and concept phase, via the preliminary project and detailed project, to the construction phase, commissioning, taking over and claims follow-up. The assignments will vary in nature, length and complexity, from smaller individual assignments to large projects and can be carried out parallel to several locations. The contract shall be able to cover simultaneous assignments for several business areas and locations in the region, and shall, thus, also handle capacity variations over time.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 02. September 2026.
- Who is the contracting authority?
- The contracting authority is Tipperary County Council.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.