Office of Public Works (OPW)TrimTED
Civil and Structural Engineering Consultancy Services (Design) and PSDP Consultancy for Monaghan Blackwater Sluices Access Design
To design improved access infrastructure to 22no sluices (non-return valves) located within the Monaghan Blackwater Arterial Drainage Flood Relief Scheme in Co. Monaghan
Structural Engineering, Civil Engineering Design, Water Resource Management
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Office of Public Works (OPW)
- Published:
- July 15, 2026
- Deadline:
- August 17, 2026
- Topic:
- Structural Engineering
Tender description
To design improved access infrastructure to 22no sluices (non-return valves) located within the Monaghan Blackwater Arterial Drainage Flood Relief Scheme in Co. Monaghan
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
8Engineering and Environmental Consultancy Services for Nenagh Flood Relief Scheme
Tipperary County CouncilClonmel, NenaghDeadline: Sep 02Background - The OPW, working in partnership with Tipperary County Council and other Local Authorities, commissioned and have completed the Shannon Upper and Lower River Basin Catchment Flood Risk Assessment and Management (CFRAM) Study. The Shannon Upper and Lower River Basin (‘Shannon’) CFRAM Study Area included Nenagh as an Area for Further Assessment (AFA) and identified that a flood relief scheme for the community would be appropriate to be further developed for implementation. To advance and implement a flood relief scheme for Nenagh, Tipperary County Council, supported by a Steering Group, intends to commission a Contract to develop and assist with the implementation of the Scheme. This Contract will be procured using one Consulting firm (hereafter referred to as “the Consultant”) to progress both the Engineering and Environmental elements of the Tender Specification. Project Objectives - The objective of this project is the identification, design and submission for planning consent of a Flood Relief Scheme, that is technically, socially, environmentally and economically acceptable, to alleviate the risk of flooding in the community of Nenagh to a determined Standard of Protection, to complete the detailed design, and to procure, manage and oversee the construction of that Scheme. The tasks that are to be carried out by the Consultant to fulfil this objective are described in detail within the Tender Specification.Multi Party Framework Agreement for Civil and Landscaping Architectural Design Services (including Traffic and Transport Engineering Services)
Dublin City CouncilDublinThe scheme involves reshaping the existing public realm to integrate sustainable drainage features such as detention basins and rain gardens to manage runoff, to enhance biodiversity through native planting and habitat creation and to increase public amenity through traffic management. The designs include, but are limited to the following: • Drainage and Ducting diversion and installation • Road Pavement • Kerbs, Footpaths and Paved Areas • Extensive Landscape Planting using predominately native Tree and Shrub Species. • Installation of benches and play equipment. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 6958414. Please note this project is subject to funding.Monaghan County Council wishes to tender for Engineering Consultancy Services (Phase 1 to 4) - Monaghan Town Southern Access Road (N54-N2)
Monaghan County CouncilMonaghan, Co MonaghanDeadline: Jul 13The Monaghan Southern Access Road is a 3.6km strategic route between the N54 to the west of Monaghan Town and the N2 to the east and is divided into three phases. Section 1 (380m) commenced at the N54 and was completed in 2004, Section 2 (1.4km) completed detailed design in 2009 and Section 3 (1.8km) is a protected corridor identified within the Monaghan County Development Plan. Monaghan County Council is seeking to appoint suitably qualified and experienced multidisciplinary engineering consultants to deliver Section 2 and Section 3 progressing through Phases 1 to 4. The project will be delivered in accordance with TII Project Management Guidelines and the Transport Appraisal Framework. These phases will include option selection, preliminary design, and preparation for statutory approvals, however Section 2 will re-commence at Phase 3. A central focus throughout will be the provision of high-quality active travel infrastructure and the activation of lands for development.Rahan Flood Relief Scheme — Engineering and Environmental Consultancy Services
