Donegal County Council_1193LiffordTED
Letterkenny Northern Network Project - Land and Property Valuation Services
Donegal County Council proposes to acquire lands for the proposed Letterkenny Northern Network Project in the Letterkenny-Milford Municipal District, the site location is as per Appendix A. The Letterkenny Northern Network Project aims to develop the transport network to the North of Letterkenny Town. This strategic piece of infrastructur...
Civil Engineering Design, Traffic Planning, Property Valuation
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Donegal County Council_1193
- Published:
- August 17, 2026
- Deadline:
- September 07, 2026
- Topic:
- Civil Engineering Design
Tender description
Show full descriptionCollapse description
Donegal County Council proposes to acquire lands for the proposed Letterkenny Northern Network Project in the Letterkenny-Milford Municipal District, the site location is as per Appendix A. The Letterkenny Northern Network Project aims to develop the transport network to the North of Letterkenny Town. This strategic piece of infrastructure aims to provide a new enhanced connectivity link between Glencar and the Knocknamona Roundabout, reduce traffic congestion, support compact growth, and encourage modal shift. The scheme aims to provide a new road realignment of the existing L1152-1 Windyhall Road, include provision for segregated pedestrian and cyclist active travel facilities throughout the scheme, with reallocation of road space to accommodate this on existing sections of road.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
7 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock5 details capturedPublication number · Procedure reference · Procedure type · Contract type · +1 more
Performance locations
Unlock2 details capturedPerformance locations
Bidders and contractors
Unlock3 details capturedBidders and contractors · Address · Contact
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
9View CfT Workspace
Donegal County Council_1193Deadline: Aug 14Donegal County Council proposes to acquire lands for the proposed Letterkenny Northern Network Project in the Letterkenny-Milford Municipal District, the site location is as per Appendix A. The Letterkenny Northern Network Project aims to develop the transport network to the North of Letterkenny Town. This strategic piece of infrastructure aims to provide a new enhanced connectivity link between Glencar and the Knocknamona Roundabout, reduce traffic congestion, support compact growth, and encourage modal shift. The scheme aims to provide a new road realignment of the existing L1152-1 Windyhall Road, include provision for segregated pedestrian and cyclist active travel facilities throughout the scheme, with reallocation of road space to accommodate this on existing sections of road.Letterkenny Northern Network Project - Ground Investigation Contract
Donegal County Council_1193LiffordDeadline: Sep 14The Letterkenny Northern Network Project aims to develop the transport network to the North of Letterkenny Town. This strategic piece of infrastructure aims to provide a new enhanced connectivity link between Glencar and the Knocknamona Roundabout, reduce traffic congestion, support compact growth, and encourage modal shift. The scheme aims to provide a new road realignment of the existing L1152-1 Windyhall Road, include provision for segregated pedestrian and cyclist active travel facilities throughout the scheme, with reallocation of road space to accommodate this on existing sections of road. The works will involve carrying out a number of boreholes (rotary open-hole drilling and core holes), slit trenches, trial pits, pavement cores, dynamic cone penetrometer. The boreholes are provided to determine sufficient sub-ground conditions and depth to bedrock below proposed foundations. Trial pits are provided to obtain a geological description of the first meters of soils, to carry out in situ testing and to obtain soil samples. Pavement cores will provide information on the type of existing pavement at tie ins of the proposed road with the existing roads. Geophysical surveying can be used to aid in the detection of buried utilities. Slit trenches will provide information to establish the line, level, dimensions and type of services. Dynamic cone penetrometer will provide information about the soil strength and stiffness at areas of difficult access. Traffic Management will be required to provide a safe working environment for all works on or in the vicinity of the public roads. The plans showing the extent and type of work to be carried out at specific locations are indicated on the drawings included within the scope.View CfT Workspace
Donegal County Council_1193Deadline: Aug 12The Letterkenny Northern Network Project aims to develop the transport network to the North of Letterkenny Town. This strategic piece of infrastructure aims to provide a new enhanced connectivity link between Glencar and the Knocknamona Roundabout, reduce traffic congestion, support compact growth, and encourage modal shift. The scheme aims to provide a new road realignment of the existing L1152-1 Windyhall Road, include provision for segregated pedestrian and cyclist active travel facilities throughout the scheme, with reallocation of road space to accommodate this on existing sections of road. The works will involve carrying out a number of boreholes (rotary open-hole drilling and core holes), slit trenches, trial pits, pavement cores, dynamic cone penetrometer. The boreholes are provided to determine sufficient sub-ground conditions and depth to bedrock below proposed foundations. Trial pits are provided to obtain a geological description of the first meters of soils, to carry out in situ testing and to obtain soil samples. Pavement cores will provide information on the type of existing pavement at tie ins of the proposed road with the existing roads. Geophysical surveying can be used to aid in the detection of buried utilities. Slit trenches will provide information to establish the line, level, dimensions and type of services. Dynamic cone penetrometer will provide information about the soil strength and stiffness at areas of difficult access. Traffic Management will be required to provide a safe working environment for all works on or in the vicinity of the public roads. The plans showing the extent and type of work to be carried out at specific locations are indicated on the drawings included within the scope.R177 Armagh road to R215 Redcow Transport Corridor Link Consultancy Services
