LandsvirkjunReykjavíkTED
Kaplan Upgrade at Steingrímsstöð
Landsvirkjun seeks a supplier to design, supply, install and commission an upgrade of two existing Kaplan turbine units, including new runners, bearings and hydraulic systems. The plan is to have an oilfree kaplan turbine. The supply and installation shall take place in Q3 and Q4 of 2029.
Turbines, Pumps, Valves & Fittings
No credit card · Instant access
Content at a glance
- Tender type:
- Tender
- Contracting authority:
- Landsvirkjun
- Published:
- July 06, 2026
- Deadline:
- August 06, 2026
- Topic:
- Turbines
Tender description
Landsvirkjun seeks a supplier to design, supply, install and commission an upgrade of two existing Kaplan turbine units, including new runners, bearings and hydraulic systems. The plan is to have an oilfree kaplan turbine. The supply and installation shall take place in Q3 and Q4 of 2029.
Further details
With free access, documents, deadlines and submission notes are available in a structured format.
- Core requirements of the tender prioritized and prepared
- Deadlines, eligibility criteria and documents in one workflow
- Guidance for structured bid preparation
- Automatically discover matching follow-up tenders
30 days free · no credit card · cancel anytime
All procurement details
Buyer, lots, participants, locations, documents, and procedure data have already been captured. Open any area to see the complete information in your workspace.
6 data areas available
30 days free · no credit card · cancel anytime
Documents
Unlock50 details capturedDocuments · Document bundle
Buyer
Unlock3 details capturedBuyer · Address · Contact
Lots
Unlock1 detail capturedLots LOT-0001
Procedure data
Unlock4 details capturedPublication number · Procedure type · Contract type · Regulation level
Performance locations
Unlock2 details capturedPerformance locations
Publisher
Unlock3 details capturedPublisher · Address · Contact
Related tenders
10Upgrade of Tory GWS
Tory Island Group Water SchemeDonegalDeadline: Jul 21Tory Group Water Scheme (GWS) wishes to appoint an Engineering Services Provider (ESP) using the standard conditions of engagement COE1 for the design of a disinfection system and upgrade of slow sand filter including ancillary pipework required to install any treatment processes to achieve compliance with the European Drinking Water Standards. The service is to include for all Civil and Hydraulic Design, process engineering services as required; any environmental / ecological evaluations required; preparation of construction tender docs, administration of tender process (publication, clarifications, evaluation, etc.); award and management of construction contract. The ESP will also be required to act as PSDP for the Project.Campus IT Network Upgrade
Irish National Stud DACTullyDeadline: Jul 01ITT for Design, supply and install of network infrastructure upgradeLonsdale Road Upgrade Works at National Technology Park, Limerick
IDA IrelandDublinThe works include road resurfacing, construction of new pedestrian entrances with tactile paving and drop kerbs, replacement of existing kerbs and installation of new road signage. The approximate area of the works is 1 hectare. The works are to take place at Lonsdale Road Upgrade Works at National Technology Park, LimerickTrack upgrade Works at Youghal Greyhound stadium
Rásaíocht Con ÉireannLimerickDeadline: Jul 31The proposed works at Youghal include removing all the silica sand and transferring it to an area onsite then remove the terram and dispose of. The next part is to ruffle the existing drainage stone and the lay 4 inches of drainage stone and put down new teram and lay 4 inches of coarse rabbit sand on top of the teram and then relay the silica sand previously removed. This work would have to be done in a two-week period as we intend on closing the track during the works. We would also require the cleaning of the drain on the infield of the track and insert a drain in the infield to allow clear drainage.Silicon Austria Labs – Upgrades for magnetic thin film sputtering deposition equipment
Silicon Austria Labs GmbHGrazThe aim of this procurement procedure was to award the contract to the best bidder identified during the procurement procedure for the supply, installation, commissioning, and associated services (including documentation and trainings) of modules enabling the extension of the range of process capabilities related to the sputtering deposition of magnetic thin films and multilayers for Silicon Austria Labs GmbH.Replacement of LED lighting at Hallingby School
Ringerike KommuneHØNEFOSSDeadline: Aug 25Ringerike municipality invites tenderers to a competition for the replacement of existing lighting fixtures to energy efficient LED fixtures that provide better energy efficiency and reduced maintenance costs. The replacement shall take place at Hallingby school.Supply of Underwater PIV System Upgrade
Technische Universiteit DelftDelftthe supply of an upgrade to the existing underwater Particle Image Velocimetry (PIV) system used in the Ship Hydromechanics Laboratory (towing tank facility) of the Faculty of Mechanical Engineering. The scope includes, inter alia: •high-resolution cameras (approx. 25 MPixel) •lenses and optical components •mounting systems •software modules •integration with existing hardware and software infrastructure See attached documentCharging Infrastructure at Hårlev Station
Lokaltog A/STaastrupThe Contractor undertakes to design and perform a full charging infrastructure system com-patible with the battery-powered rolling stock described in Contract appendix 1, Requirements Specification. The Contract includes a complete power supply infrastructure and overhead contact line sys-tem, to be able to perform dynamic and static charging for battery trains: Hårlev Station • Overhead contact line system covering the three main tracks at the station • 50/25KV transformer solution to ensure power to the overhead contact line system • Detailed design • 400V power to train maintenance systems and heating and cleaning • Safety and interoperability approval • All necessary cable works on the station including cable trays • Immunization of the station signaling systems • Low voltage: Replacement of existing electrical panels with Class II panels • Earthing & bonding the station and staging area, and creating new cable routes • Test and Commissioning including handover to operation • SCADA system • Maintenance and operation of the SCADA systemP-Cable 3D seismic upgrade
UiT Norges arktiske universitetTromsøThe procurement is for the delivery of components and services connected to upgrading UiT ́s existing P-Cable seismic system, which is a national infrastructure. The procurement includes new active streaming sections, upgrading of electronics (digitiser and network electronics), junction box components, connections and the accompanying mechanical parts, as well as work on disassembly, assembly and integration of the components in the existing system. The procurement also includes the necessary integration and testing carried out by the supplier, as well as all other relevant costs. The procurement does not include the procurement of a new system, but the replacement and upgrade of selected components in the current P-Cable infrastructure. The existing system components, software, handling equipment and other infrastructure will continue to be and used together with the new components.Energy Upgrade Works at Áras an Chontae, Castlebar and Westport Leisure Park, Westport.
Mayo County Council_1127CastlebarDeadline: Jul 28The Works comprise energy retrofit measures to four no. buildings in the ownership of Mayo County Council, located across two sites within County Mayo. The Áras an Chontae Campus, Castlebar, comprises three no. buildings: the Architects Office / RTC, the Annex Building, and the Áras Headquarters. Westport Leisure Park comprises one no. standalone building in Westport. All buildings are to receive energy retrofit works as part of the Energy Efficiency and Decarbonisation Pathfinder Programme.
Frequently asked questions about this tender
- How can I apply for this tender?
- Create a free account on Auftrag One. You will then see all documents, deadlines and submission notes in a structured workflow.
- What is the submission deadline?
- The submission deadline is 06. August 2026.
- Who is the contracting authority?
- The contracting authority is Landsvirkjun.
- Which documents are needed to get started?
- Typically you need the service description, proof of eligibility, deadline notes and possibly form sheets. On Auftrag One these items are displayed in prioritized order.