Offaly County Council_448TullamoreDeadline: Sep 18Offaly County Council invites tenders for engineering and environmental consultancy services for the Rahan Flood Relief Scheme at Tullybeg, Rahan, County Offaly, on the River Clodiagh. The Scheme comprises approximately 430 metres of reinforced concrete flood defence wall along the right bank of the River Clodiagh, with embankment at the tie-in points, protecting residential properties and the wastewater treatment plant to the 1 percent AEP fluvial standard. The commission covers Stage (ii) statutory consent and detailed design, Stage (iv) construction-stage services and Stage (v) handover and defects period, under the Capital Works Management Framework. The construction works will be delivered by Office of Public Works direct labour; procurement of a works contractor is not included in this commission. The services include detailed design, hydrological and hydraulic modelling, ground investigation specification and interpretation, review and validation of the completed EIA and Appropriate Assessment screening, statutory consent documentation for approval under Part 8, works package preparation for direct labour delivery, Project Supervisor Design Process duties, construction-stage technical support and design authority, and handover documentation. The Scheme is funded by the Office of Public Works.Framework for Engineering and Environmental Consultancy Services
Inland Fisheries IrelandDublinDeadline: Sep 11IFI’s NBMP is establishing a multi-operator Framework Agreement(s) for the procurement of Engineering and Environmental Consultancy Services. The Framework Agreement(s) will establish the terms governing contracts to be awarded during the specified time period, with regards to price and capability to provide the service required. The Framework(s) will be for Engineering Consultancy and Design Services as outlined below; • Lot 1 – Civil/Structural/Hydraulic Engineering Services • Lot 2 – Environmental/Ecological Services • Lot 3 – Integrated Consultancy Services (less than 350K) • Lot 4 – Integrated Consultancy Services (more than €350K)Multi-Party Framework Agreement for provision of Engineering Consultancy and PSDP Services for Building Services Projects (2026-2030)
Cork City CouncilCorkDeadline: Jul 27Multi-Party Framework Agreement for provision of Engineering Consultancy and PSDP Services for Building Service Projects associated with Civil, Structural, Architectural, Mechanical and Electrical Design Disciplines (2026-2030). To assist in achieving the obligations and targets as indicated above, the Council is now seeking to establish a Framework of suitably competent Engineering Consultants to deliver Civil, Structural, Architectural, Mechanical and Electrical (CSA and M+E) technical consultancy services. These services will be related, but not limited to, building decarbonisation, energy efficiency upgrades, heat pump integration, building services optimisation, PV feasibility, electrical upgrades, BMS strategy, and related technical advisory across the Local Authority’s building stock.Single Supplier Framework Agreement for Design and Build Civil and Structural Contractor for DART+
Iarnród Eireann-Irish RailDublinDeadline: Oct 24This is a call to competition by IE for the procurement of a Design and Build Civil and Structural Contractor by way of a single supplier Framework Agreement, one Contractor will be the sole supplier. DART+ is a transformative programme of projects that aims to modernise and improve existing rail services in the Greater Dublin Area (GDA). The DART network will increase from 50 kilometres to 150 kilometres transforming commuter train travel in the Greater Dublin Area. It will provide a sustainable, electrified, reliable and more frequent rail service improving capacity in all rail corridors serving Dublin, bringing DART travel with all its benefits to new and existing communities. The provision of a new electrified fleet will improve capacity and reduce greenhouse gas emissions.Supply of engineering services for the design ISS and WDS
The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')BarcelonaThe services of the envisaged contract concern the supply of engineering services for the design of the ITER Isotope Separation System (ISS) and Water Detritiation System (WDS). The two systems can be described as chemical plants processing tritiated water and hydrogen isotope gas streams from the ITER machine. The detritiation of the water is done by WDS and the separation and purification of the hydrogen isotope gas streams is handled by ISS. Deliveries cover final design work on both systems to prepare their manufacturing, along with other tasks like qualification of components and support to the owner. The scope covers also qualification testing of components of ISS, WDS and the REMS the Radiological Environmental Monitoring System and prototyping tasks for some components of the tritium fuel cycle.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 17. August 2026.
- Who is the contracting authority?
- The contracting authority is Office of Public Works (OPW).
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.