Louth County Council_381DundalkThe objective of the proposed scheme is to provide a transport corridor through the northern hinterland of Dundalk which will cater for growth and development over the 20 year period 2025 2044 during which time the population of the town is expected to grow significantly. The lands to the north of the town centre have been zoned for both commercial and residential use. Additional infrastructure is required to enable access to these areas and also to cater for new locally generated traffic. The proposed scheme will cater for a medium level of development in the future. This scenario is considered the most appropriate level of sustainable development for the aforementioned period. The existing environment consists of a former golf course and agricultural land with a mixture of pasture and tillage fields. The proposed road scheme will allow for development of the lands on both sides of the route and will also help avoid the likely build up of traffic congestion which would occur in Dundalk town centre. The proposed scheme will include for either a new overbridge or upgrades to existing bridge infrastructure on the Dublin to Belfast railway line and potential junctions, linking to the existing and proposed road networks.DCC Contract for Construction of the North Circular Road (Dorset Street Lower to Amiens Street) Active Travel Scheme
Dublin City CouncilDublinDublin City Council aims to enhance the quality of life for its residents by developing an integrated Active Travel Network. This comprehensive network is designed to foster connections among individuals via pedestrian pathways, segregated cycle provision and other environmentally friendly transportation alternatives. The enhancement of accessibility and interconnectivity for people walking, wheeling and cycling within this network is anticipated to play a pivotal role in mitigating carbon emissions originating from transport activities. The Council’s objective is to augment the existing 40km network into a seamlessly connected 314km network spanning the entire city. The North Circular Road (Dorset Street Lower to Amiens Street) Active Travel Scheme is one of the projects identified under this initiative. The North Circular Road (Dorset Street Lower to Amiens Street) Active Travel Scheme extends along North Circular Road and Portland Row, between Dorset Street Lower and Amiens Street, for a length of approximately 1.1km. The scheme includes the provision of segregated cycle facilities, improved pedestrian facilities (footpath and junction upgrades), ducting, carriageway resurfacing, etc.. The scheme also includes the upgrade of three signal-controlled junctions to improve pedestrian and cyclist facilities; the three junctions are at Belvedere Place, Fitzgibbon Street and Summerhill. It also ties into two further junctions at Dorset Street Lower and at Amiens Street (The Five Lamps) junction. The scheme comprises the following:- Reconfiguration of Carriageway for Inclusion of Cycle Lanes - Site Clearance - Pavement Works - Kerbs and Footways - Traffic Islands - Public Lighting - Traffic Signs and Road Markings - Drainage Works - Traffic Signals and Ducting - Utilities - Landscaping and Public Realm Works - Bus Shelters (foundations only) - Bike Stands - Temporary Traffic Management. For further information, please refer to documentation available to download from wwwN70 Sneem to Blackwater Bridge (Tahilla to Doon) Road Project
Kerry County Council_1204TraleeThe project comprises the construction of a 3.0 km section of the N70 National Secondary Road between Sneem and Blackwater Bridge. The project commences in the townland of Talilla, approximately 6km east of Sneem village, and terminates in the townland of Doon. Works generally involve the widening and realignment of the existing N70 to provide a Type 3 Single Carriageway with active travel facilities.Refurbishment and Extension of New Ross Library
Wexford County CouncilWexfordDeadline: Aug 17The works comprise the construction of a new extension wrapping the south, west and north elevations of the existing library building, the creation of a new first floor within the existing structure, and a full internal refurbishment to provide modern, accessible library and community facilities. The project is to be procured under the restricted procedure.Dublin City Council - Contract for Dodder Greenway Milltown Road - Dodder Walk to Dundrum Road Active Travel Scheme
Dublin City CouncilDublinDeadline: Aug 27Dublin City Council aims to enhance the quality of life for its residents by developing an integrated Active Travel Network. This comprehensive network is designed to foster connections among individuals via pedestrian pathways, segregated cycle provision, and other environmentally friendly transportation alternatives. The enhancement of accessibility and interconnectivity for people walking, wheeling and cycling within this network is anticipated to play a pivotal role in mitigating carbon emissions originating from transport activities. The council’s objective is to augment the existing 40km network into a seamlessly connected 314km network spanning the entire city. The Dodder Greenway Milltown Road - Dodder walk to Dundrum Road Active Travel Scheme is one of the projects identified under this initiative. The Dodder Greenway Milltown Road - Dodder walk to Dundrum Road Active Travel Scheme extends along Milltown Road between Dodder walk and Dundrum Road for a length of 1.2km. The Scheme includes the provision of segregated cycle facilities, improved pedestrian facilities (footpath and junction upgrades), ducting, resurfacing etc. the scheme also includes the upgrade of two signal-controlled junctions to improve pedestrian and cyclist facilities, the two junctions are: Milltown Rd and Churchtown Rd junction and Milltown Rd and Dundrum Rd junction. The Scheme comprises: - Re-configuration of existing carriageway for inclusion of cycle provision - Site Clearance - Pavement works - Kerbs and Footways - Traffic Islands - Public lighting - Traffic signs and road markings - Drainage works - Traffic signals and Ducting - Utilities upgrades - Landscaping and Urban Realm Works - Bus Shelters (foundation only) - Bike Stands - Temporary Traffic Management Please note that this project is subject to funding. For further information please refer to documentation available to download from www.etenders.gov.ie Resource ID 8702210Single Supplier Framework Agreement for Design and Build Civil and Structural Contractor for DART+
Iarnród Eireann-Irish RailDublinDeadline: Oct 24This is a call to competition by IE for the procurement of a Design and Build Civil and Structural Contractor by way of a single supplier Framework Agreement, one Contractor will be the sole supplier. DART+ is a transformative programme of projects that aims to modernise and improve existing rail services in the Greater Dublin Area (GDA). The DART network will increase from 50 kilometres to 150 kilometres transforming commuter train travel in the Greater Dublin Area. It will provide a sustainable, electrified, reliable and more frequent rail service improving capacity in all rail corridors serving Dublin, bringing DART travel with all its benefits to new and existing communities. The provision of a new electrified fleet will improve capacity and reduce greenhouse gas emissions.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 07. September 2026.
- Who is the contracting authority?
- The contracting authority is Donegal County Council_1193.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.